Studi Komparatif MILP dan Heuristik pada Job Shop Scheduling Problem: Minimasi Makespan dan Total Tardiness

Andriansyah Hamid (Program Studi Teknik Industri Universitas Syiah Kuala)



Article Info

Publish Date
16 Jul 2026

Abstract

This study presents a comprehensive analysis of the Job Shop Scheduling Problem (JSSP) with two commonly used objectives in manufacturing: minimizing makespan and minimizing total tardiness. Two approaches are directly compared: an exact model based on Mixed Integer Linear Programming (MILP) solved using Gurobi, and a fast heuristic based on dispatching rules and local search. The study is conducted on 10 random instances (10 jobs, 5 machines, 5 operations per job). The results show that the heuristic is highly competitive for the makespan objective (average gap of 9.25% with approximately 240 times faster computation than MILP). For the tardiness objective under a balanced configuration, the heuristic yields an average defined gap of 52.39% with a runtime cost about 6.0 times slower than MILP. This paper provides a reproducible baseline, data-driven analysis, and technical directions for improving both the quality and efficiency of tardiness-focused heuristics in future research.

Copyrights © 2026






Journal Info

Abbrev

invasi

Publisher

Subject

Control & Systems Engineering Decision Sciences, Operations Research & Management Engineering Industrial & Manufacturing Engineering Transportation

Description

Jurnal INVASI: Industri dan Inovasi adalah jurnal ilmiah yang diterbitkan oleh Program Studi Teknik Industri (PSTI), Fakultas Teknik, Universitas Teuku Umar melalui proses review. Jurnal ini bertujuan untuk mempublikasikan hasil penelitian di bidang Teknik Industri yang terbit dua kali dalam setahun ...