Chandra Ramdan Kusumah
Universitas Teknologi Nusantara

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Analisis Keandalan Sistem Backup Power Menggunakan Generator dan UPS di Hotel 101 Bogor Suryakencana Chandra Ramdan Kusumah; Dewi Rahmawati
Jurnal Teknik Industri dan Elektro Vol 1 No 1 (2026): Jurnal Teknik Industri dan Elektro
Publisher : Lembaga Penelitian dan Pengabdian Masyarakat Universitas Teknologi Nusantara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.66185/ergotronik.v1i1.47

Abstract

Reliability of electricity supply is a crucial factor for the hotel industry to maintain guest comfort and smooth operations. Hotel 101 Bogor Suryakancana relies on electricity from PLN as its primary source and a backup system consisting of a 750 kVA generator set and UPS. This study aims to analyze the reliability of the backup power system, including the Automatic Transfer Switch response time, the generator supply capacity, and the role of the UPS in transferring power sources during a PLN power outage. The results show that the load transfer time from PLN to the generator via the ATS averages 10 seconds, and the UPS is able to maintain uninterrupted power supply to the servers during the transfer. Calculations indicate that the generator capacity is sufficient to back up the entire hotel load with a nominal current of 1140.85 A and an ACB setting of 1711.28 A.  This indicates that the backup power system has good reliability in maintaining continuity of electricity supply. Suggestions are given for routine testing and maintenance of the ATS and UPS systems to maintain optimal performance.