Eliatun Eliatun
Civil Engineering Study Program, Lambung Mangkurat University

Published : 5 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 5 Documents
Search

ACCELERATION STUDY WITH CRASHING METHOD ON THE LONG SEGMENT HANDLING SUPERVISION PROJECT (ROUTINE MAINTENANCE, PERIODIC MAINTENANCE, IMPROVEMENT/RECONSTRUCTION) OF THE HANDIL JAWA – JAMBU BURUNG (DAK) ROAD Nur Sabrina Dwiyanti; Eliatun Eliatun
CERUCUK Vol 10, No 5 (2026): CERUCUK VOL. 10 NO. 5 MAY 2026
Publisher : Universitas Lambung Mangkurat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.20527/crc.v10i5.18930

Abstract

In a project, the most influential thing on the success or failure of the project is time and budget. In the Long Segment Handling Supervision Project (Routine Maintenance, Periodic Maintenance, Improvement/Reconstruction) of the Handil Jawa – Jambu Burung Road (DAK), Banjar Regency experienced a delay in project work. So that it was accelerated using Crashing.In this study, crashing with overtime (additional working hours) was used and calculated late fines on the project. By accelerating activities that are experiencing critical paths.The results of this study were obtained that the total cost was carried out crashing with the method of adding 4 working hours with a duration of 162 and still experiencing delays for 12 days with a total cost of Rp. 10,100,506,276.77. Meanwhile, the total acceleration was not carried out by experiencing a delay of 16 days of Rp.10,056,662,598.08. Therefore, the results obtained  are crashing with an additional 4 hours of efficient and optimal work in total costs. Keywords: Project delays, Crashing, increased working hours (overtime).
TIME AND COST OPTIMIZATION IN LIANG ANGGANG – MARTAPURA – BTS ROAD PRESERVATION PROJECT RANTAU CITY Naili Hidayanti; Eliatun Eliatun
CERUCUK Vol 10, No 1 (2026): CERUCUK VOL. 10 NO. 1 JANUARY 2026
Publisher : Universitas Lambung Mangkurat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.20527/crc.v10i1.18102

Abstract

Liang Anggang – Martapura – Bts. Kota Rantau Road Preservation Project , at the request of the PUPR Ministry as the owner, conveyed to the service provider contractor PT. Kelana Multi Konstruksi to accelerate the work process so that it can be used as a land facility connecting one area to another so that as construction management it is very necessary to optimize time and costs in its work. Work assessment can be done using the Earned Value Management (EVM) method. where to improve the performance, optimization is carried out with the Crashing Program .The method in this study to determine the performance of the project, the EVM method is used by calculating the BCWS, BCWP and ACWP indicators, then calculating the Performance Analysis (CV, SV, CPI, and SPI), calculating the Estimate To Complete (ETC) value, calculating the Estimate At Completion (EAC) value, and calculating the Time Estimated (TE). Then to prevent inefficiency in the project, time and cost optimization is carried out where the calculation begins by finding the critical path using Microsoft Project 2016 then the Crashing Program is carried out by adding 2 alternatives in the form of additional working hours and additional labor so that the most optimal cost addition value is obtained at the end of the project.The results of this research analysis obtained a project cost performance index of CPI 1.027> 1, which means that project performance shows that the cost expenditure is smaller than the budget, while the results of the SPI schedule performance index are 0.946 <1, which means that project performance shows that the implementation time is late from the planned schedule. The estimated cost to be incurred in the 22nd week (EAC) is IDR 10,301,128,358 if the project performance trend is the same as the performance in the 22nd week, then the estimated remaining work cost (ETC) is IDR 3,344,776,378. Judging from the project completion time, an estimated time of 35.93 weeks was obtained where the project completion was 1.93 weeks slower than the planned 34 weeks. Based on the results of research that has been conducted on the acceleration process of the Liang Anggang - Martapura - Bts. Kota Rantau Road Preservation project, it can be concluded that the crash program with the addition of 1 hour of work on thermoplastic road marking work has more optimal results. Because the total cost is smaller, namely Rp 9,080,322,187.08 with a duration of 241 days which has exceeded the normal duration. Keywords: Earned Value Management, Critical Path, Crashing Program
TIME AND COST ANALYSIS OF PILE FOUNDATION WORK USING HYDRAULIC STATIC PILE DRIVER (Case Study: Construction Project of the Official Residence of the Governor of South Kalimantan) Dhanu Wicaksono; Eliatun Eliatun
CERUCUK Vol 10, No 5 (2026): CERUCUK VOL. 10 NO. 5 MAY 2026
Publisher : Universitas Lambung Mangkurat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.20527/crc.v10i5.18929

