Articles

Found 7 Documents
Search

IbM WIRA USAHA PANTI ASUHAN MELALUI RANCANG BANGUN ALAT PEMBUAT ROTI DI KECAMATAN RUNGKUT DAN KEBONSARI SURABAYA Endang Setyowati; Sajiyo Sajiyo; Ida Ayu Sri Brahmayanti; Ida Ayu Nuh Kartini
JPM17: Jurnal Pengabdian Masyarakat Vol 1 No 02 (2015)
Publisher : Lembaga Penelitian dan Pengabdian kepada Masyarakat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30996/jpm17.v1i02.498

Abstract

Reformatory as social worker represent a[n service place which can assistskilled [of] child take care of, especially Orphan reformatory " Siti Fatimah"and reformatory Putri " Aisyiyah II" Surabaya. Pursuant to result of surveyantecedent and result of interview of problems [of] arising out [is] the lack ofeducation and skill, especially skill instructing [at] enterprenuership. From theproblems above hence solution which on the market to face the problems ofReformatory of Orphan of Siti Fatimah and the following ReformatoryKebonsari : a) give the skill in making bread; b) make the appliance of ovenbread and its equipment; and adjacent c)memberikan by kontinue (berkesinambungan)so that the orphan can make the bread and become theenterprenuership Result from activity program this Ibm, in the form of preciseadjusment of technology utilize the oven of bread and method of bread making,with the expectation capacities 3200 pcs / day ( 400 pcs / clock ). Sedanhgkandesign to develop;build the oven bread with the specification and size measureof oven of bread sbb : substance oven from stainles steel, long : 40 Cm ; wide :30 Cm; high : 30 Cm ; Jjmlah Rack : 3 Rack; capacities : 200 pcs / clock ; andsum up the Unit : 2 Excellence design to develop;build the oven bread : Formthe simple oven, part of back part step aside for convex impress the ergonomisand more guaranting [of] security to hand or organ yan come into contact with.40 x 30 Cm highly 30 Cm, lighter disampning also only need the small
ANALISIS BEBAN KERJA SERTA PENGARUHNYA TERHADAP KELELAHAN KERJA DAN PRODUKTIVITAS KERJA DI PT. ELANG JAGAD Tasrikhut Tamam; Sajiyo Sajiyo
JIEMS (Journal of Industrial Engineering and Management Systems) Vol 16, No 1 (2023): Journal of Industrial Engineering and Management Systems
Publisher : Universitas Bunda Mulia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30813/jiems.v16i1.4565

Abstract

PT. ELANG JAGAD adalah perusahaan metalworking yang memproduksi tungku kompor, kursi stenliss, dan produk produk lainnya Dalam semua jenis pekerjaan, beban kerja menjadi salah satu faktor yang  sangat penting. Tujuan dari penelitian ini adalah menganalisis beban kerja, tingkat kelelahan dan gangguan otot yang diterima oleh pekerja di PT.ELANG JAGAD. Diharapkan  penelitian ini adalah mengetahui seberapa besar beban kerja  tingkat kelelahan dan gangguan otot yang diterima pekerja serta menunjukkan beban kerja, tingkat kelelahan dan gangguan otot yang paling tinggi yang diterima pekerja. Metode yang dipakai untuk menganalisa beban fisik adalah Cardivascular Load (CVL),. Sedangkan metode untuk menganalisa beban kerja mental menggunakan metode NASA-TLX, dan Analisia kelelahan kerja menggunakan kuesioner 30 item kelelahan dan gangguan otot menggunakan kuesioner Nordic Body Map. Berdasarkan Analisa beban kerja fisik yang paling besar diterima  Pekerja 1 dengan nilai % CVL sebanyak 61,31% Sedangkan pekerja yang mengalami beban kerja fisik paling ringan adalah Pekerja 6 dengan nilai % CVL sebanyak 34,27%. Hasil analisa beban kerja mental diperoleh hasil beban kerja mental paling besar dirasakan  oleh Pekerja 1 dengan skor 83 dan yang terendah yaitu pada Pekerja 6 dengan skor 54 masuk kategori sedang. Dan tingkat kelelahan tertinggi adalah Pekerja 2 dengan skor 70 dan terendah adalah pekerja 4 dengan skor 47 sedangkan tingkat risiko gangguan otot tertinggi dimiliki  pekerja 1 dengan skor dan terendah adalah pekerja 3 yang memiliki skor 24.
EVALUATION OF THE IMPLEMENTATION OF OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEM (SMK3) AT PT. PELABUHAN Dzaky Ekki Wibowo; Sajiyo Sajiyo
Jurnal Ekonomi Vol. 12 No. 3 (2023): Jurnal Ekonomi, 2023, September
Publisher : SEAN Institute

