Water is one of the most basic basic needs for human life. The provision of clean water does not only meet household needs, it is also closely related to the need for water for public, social and economic facilities in accordance with the increase in population. In line with these developments, the need for facilities and infrastructure is also increasing, including the need for healthy and proper clean water. With the rate of population growth, it is estimated that the population in Jorong Sitingkai in the next 10 years will be as many as 800 people. The distribution pipes in Jorong Sitingkai use HDPE pipes with diameters of 3 inches, 2 inches, 1.5 inches and 1 inch. The length of the pipeline network in Jorong Sitingkai is 3,782 km. The projected amount of clean water demand is 1.91 l/s and the water discharge from the source is 3 l/s. For the government and the community, it is hoped that they can create and optimize programs regarding the provision of clean water and the cooperation and participation of the community is needed in implementing the program, for the government and the community it is hoped that if the clean water supply system is running it is expected to form a drinking water infrastructure management group ( KPSPAM). Keywords: Network, pipe, epanet 2.2, drinking water
Copyrights © 2026