Abstract

This study analyzes the productivity, time, and cost of foundation piling work using the Hydraulic Static Pile Driver (HSPD) on the Construction Project of the Official Residence of the Governor of South Kalimantan. Piling was carried out at 132 points with a total pile length of 1,584 meters. The results of the study show that the actual productivity reached 60.54 m/hour. The actual implementation time required only 4 working days or 28 hours, which is faster than the initial plan of 7 working days or 49 hours. This study did not include an analysis of the move-to-point time between pile locations. In terms of cost, the actual total cost amounted to IDR 187,246,000.00, which is lower than the estimated budget of IDR 201,608,500.00. These findings indicate that the actual implementation was more efficient in terms of both time and cost, and demonstrate the optimal performance of the HSPD in the field.Keywords: Equipment Productivity, Construction Cost, Project Duration
PERFORMANCE ANALYSIS OF THE SANTA LAZARUS MULTIPURPOSE BUILDING CONSTRUCTION PROJECT USING EARNED VALUE MANAGEMENT (EVM) Nisa Febriyanti; Eliatun Eliatun
CERUCUK Vol 10, No 6 (2026): CERUCUK VOL. 10 NO. 6 JUNE 2026
Publisher : Universitas Lambung Mangkurat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.20527/crc.v10i6.20795

Abstract

Discrepancies in project implementation against the plan are generally caused by time and cost factors. This study aims to evaluate project performance analyzed using the Earned Value Management (EVM) method through the calculation of indicators such as BCWS, BCWP, ACWP, CV, SV, CPI, SPI, EAC, ETC, TCPI, and TE. Evaluation is carried out every month to identify cost and time deviations. The analysis results show that in the 7th month, the ACWP value is Rp 2,502,643,000.00 and the EAC is Rp 3,182,000,000.00 of the total funds allocated Rp 3,440,000,000.00. The project is estimated to be completed in 12 months or the project has accelerated the implementation time and efficiency in the use of the budget.  Keywords: Earned Value, Cost, Time
SCHEDULING STUDY USING THE PDM METHOD IN THE PIANGGU-LALAP ROAD RECONSTRUCTION PROJECT (SUPPORTING THE FOOD ESTATE - DAK) IN AWANG DISTRICT, EAST BARITO REGENCY, CENTRAL KALIMANTAN Rika Sapitri; Eliatun Eliatun
CERUCUK Vol 10, No 7 (2026): CERUCUK VOL. 10 NO. 7 JULY 2026
Publisher : Universitas Lambung Mangkurat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.20527/crc.v10i7.20797

Abstract

The Pianggu-Lalap Road Reconstruction Project in Awang District, East Barito Regency, is a district road project by the PUPR Office. Initially, scheduling only used the S-curve without considering the relationship between activities, which caused delays. This research reconstructs the schedule using the Precedence Diagram Method (PDM) through the stages of WBS, duration determination, activity linkage analysis, and scheduling with Microsoft Project 2019. The results are displayed in Gantt Chart and Network Diagram, with a total duration of 142 days, from July 4 to November 19, 2024 Keywords: Scheduling, Precedence Diagram Method (PDM), Microsoft Project 2019