ERGOTRONIK: Jurnal Teknik Industri dan Elektro
Vol 1 No 1 (2026): Jurnal Teknik Industri dan Elektro

Analisis Keandalan Sistem Backup Power Menggunakan Generator dan UPS di Hotel 101 Bogor Suryakencana

Chandra Ramdan Kusumah (Universitas Teknologi Nusantara)
Dewi Rahmawati (Universitas Teknologi Nusantara)



Article Info

Publish Date
30 Jun 2026

Abstract

Reliability of electricity supply is a crucial factor for the hotel industry to maintain guest comfort and smooth operations. Hotel 101 Bogor Suryakancana relies on electricity from PLN as its primary source and a backup system consisting of a 750 kVA generator set and UPS. This study aims to analyze the reliability of the backup power system, including the Automatic Transfer Switch response time, the generator supply capacity, and the role of the UPS in transferring power sources during a PLN power outage. The results show that the load transfer time from PLN to the generator via the ATS averages 10 seconds, and the UPS is able to maintain uninterrupted power supply to the servers during the transfer. Calculations indicate that the generator capacity is sufficient to back up the entire hotel load with a nominal current of 1140.85 A and an ACB setting of 1711.28 A.  This indicates that the backup power system has good reliability in maintaining continuity of electricity supply. Suggestions are given for routine testing and maintenance of the ATS and UPS systems to maintain optimal performance.

Copyrights © 2026






Journal Info

Abbrev

Ergotronik

Publisher

Subject

Description

ERGOTRONIK: Jurnal Teknik Industri dan Elektro is a scientific journal published by Lembaga Penelitian dan Pengabdian Masyarakat Universitas Teknologi Nusantara. The journal focuses on the publication of research findings, scientific reviews, case studies, and technological developments in the ...