Columns are the main vertical structural elements that transfer building loads to the foundation,sotheir constructiondemandscareful executionandstrict quality control. Thisarticle describesthe constructionmethodof reinforcedconcrete columntype C34 (K16B), measuring 600 × 1100 mm, on the basement floor of the NavaPark Business Suites Building Project, including quality control and field problems. Data were collected through literature study, field observation and discussion, documentation, and secondary data such as shop drawings, the time schedule, and project specifications during an internship from 27 April to 27 July 2026, and were analyzed descriptively. The work was carried out in six stages: preparation and axis marking, reinforcement, PERI system formwork, concrete casting, formwork removal, and curing, with inspections at every stage. The slump of 14 cm met the required range of 13–17 cm, and the compressive strength of 33.95 MPa reached 113.17% of the specified strength fc' 30 MPa. Three field problems, namely a hollow pit lift column, incomplete personal protective equipment, and standing water, were resolved. Screening concrete for densely reinforced elements should be specified from the planning stage.
Copyrights © 2026