Integrasi WLA dan Total Expected Cost (TEC) untuk Optimalisasi Tenaga Kerja Perakitan Ridge Table di PT Romi Violeta

Muhammad Iqbal Suseno Putra (Universitas 17 Agustus 1945)
Sajiyo Sajiyo (Universitas 17 Agustus 1945 Surabaya)



Article Info

Publish Date
10 Apr 2026

Abstract

Consistent production target shortfalls are a critical indicator of work system inefficiency in manufacturing. PT Romi Violeta recorded Final Assembling output for the Ridge Table product at only 95% of target on average during September–December 2025, with a cumulative deficit of 75 units. This study aimed to identify root causes through: (1) Stopwatch Time Study to establish standard time and output, (2) Work Load Analysis (WLA) to measure workload distribution across 14 operators, and (3) the IFRC questionnaire to assess fatigue levels. WLA results revealed that 5 of 14 operators were in overload condition (N > 1,10), acting as the primary assembly line bottleneck. The proposed remedy—adding 2 mobile helper workers—is projected to normalize workload distribution and guarantee stable target achievement of 7 units/day per operator with no bottleneck risk.

Copyrights © 2026






Journal Info

Abbrev

jutin

Publisher

Subject

Decision Sciences, Operations Research & Management Energy Engineering Industrial & Manufacturing Engineering Mechanical Engineering

Description

Jurnal Teknik Industri Terintegrasi merupakan jurnal yang dikelola oleh Program Studi Teknik Industri Fakultas Sains dan Teknologi Universitas Pahlawan Tuanku Tambusai yang menjebatani para peneliti untuk mempublikasikan hasil penelitian di bidang ilmu teknik dan teknik industri mencakup proses ...