Material management is often evaluated mainly through price, although other material attributes also shape project cost and schedule outcomes. This study develops Material Characteristics as a higher-order construct that integrates six dimensions (price, quality, availability, ease of installation, durability, and flexibility) and tests its effect simultaneously on cost performance and time performance in Sekolah Rakyat structural construction projects in North Sumatra, Indonesia. A survey of 224 respondents directly involved in the projects was analyzed using PLS-SEM (SmartPLS 4; 5,000 bootstrap subsamples). The model met the validity and reliability criteria. Material Characteristics had a positive and significant effect on Cost Performance (β = 0.781; R² = 0.611; p < 0.001) and Time Performance (β = 0.671; R² = 0.450; p < 0.001). The lower explanatory power for Time Performance indicates that factors beyond materials also play a role. The findings suggest that procurement should not rely on price alone and that material management should be integrated from planning and quality control through logistics and field utilization
Copyrights © 2026