PEKERJAAN EARTHWORK DENGAN PENERAPAN METODE M-PERT DI AREA KAWASAN INDUSTRI

Sugeng Rahardjo (Unknown)



Article Info

Publish Date
23 Jul 2025

Abstract

Earthwork Work with the Application of the PERT-Method in the Industrial Estate area. At the present time the need for industrial area in Jakarta and its surrounding areas is much higher than its availability. The average delay in earthwork is 6.1% white the weight of earthwork work in a construction project reacted 13.48%.In order to overcome the delay in implementation time, researchers used the M-PERT method can increase the accuracy of implementation time by 99%, The processing The results of the statistical analysis obtained the influential factors in earthwork work on industrial areas based on the M-PERT method whice are: exavator selection, similarities in the network, combining activities, understanding PERT activities, manual calculation, recalculating PERT, increasing crashing time, identification of cut & fill and effects duration of activity. Based on the validation results on the ripening work of the G1 plots in the industrial zone of Krakatau II Cilegon Banten, the application of M-PERT method, the result is 72 , 55 days, whice produced the error rate of 1.99%.

Copyrights © 2019






Journal Info

Abbrev

jce

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Engineering Industrial & Manufacturing Engineering Materials Science & Nanotechnology Mechanical Engineering Transportation

Description

Journal of Civil Engineering (eISSN 2579-9029/pISSN 2086-1206) is a new journal that preceded by the previous Civil Engineering Department ITS Journal which was well known as Jurnal Teknologi dan Rekayasa Sipil (TORSI). TORSI journal was established in March 1981. In 2009, TORSI journal name was ...