Analisis Waiting Time dalam Proses Perakitan MV Switchgear dengan Lean Production

R. Pitaloka Naganingrum (Program Studi Teknik Industri, Universitas Sebelas Maret)
Lobes Herdiman (Program Studi Teknik Industri, Universitas Sebelas Maret)



Article Info

Publish Date
01 Mar 2012

Abstract

PT. Siemens Indonesia is an industry engaged in the production of Energy Distribution, as Simoprime World Panel with world market-oriented. The problems that occurred there was delay time and completion of the scheduled production target. Delay in completion of the scheduled deadline because of the inefficiency caused by the flow process in the handling of waste resulting from the assembly. The purpose of this study was to identify waste and operating conditions that occurred on the main assembly. Lean Production was used in this research. In lean production concept, Value Stream Analysis Tool (VALSAT) was used as an instrument to map the waste that occurred and detailed Mapping Tool to determine the operating conditions. In identifying waste, the weighting of each work station waste in the main assembly. Based on the weighting of waste which made known that the biggest waste of waiting time and for the operating conditions, 21% non value adding activities from main assembly.

Copyrights © 2012






Journal Info

Abbrev

performa

Publisher

Subject

Engineering Industrial & Manufacturing Engineering

Description

PERFORMA : Media Ilmiah Teknik Industri merupakan jurnal teknik industri yang menyajikan artikel orisinil pada bidang teknik dan manajemen industri. Tema naskah yang diterbitkan mencakup: Manufacturing System, Operation Research, Product Design and Development, Manufacturing Technology, Work Study, ...