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Issues related to occupational safety and health in general are still neglected, especially in Indonesia. This can be proven by the high rate of work accidents. At PT. Pelabuhan recorded several work accident incidents of 469 cases in the 2019-2022 period. The occupational safety and health management system (OSHMS) is a form of prevention and reduction of the risk of work accidents. This study aims to evaluate the application of OSHMS PT. Pelabuhan as an effort to develop the application of OSHMS and improve HSSE performance at PT. Pelabuhan. This study will take OSHMS data according to PP 50 of 2012 with 166 criteria (Advanced Level). Based on the results of the audit and analysis carried out, it is known that the number of criteria fulfilled is 156 criteria with a percentage of 93.97% and there are 10 criteria of non-conformity percentage 6.03% (minor category). These results state the level of implementation of OSHMS at PT. Pelabuhan is included in the (Satisfactory) category. Furthermore, corrective actions and recommendations will be made for non-conformity in OSHMS.
ANALISIS TINGKAT BISING PADA MESIN MOLEN DAN PENGARUH TERHADAP PRODUKTIVITAS KERJA DI CV. XYZ Athok Urrahman; Sajiyo Sajiyo
Jurnal Taguchi : Jurnal Ilmiah Teknik dan Manajemen Industri Vol. 3 No. 1 (2023): Jurnal Taguchi : Jurnal Ilmiah Keilmuan Teknik dan Manajemen Industri
Publisher : LPPM Universitas Bina Bangsa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46306/tgc.v3i1.96

Abstract

Noise is still a serious problem. Like other problems, noise can also reduce the quality of life in humans and create a threat of danger to humans. Usually the noise occurs in traffic, and industry. Noise in the workplace must always be controlled to create a safe work area for workers. Problems such as health problems, psychological disorders, and communication disorders are the main problems that need to be controlled. Therefore this study aims to control noise that exceeds the applicable regulations. After leq analysis, the results obtained are operator point 3 = 104 dBA operator point 5 = 95.6 dBA, operator point 2 = 92.4 dBA, operator point 1 = 88.4 dBA, and operator point 4 = 85.5 dBA with an average -average 93.2 dBA . Then the results of the hypothesis test showed a correlation value of -0.885 and a significant value of 0.019 <0.05, which means that there is a negative and significant relationship between noise and productivity
Analysis of Quality Control Strategy Using The Statistical Process Control (SPC) Method In The Mass Product Housing Project at Java Residence Cluster Kukuh Budi Prasetiya; Andi Patriadi; Sajiyo Sajiyo
Asian Journal of Social and Humanities Vol. 3 No. 4 (2025): Asian Journal of Social and Humanities
Publisher : Pelopor Publikasi Akademika

