Claim Missing Document
Check
Articles

Found 2 Documents
Search

Analysis of Production Delays in Children's Game Rides Using the Fault Tree Analysis (FTA) Method: Analisis Keterlambatan Produksi Wahana Permainan Anak Menggunakan Metode Fault Tree Analysis (FTA) Mochamad Fariz Prayoga; Boy Isma Putra
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/r5z41g64

Abstract

General Background: Manufacturing industries frequently encounter production delays that create schedule uncertainty, elevated operational costs, and reduced organizational performance. Specific Background: Manufacturing facilities producing children's playground equipment experience recurring disruptions driven by raw material availability issues and supply chain instability. Knowledge Gap: Traditional manufacturing operations often lack structured root-cause diagnostic tools to isolate supply-chain bottlenecks from internal machine or labor failures. Aims: This study examines the factors causing production delays in a children’s play-ride manufacturing industry using the Fault Tree Analysis method. Results: The findings demonstrate that delays are triggered by raw material delivery mismatches, limited buffer stock, and supplier distribution constraints, resulting in production halts across molding, painting, and assembly stages. Novelty: This research establishes a structured Fault Tree Analysis framework applied specifically to children's play-ride manufacturing to map basic events such as uncoordinated scheduling and supplier distribution failures. Implications: Implementing optimized safety stock levels and integrated material scheduling systems enables industrial managers to mitigate delay risks and improve production planning. Key Findings Highlights Production delays in children's play-ride manufacturing are primarily triggered by raw material delivery mismatches, supplier distribution constraints, and limited buffer stock availability. Fault Tree Analysis identifies basic events such as uncoordinated material scheduling among workers and supplier instability that cause operational halts during molding, painting, and assembly. Recommended improvements include optimizing safety stock levels, establishing an integrated material scheduling system, and evaluating supplier performance. Keywords Production Delay, Raw Materials, Fault Tree Analysis, Inventory Management, Supply Chain  
Mickey Mouse Modular Chair Factory Layout Design: Perancangan Tata Letak Pabrik Kursi Modular Mickey Mouse Radan Ghaly All Fawwas; Erlangga Nur S; Zarir Adiyatma Surya Muhammad; Mochamad Fariz Prayoga; Atikha Sidhi Cahyana
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/fwex4111

Abstract

General Background: Companies must create effective manufacturing processes, particularly in the layout of production plants, in order to grow the furniture business. Specific Background: Inappropriate facility design can lead to needless travel distances, ineffective material flow, and higher material handling expenditures during the production of Mickey Mouse modular chairs. Knowledge Gap: Sequential and interdependent manufacturing processes require frequent material movement among departments, necessitating structured layout planning. Aims: This work aims to create a process-oriented production facility design that is effective, safe, and reduces material handling expenditures as well as distances. Results: The original arrangement results in a total material handling volume of 1,530 units with a total material handling cost of Rp4,027,782, whereas the suggested Blocplan layout successfully decreases material handling distance, cuts expenses, and reduces time. Novelty: This study integrates MPPC, ARC, ARD, From-To Chart, and Blocplan methodology to optimize modular furniture facility arrangements. Implications: The proposed facility layout improves overall operational efficiency, safety, and production flow continuity. Key Findings Highlights The initial plant layout generates a material handling volume of 1,530 units with total costs reaching Rp4,027,782. The Blocplan methodology generates and evaluates alternative facility arrangements to optimize spatial distribution. The proposed layout configuration successfully minimizes material transfer distance, reduces handling expenses, and streamlines production processes. Keywords Facility layout design, Modular chair, Material handling, From-To Chart, Blocplan