Specialized healthcare infrastructure, such as Nuclear Medicine Buildings, demands highly accurate project budget planning due to structural complexities and technical standards. Discrepancies between the initial Owner’s Estimate (RAB) and real-market contractor implementation budgets (RAP) often lead to financial inefficiencies if not evaluated systematically. This study aims to analyze cost efficiency by directly comparing the Owner's Estimated Budget Plan (RAB) with the Implementation Budget Plan (RAP) derived from real-market price surveys, unit price analysis (AHSP), and resource productivity logic. Applied to the Nuclear Medicine Building Project at RSUD Dr. Soedarso in Pontianak, the research evaluates unit costs, work weight distributions, and overall monetary savings. The evaluation reveals that the total RAP amounts to IDR 8,756,988,074.05 compared to the initial RAB of IDR 12,215,041,500.12. This yields a significant cost variance efficiency saving of IDR 3,458,053,426.07 (a 28.31% savings rate). Structural works constituted the highest cost weight at 23.31% of the total project budget. The findings demonstrate that integrating real-market data into unit price analysis eliminates budgetary buffers, providing project managers with a rigorous cost control framework for complex medical facility developments.
Copyrights © 2026