Efektivitas Pengelolaan Limbah Konstruksi Berbasis Konsep 3R (Reduce, Reuse, Recycle) pada Pekerjaan Superstruktur Sera Marselina; Katarina Rini Ratnayanti
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 9 No. 3 (2026): July
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v9i3.61811

Abstract

The rapid growth of Indonesia's construction industry has increased construction waste generation, particularly in superstructure work such as columns, beams, floor slabs, formwork, reinforcement, and concrete casting. The 3R concept (Reduce, Reuse, Recycle) is recommended by various regulations, yet its field effectiveness requires further study. This study aims to determine the effectiveness of 3R-based construction waste management, identify waste types with management potential, and assess project actors' roles and perceptions. The study was conducted at the Pasar Baru Ciparay Development Project using a descriptive quantitative approach with a 5-point Likert-scale questionnaire administered to 70 respondents, tested for validity (Pearson product moment) and reliability (Cronbach's Alpha). Results show reduce effectiveness of 82%, reuse 87%, recycle 87%, and overall 3R effectiveness of 88%, averaging 86% (very effective category). The largest waste originated from formwork timber (30%) and reinforcement steel offcuts (29%).
Penerapan Metode Lean Construction untuk Optimasi Waste Material Baja Tulangan pada Proyek Pembangunan Gereja XYZ di Bandung Ika Oktavia Widiyaningrum; Katarina Rini Ratnayanti; Ratih Dewi Shima
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 9 No. 4 (2026): October
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v9i4.62417

Abstract

The construction industry often experiences material waste that reduces project efficiency. This study applies the Lean Construction method to analyze and optimize the use of reinforcing steel material in the XYZ Church Construction Project, Bandung, using a descriptive qualitative-quantitative approach with primary data (field observation) and secondary data (shop drawings and logistics data). Material waste and efficiency were analyzed before and after applying Cutting Optimization. The results show that average reinforcing steel waste decreased from 58.397% to 6.464%, while material efficiency increased from 41.603% to 93.536%. For wiremesh, waste was reduced from 12.759% to 0%, reaching 100% efficiency. These findings prove that Lean Construction through Cutting Optimization effectively improves material efficiency and supports sustainable construction. 
Analisis Perhitungan Biaya dan Waktu Pemindahan Tanah Mekanis pada Proyek X Salma Nabilah; Katarina Rini Ratnayanti; Ratih Dewi Shima
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 9 No. 4 (2026): October
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v9i4.63088

Abstract

This study addresses the low productivity of mechanical earthmoving operations caused by improper selection and coordination of heavy equipment (excavators, bulldozers, and dump trucks) which can result in excessive idle time, reduced productivity, and increased operating costs. The objective of this study is to evaluate equipment productivity, operating costs, and cycle time in mechanical earthmoving activities using the Method Productivity Delay Model (MPDM). Topographic data and cut-and-fill volumes were processed using Civil 3D. The equipment analyzed consisted of a Zoomlion ZE215E excavator, a Komatsu D65EX-17 bulldozer, and a Hino Ranger FG235 JJ dump truck. The results show productivity rates of 70.473 m³/h for the excavator, 28.248 m³/h for the bulldozer, and 6.724 m³/h for the dump truck, with a total operating cost of IDR 625,546,369.42. MPDM analysis identified the dump truck as the governing equipment, with a cycle time of 62.80 minutes. These findings indicate that proper equipment coordination can improve productivity, operational efficiency, and cost performance in mechanical earthmoving works.