The power transformers are considered key and crucial components in electrical systems, serving as power transmission and distribution units for industrial production facilities such as mechanical workshops, pharmaceutical factories, and granite factories. In the context of market globalization, power transformer manufacturers are facing increasingly fierce competition, requiring the application of design strategies to achieve higher efficiency and productivity at lower costs, while ensuring safe and reliable operation during power supply. This paper proposes a design method for large power transformers using multi-objective optimization, combined with time-variant multi-objective particle swarm optimization (TV-MOPSO), to improve power quality and power supply. This method, built with a design-oriented approach and calculated based on target performance, can quickly deduce the design parameters of the transformer. Verification of the proposed method, with results showing significant qualitative and quantitative agreement between the design research results and the measured performance values, based on design calculations and simulations using ANSYS Maxwell software, has shown that the voltage, current, and link flux values of the transformer consistently meet the technical requirements of power transformers in current practice.
Copyrights © 2026