This research discusses the planning of reinforcement for Building X in Central Java. Construction materials are fundamental elements used in construction, from the main structure to finishing details. Steel is one of the main materials in construction projects, but it is susceptible to rust if not stored properly. The construction supply chain involves the coordination of all parts from suppliers, contractors, and service users. The construction supply chain consists of 5 main sources: labor, equipment, methods, and funding. Cost control is a part of construction cost management that must be carried out continuously. Cost control can provide an overview of work progress, the relationship between costs and work schedules, identification of potential problems, and valid milestones according to the work plan. The large volume of steel procurement during the 12-month construction period at Building X is 540,272.49 kg with a total cost of Rp 7,004,092,612.22. The process of procuring materials to the construction area requires stages to assist in control; these stages create a cycle of construction material procurement. The cycle or stage will run smoothly and correctly if carried out collectively by all parties involved.
Copyrights © 2025