This study evaluates ensemble machine learning for conditional estimation of monthly electricity generation at the Sutami Hydropower Plant, Indonesia. The dataset comprises 120 monthly observations from 2003 to 2012. Reservoir inflow, turbine discharge, hydraulic head, and cumulative turbine operating hours are used as contemporaneous inputs, with monthly plant electricity generation as the target. Random Forest, Gradient Boosting, and Extra Trees are compared using a chronological split of 84 training and 36 testing observations. Extra Trees achieved the strongest reported performance, with R² = 0.960, RMSE = 3.00 × 10⁶ kWh, and MAE = 2.46 × 10⁶ kWh. Turbine discharge and operating hours had the largest predictive contributions, followed by reservoir inflow, while hydraulic head contributed less within the observed dataset. The results support monthly energy estimation under the conditions represented by the historical records. They do not establish advance forecasting capability or causal relationships. Monthly resolution, omitted operational variables, and the single-plant setting limit interpretation and transferability.
Copyrights © 2026