Material waste is a significant issue in the construction industry as it contributes to increased project costs, reduced productivity, and negative environmental impacts. Low material efficiency is commonly caused by inaccurate planning, design changes during construction, and weak site supervision. This study aims to analyze the effects of planning and supervision on material efficiency in construction projects. A quantitative approach was employed, with data collected through questionnaires distributed to construction professionals, including project managers, site supervisors, field engineers, and logistics staff. The data were analyzed using multiple linear regression after fulfilling classical assumption tests, namely normality, multicollinearity, and heteroscedasticity tests. The results indicate a coefficient of determination (R²) of 0.747, meaning that planning and supervision account for 74.7% of the variation in material efficiency. Both variables have a significant effect on material efficiency, either simultaneously or partially. Therefore, improving material planning quality and strengthening site supervision are recommended to enhance material efficiency and support sustainable construction practices.
Copyrights © 2026