This Author published in this journals
All Journal Heuristic
Wahyu Sugiantoro
Faculty of Industrial Engineering, STT Wastukancana Purwakarta

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Feasibility Study for the Construction of a 2 Million TPYAlumina Refinery Plant in Mempawah Industrial Area, West Kalimantan Wahyu Sugiantoro; Dedy Setyo Oetomo; Asep Hermawan
Heuristic Vol 23, No 2 (2026) (in progress)
Publisher : Fakultas Teknik Universitas 17 Agustus 1945 Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30996/heuristic.v23i2.133822

Abstract

Indonesia holds among the world's largest bauxite reserves, yet for decades most of this resource was exported as low value-added raw ore, generating limited economic benefit for the country. The government's mineral downstreaming policy, culminating in a nationwide ban on raw bauxite exports since June 2023, has created an urgent need for domestic alumina refining capacity, while the very large capital requirements and volatile raw-material prices involved make such investment decisions highly uncertain. This study assesses the investment feasibility of constructing an alumina refinery plant with a production capacity of 2 million tons per year in the Mempawah Industrial Area, West Kalimantan, Indonesia, driven by this policy context and by growing global demand for aluminum-based products. A quantitative approach was used, comprising demand forecasting with the Moving Average method (m = 3), estimation of capital expenditure (CAPEX) and operating expenditure (OPEX), and evaluation of financial feasibility through Net Present Value (NPV), Internal Rate of Return (IRR), and Payback Period (PP), followed by a scenario-based sensitivity analysis on bauxite and caustic soda (NaOH) prices. The demand forecast indicates a stable long-term national alumina consumption of approximately 5.17 million tons per year, supporting the plant's 2-million-ton-per-year capacity. Results show a required investment of approximately IDR 22.44 trillion, dominated by production machinery and equipment (44%). The financial evaluation yields a positive NPV of approximately IDR 3.49 trillion, an IRR of 12.93% (above the 10% Minimum Attractive Rate of Return), and a payback period of 7 years and 306 days, indicating that the project is financially feasible. Sensitivity analysis reveals that bauxite price is the most influential variable, followed by caustic soda price; the project remains feasible as long as IRR stays above the MARR and NPV remains positive. Compared with earlier alumina/SGA plant studies, which addressed either technical process design or financial feasibility in isolation, this study integrates both dimensions with a raw-material price-sensitivity analysis, offering a more complete decision-making basis for large-scale alumina refinery investment in Indonesia.