PERFORMA : Media Ilmiah Teknik Industri
Vol 4, No 2 (2005): PERFORMA Vol. 4 No 2, September 2005

Minimasi Slack Time pada Penjadwalan Make To Order Job Shop

Ali Parkhan (Fakultas Teknologi Industri, Universitas Islam Indonesia, Yogyakarta)
Hermawan Adi Tanjung (Fakultas Teknologi Industri, Universitas Islam Indonesia, Yogyakarta)



Article Info

Publish Date
01 Sep 2007

Abstract

In manufacturing Make to Order environment, order usually can be negotiated in order to satisfycustomer need while it remains considering resources availability. Scheduling is utilized in a company to get higher efficiencies in production, minimize makespan and meet due date. There are some decisions related in scheduling activity i.e. sequencing, routing and determining starting time and finishing time of jobs. This paper will present application of Integer Linear Programming (ILP) and Critical Path Method (CPM) in scheduling. The methods are employed to determine due date that minimize slack time. This study resulted an optimal sequencing and routing of the jobs.

Copyrights © 2005






Journal Info

Abbrev

performa

Publisher

Subject

Engineering Industrial & Manufacturing Engineering

Description

PERFORMA : Media Ilmiah Teknik Industri merupakan jurnal teknik industri yang menyajikan artikel orisinil pada bidang teknik dan manajemen industri. Tema naskah yang diterbitkan mencakup: Manufacturing System, Operation Research, Product Design and Development, Manufacturing Technology, Work Study, ...