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59888/ajosh.v3i4.476

Abstract

The advancement of industrial activities requires high-performance management to achieve desired outcomes, particularly in complex projects such as construction. This study aims to analyze the application of the Statistical Process Control (SPC) method to improve product quality in the construction project of the Java Residence Cluster in Sidoarjo. Managing cost, time, and quality remains a significant challenge in construction projects. This research focuses on identifying and addressing complaints or defects in housing units that affect the quality of the project, using SPC as a quality control method. Data were collected from primary sources, specifically from the staff of PT. Mitra Usaha Konstruksi, as well as secondary data from relevant literature. The analysis shows that the application of SPC successfully reduced the number of complaints or defects from 5.95 complaints per unit in Cluster 1 Phase 3 to 3.12 complaints per unit in Cluster 2 Phase 1, with an effectiveness rate of 52.47%. Pareto analysis identified that the majority of complaints were related to doors, windows, and wall paint, suggesting that these areas should be prioritized for improvement in future construction projects. The study recommends the continued use of SPC to improve product quality and identify the root causes of defects to ensure compliance with the developer's quality targets.
Analysis of Time and Budget Efficiency In The Bungur-Kedoyo Road Project Using Earned Value Method M. Sulton Bahrudin; Andi Patriadi; Sajiyo Sajiyo
Asian Journal of Social and Humanities Vol. 3 No. 4 (2025): Asian Journal of Social and Humanities
Publisher : Pelopor Publikasi Akademika

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59888/ajosh.v3i4.477

Abstract

The Bungur-Kedoyo road construction project in Tulungagung Regency represents a critical infrastructure initiative aimed at enhancing connectivity and transportation efficiency. However, challenges in managing time and cost effectively remain significant in ensuring project success. This study aims to evaluate the performance of the project using the Earned Value Method (EVM), a comprehensive framework that integrates cost and schedule analysis. EVM metrics, including Schedule Estimate To Completion (SETC), Schedule Estimate At Completion (SEAC), Budget Estimate To Completion (BETC), and Budget Estimate At Completion (BEAC), were employed to monitor and forecast project progress. The findings indicate that the project is largely on schedule, with an estimated additional week required to complete the remaining 96.908% of work, extending the contracted timeline of 180 days slightly. The remaining cost is projected at Rp. 273,570,437.28, and the total expenditure remains below the contract value at Rp. 8,847,685,552.51 out of Rp. 10,640,186,000. These results highlight the effectiveness of EVM in providing precise tracking and forecasting, ensuring the project stays within budget while achieving its objectives. The study concludes that EVM is a valuable tool for managing complex construction projects, offering actionable insights to improve time and cost efficiency for similar future endeavors.
Time Analysis and Cost Estimation of Construction of Village Water Distribution Works For Clean Water Needs (Case Study of Tamangil Nuhuten Village, South Kei Besar Kec. Southeast Maluku Regency) Paschal Rumihin; Andi Patriadi; Sajiyo Sajiyo
Asian Journal of Social and Humanities Vol. 3 No. 5 (2025): Asian Journal of Social and Humanities
Publisher : Pelopor Publikasi Akademika

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59888/ajosh.v3i5.480

Abstract

Water is a fundamental need for all living things, especially humans, to support survival. Tamangil Nuhuten Village, located in South Kei Besar Sub-district, Southeast Maluku Regency, faces great challenges in meeting the clean water needs of its residents. This study was conducted to evaluate the clean water distribution scheme through technical and economic approaches. The methods used included field surveys, water distribution simulation using EPANET 2.2 software, infrastructure development cost analysis, and a comprehensive assessment of construction time requirements. The results of the analysis show that the hilly topography of the village is the main obstacle in water distribution. To overcome this obstacle, a gravity-based distribution system is recommended. Based on EPANET 2.2 simulation, this system is able to fulfill the community's clean water needs efficiently. The total cost of building the distribution network is estimated at Rp8,202,383,000.00 with a construction time of six months. Furthermore, this research provides an in-depth analysis of the required time allocation for each construction phase to ensure project feasibility and efficiency. This research is expected to be a reference for the government and related parties in designing a water distribution system that is effective, sustainable, and in accordance with the needs of the Tamangil Nuhuten Village community.