General Background: Manufacturing industries frequently encounter production delays that create schedule uncertainty, elevated operational costs, and reduced organizational performance. Specific Background: Manufacturing facilities producing children's playground equipment experience recurring disruptions driven by raw material availability issues and supply chain instability. Knowledge Gap: Traditional manufacturing operations often lack structured root-cause diagnostic tools to isolate supply-chain bottlenecks from internal machine or labor failures. Aims: This study examines the factors causing production delays in a children’s play-ride manufacturing industry using the Fault Tree Analysis method. Results: The findings demonstrate that delays are triggered by raw material delivery mismatches, limited buffer stock, and supplier distribution constraints, resulting in production halts across molding, painting, and assembly stages. Novelty: This research establishes a structured Fault Tree Analysis framework applied specifically to children's play-ride manufacturing to map basic events such as uncoordinated scheduling and supplier distribution failures. Implications: Implementing optimized safety stock levels and integrated material scheduling systems enables industrial managers to mitigate delay risks and improve production planning. Key Findings Highlights Production delays in children's play-ride manufacturing are primarily triggered by raw material delivery mismatches, supplier distribution constraints, and limited buffer stock availability. Fault Tree Analysis identifies basic events such as uncoordinated material scheduling among workers and supplier instability that cause operational halts during molding, painting, and assembly. Recommended improvements include optimizing safety stock levels, establishing an integrated material scheduling system, and evaluating supplier performance. Keywords Production Delay, Raw Materials, Fault Tree Analysis, Inventory Management, Supply Chain
Copyrights © 2026