The construction of dock infrastructure is a construction activity with a high level of complexity, especially in integrating structural planning, implementation timing, and project cost control. with the existence of Building Information Modeling (BIM) can help complete the work more optimally and accurately. This study discusses the application of 5D Building Information Modeling (BIM) as an integrated approach in cost analysis and scheduling in the construction project of the 10,000 DWT Batang Multipurpose Jetty. Modeling was carried out using Autodesk Revit software by referring to DED images in the construction project of multipurpose wharf trunks, cost estimates were compiled based on the results of quantity take-off from the BIM model combined with Unit Price Analysis (AHS) using Microsoft Excel software. Scheduling visualization is done by integrating the dock structure model from Autodesk Revit with the scheduling data input from Microsoft Project which is then visualized using Autodesk Navisworks software. The results of the study show that the application of 5D Building Information Modeling (BIM) is able to present cost estimates and scheduling in a more systematic, transparent, and easy-to-understand manner. The integrated BIM model makes it easy to control volume, evaluate costs, and visualize the stages of work implementation. Thus, BIM 5D has proven to be effective as a dock project planning tool that supports more accurate and informative decision-making.
Copyrights © 2026