Municipal business incubators and co-working facilities face critical financial sustainability when transitioning from government-subsidized operations to autonomous Public Service Agencies. The absence of long-term operational and maintenance planning often leads to asset deterioration and severe budgetary deficits. This study develops a comprehensive Life Cycle Costing (LCC) optimization and sensitivity evaluation framework over a 50-year economic lifespan for the Baros Information Technology Creative Building in Indonesia based on ISO 15686-5 standards, incorporating discounted cash flow modeling, multi-component cost structure evaluation, and scenario-based decision modeling across seven alternatives. Baseline evaluations reveal a total cumulative LCC of IDR 185,163,737,807.00, yielding a baseline Net Present Value of IDR 182,775,821,206.00, an Internal Rate of Return of 7.85%, a Revenue-to-Cost Ratio of 2.03, and a Return on Investment of 103%, confirming initial project feasibility under government subsidies. However, complete subsidy withdrawal creates immediate insolvency under baseline fee structures. Among the seven evaluated scenarios, Alternative V that combine the energy efficiency cost with moderate rental fee adjustment, emerges as the optimal self-sustaining operational model. The research provides a generalized decision-support framework for public asset managers, demonstrating that public facility self-sustainability requires a balanced synergy between clean energy transition, space utilization efficiency, and value-based tariff restructuring.
Copyrights © 2026