Tibuana : Journal of Applied Industrial Engineering
Vol 1 No 1 (2018): Tibuana

RE-LAYOUT PRODUCTION FACILITY BREAD USING FTC AND ARC METHOD IN PT. XYZ: RE-LAYOUT PRODUCTION FACILITY BREAD USING FTC AND ARC METHOD IN PT. XYZ

Prihono Prihono (Universitas PGRI Adi Buana Surabaya)



Article Info

Publish Date
01 Aug 2018

Abstract

Layout arrangements are vital for improving quality, productivity and corporate image. A production requiring multiple machines and a production process flow that is too long necessitates the preparation of a detailed layout in order that there is no transfer flow movement in the production process. This study aims to make the production process has a total minimum displacement moment and increase employee performance. From the analysis conducted at PT. XYZ that produce bread shows the existence of long distance, motion behind and congestion during material handling. The result of analysis by using method from to chart shows that the distance of material transfer distance is 73, 70 meter, total frequency of material transfer 35 times and mileage with total 1,901 meter. The result of analysis using activity relationship chart where spray & seeding (J) and split machine (K) departments were moved close to proofing room 1 (H1) and proofing room 2 (H2) facility, rack & pan 1 (I1) facility was moved near With rack, tray & pan cleanning (G) area facilities and the sieving flour (B) and formula room (D) departments being moved close to the process area 2 (C2) facility.

Copyrights © 2018