PERFORMANCE ANALYSIS OF THE SANTA LAZARUS MULTIPURPOSE BUILDING CONSTRUCTION PROJECT USING EARNED VALUE MANAGEMENT (EVM)

Nisa Febriyanti (Civil Engineering Study Program, Lambung Mangkurat University)
Eliatun Eliatun (Civil Engineering Study Program, Lambung Mangkurat University)



Article Info

Publish Date
05 Jun 2026

Abstract

Discrepancies in project implementation against the plan are generally caused by time and cost factors. This study aims to evaluate project performance analyzed using the Earned Value Management (EVM) method through the calculation of indicators such as BCWS, BCWP, ACWP, CV, SV, CPI, SPI, EAC, ETC, TCPI, and TE. Evaluation is carried out every month to identify cost and time deviations. The analysis results show that in the 7th month, the ACWP value is Rp 2,502,643,000.00 and the EAC is Rp 3,182,000,000.00 of the total funds allocated Rp 3,440,000,000.00. The project is estimated to be completed in 12 months or the project has accelerated the implementation time and efficiency in the use of the budget.  Keywords: Earned Value, Cost, Time

Copyrights © 2026






Journal Info

Abbrev

crc

Publisher

Subject

Civil Engineering, Building, Construction & Architecture

Description

Jurnal internasional bidang teknik sipil seperti : sumberdaya air, struktur bangunan, mekanika tanah, transportasi dan manajemen konstruksi. ...