Feasibility Study for the Construction of a 2 Million TPYAlumina Refinery Plant in Mempawah Industrial Area, West Kalimantan

Wahyu Sugiantoro (Faculty of Industrial Engineering, STT Wastukancana Purwakarta)
Dedy Setyo Oetomo (Faculty of Industrial Engineering, STT Wastukancana Purwakarta)
Asep Hermawan (Faculty of Industrial Engineering, STT Wastukancana Purwakarta)



Article Info

Publish Date
01 Oct 2026

Abstract

Indonesia holds among the world's largest bauxite reserves, yet for decades most of this resource was exported as low value-added raw ore, generating limited economic benefit for the country. The government's mineral downstreaming policy, culminating in a nationwide ban on raw bauxite exports since June 2023, has created an urgent need for domestic alumina refining capacity, while the very large capital requirements and volatile raw-material prices involved make such investment decisions highly uncertain. This study assesses the investment feasibility of constructing an alumina refinery plant with a production capacity of 2 million tons per year in the Mempawah Industrial Area, West Kalimantan, Indonesia, driven by this policy context and by growing global demand for aluminum-based products. A quantitative approach was used, comprising demand forecasting with the Moving Average method (m = 3), estimation of capital expenditure (CAPEX) and operating expenditure (OPEX), and evaluation of financial feasibility through Net Present Value (NPV), Internal Rate of Return (IRR), and Payback Period (PP), followed by a scenario-based sensitivity analysis on bauxite and caustic soda (NaOH) prices. The demand forecast indicates a stable long-term national alumina consumption of approximately 5.17 million tons per year, supporting the plant's 2-million-ton-per-year capacity. Results show a required investment of approximately IDR 22.44 trillion, dominated by production machinery and equipment (44%). The financial evaluation yields a positive NPV of approximately IDR 3.49 trillion, an IRR of 12.93% (above the 10% Minimum Attractive Rate of Return), and a payback period of 7 years and 306 days, indicating that the project is financially feasible. Sensitivity analysis reveals that bauxite price is the most influential variable, followed by caustic soda price; the project remains feasible as long as IRR stays above the MARR and NPV remains positive. Compared with earlier alumina/SGA plant studies, which addressed either technical process design or financial feasibility in isolation, this study integrates both dimensions with a raw-material price-sensitivity analysis, offering a more complete decision-making basis for large-scale alumina refinery investment in Indonesia.

Copyrights © 2026






Journal Info

Abbrev

HEURISTIC

Publisher

Subject

Engineering Industrial & Manufacturing Engineering

Description

Jurnal HEURISTIC is published biannually, in April and October, by Industrial Engineering Department, University of 17 Agustus 1945 Surabaya. Jurnal HEURISTIC aims to: 1. Promote a comprehensive approach to industrial engineering incorporating viewpoints of different disciplines. 2. Strengthen ...