Household relocation delivery requires coordination among fleet readiness, loading and unloading personnel, and accesibility of customer premises. This study examines associations between these operational dimensions and perceived delivery timeliness at PT. Pilar Utama Transport. A quantitative survey was conducted during September-December 2025; of 105 returned questionairres, 101 complete responses were retained for regression analysis. The reported log-transformed regression model was statistically significant, F (3,97) = 38.024, p < .001, with R2 = .540 and Adjusted R2 = .526. loading and unloading personel (B=1.349, p < .0010 and location accessibility (B=1.082, p = .003) were statistically significant, whereas fleet readiness (B= .056, p = .897) was not. Company records separately identified location accesibility as the most frequently reported obstacle (40%), followed by fleet delays (35%) and personnel issues (25%); the underlying event counts were not available. The study highlights the practical value of pre-delivery access assessments and workforce coordination. Interpretation is limited by self-reported indicators, mixed respondent groups, and the need to reconcile one descriptive frequency with the final dataset.
Copyrights © 2026