Urban national roads carry heavy traffic, which accelerates pavement deterioration and increases road user costs. This study analyzes the economic feasibility of maintaining three national road segments in Depok City, namely Jalan Ir. H. Juanda, Jalan Gandaria–Cilodong/Depok Border, and Jalan Margonda Raya, using savings in Vehicle Operating Costs (VOC) and vehicle greenhouse gas (GHG) emission costs as benefit variables. A with–without project approach (base case and project case) was applied over a five-year design period. Traffic volume, International Roughness Index (IRI), and vehicle speed were projected for each scenario; VOC was calculated using the Ministry of Public Works guideline, and GHG emissions were estimated using the IPCC 2006 method. Economic feasibility was assessed using Net Present Value (NPV), Benefit Cost Ratio (BCR), and Internal Rate of Return (IRR) at a 6.83% discount rate, complemented by a nine-scenario sensitivity analysis. The results show an NPV of IDR 37,601,607,538.88, a BCR of 2.05, and an IRR of 75.33%, far exceeding the prevailing interest rate. Maintenance becomes infeasible only when benefits decrease by 40% and maintenance costs increase by 40% simultaneously. Therefore, maintaining the three road segments is economically feasible and delivers tangible benefits to the community through reduced VOC and vehicle emissions.
Copyrights © 2026