Analisis Perhitungan Biaya dan Waktu Pemindahan Tanah Mekanis pada Proyek X

Salma Nabilah (Institut Teknologi Nasional Bandung)
Katarina Rini Ratnayanti (Institut Teknologi Nasional Bandung)
Ratih Dewi Shima (Institut Teknologi Nasional Bandung)



Article Info

Publish Date
07 Oct 2026

Abstract

This study addresses the low productivity of mechanical earthmoving operations caused by improper selection and coordination of heavy equipment (excavators, bulldozers, and dump trucks) which can result in excessive idle time, reduced productivity, and increased operating costs. The objective of this study is to evaluate equipment productivity, operating costs, and cycle time in mechanical earthmoving activities using the Method Productivity Delay Model (MPDM). Topographic data and cut-and-fill volumes were processed using Civil 3D. The equipment analyzed consisted of a Zoomlion ZE215E excavator, a Komatsu D65EX-17 bulldozer, and a Hino Ranger FG235 JJ dump truck. The results show productivity rates of 70.473 m³/h for the excavator, 28.248 m³/h for the bulldozer, and 6.724 m³/h for the dump truck, with a total operating cost of IDR 625,546,369.42. MPDM analysis identified the dump truck as the governing equipment, with a cycle time of 62.80 minutes. These findings indicate that proper equipment coordination can improve productivity, operational efficiency, and cost performance in mechanical earthmoving works.

Copyrights © 2026






Journal Info

Abbrev

jutin

Publisher

Subject

Decision Sciences, Operations Research & Management Energy Engineering Industrial & Manufacturing Engineering Mechanical Engineering

Description

Jurnal Teknik Industri Terintegrasi merupakan jurnal yang dikelola oleh Program Studi Teknik Industri Fakultas Sains dan Teknologi Universitas Pahlawan Tuanku Tambusai yang menjebatani para peneliti untuk mempublikasikan hasil penelitian di bidang ilmu teknik dan teknik industri mencakup proses ...