This study aims to evaluate the implementation of the purchasing cycle and the purchase return cycle for raw materials at PT X, a corrugated box packaging manufacturer located in Bandung Regency, based on Mulyadi's accounting cycle theory and the 2013 COSO framework. The problems identified include incomplete Purchase Order documentation, overlapping functions between receiving and warehousing, the absence of debit memos in the return process, and the lack of direct accounting function involvement at the company's operational site. This study employs a descriptive qualitative approach, with data collected through interviews, observation, and documentation and analyzed thematically. The condition of internal control was mapped using the COSO 2013 framework through an Internal Control Questionnaire instrument. The findings indicate that the purchasing cycle does not comply with Mulyadi's (2016) standards in six aspects, while the purchase return cycle deviates in three key aspects. These deviations are reflected in weaknesses across all five components of the COSO internal control framework.
Copyrights © 2026