The construction industry heavily relies on highly efficient supply chain management (SCM) to ensure project success, minimize costs, and guarantee timely delivery. This study evaluates the supply chain performance of a construction project at PT. Bingkai Langit Construction, which experienced material procurement constraints. The objective is to measure performance using the SCOR 12.0 framework and formulate improvement strategies. Using a descriptive analysis method, this study evaluates five SCOR indicators: Reliability, Responsiveness, Agility, Cost, and Asset Management. Data were collected through observations and questionnaires from 37 respondents, analyzed using the Frequency Index method, and finalized via a Focus Group Discussion (FGD) with the strategic management team. The results show an overall "Good" performance score of 76.8%. Individual indicators scored: Reliability (79.73%), Cost (77.70%), Responsiveness (76.13%), Agility (75.45%), and Asset Management (75.00%). To address weaknesses in asset management and agility, priority strategies include implementing Just-In-Time (JIT) delivery for structural materials, optimizing heavy equipment utilization, reducing material waste, and aligning logistics schedules.
Copyrights © 2026