PT United Tractors, Muara Tiga Besar site, faces challenges in spare parts inventory management. Days of Inventory (DOI) performance increased to 81.9 days in May 2024, far exceeding the corporate target of 70 days. This condition leads to higher storage costs and inefficiencies. This research aims to improve DOI performance using the DMAIC framework, with root cause analysis via 5 Why Analysis and improvements implemented through Simple Moving Average (SMA) forecasting and inventory control using the Periodic Review System and Continuous Review System. The results show that SMA forecasting successfully reduced DOI to 72 days, while the Continuous Review System decreased storage costs by 49%. These findings demonstrate that integrating forecasting with systematic inventory control can create cost efficiency while maintaining customer service levels.
Copyrights © 2026