PROJECT SCHEDULING ANALYSIS USING PRECEDENCE DIAGRAM METHOD (PDM)

Andani Devi Novitasari (Shipbuilding Institute Polytechnic of Surabaya)
Rina Sandora (Shipbuilding Institute Polytechnic of Surabaya)
Rahandini Lukita Lestari (Shipbuilding Institute Polytechnic of Surabaya)



Article Info

Publish Date
15 Oct 2018

Abstract

Many obstacles that affect the completion of the project late, like: weather, late general plan approval, late material arrival, less skills and others. The Precedence Diagram Method is the method used to create network planning especially project scheduling. This research will examine how to plan the proper project scheduling of Pressure Vessel project of PT Wika Technip which is done by PT. Barata Indonesia by using PDM.The results obtained from the cost calculation at 252 days of project life have total project cost of Rp.6.131.093.885,00 and at project age 243 days total project cost is Rp.6.236.994.056,00. In this case it is known that there is an increase in total cost of Rp.105.900.171,00 and the time difference of 9 days when the acceleration is done on the project duration from 252 days to 243 days.

Copyrights © 2018






Journal Info

Abbrev

jemis

Publisher

Subject

Industrial & Manufacturing Engineering

Description

Journal of Engineering and Management in Industrial System is a peer reviewed journal. The journal publishes original papers at the forefront of industrial and system engineering research, covering theoretical modeling, inventory, logistics, optimizations methods, artificial intelligence, bioscience ...