JURNAL MANAJEMEN INDUSTRI DAN LOGISTIK
Vol 1, No 2 (2017): page 75 - 208

ANALISIS PERENCANAAN PERSEDIAAN BATUBARA FX DENGAN METODE MATERIAL REQUIREMENT PLANNING

Muhammad Arief (Program Studi Teknik Industri, Universitas Serang Raya, Jalan Raya Serang, Cilegon KM. 5 Taman Drangong Kota Serang, Banten 42116, Indonesia)
Supriyadi Supriyadi (Unknown)



Article Info

Publish Date
02 Dec 2018

Abstract

A company often has difficulty in controlling raw materials,it could be surplus or minus. Preventing these problem,we made a problem solving. Material needs planning is made for efficient and effective materials application  in the execution of work, so the problems because of material is avoided.this  research purpose is planning  and controlling raw material and supplier selection by Material Requirement Planning (MRP) method. Material Requirement Planning is a method for determining materials or components which  make or buy, how much it is needed and when it is needed. The result using the calculation by MRP method show Fix Period Requirement (FPR) is the best method, because the calculation of Fix Period Requirement method got the lowest total cost that is  Rp.18,722,190,090, -.FPR is obtained a profit about Rp. 6.096.088.915,00 or about 25% more efficient than the method applied company.

Copyrights © 2017






Journal Info

Abbrev

JMIL

Publisher

Subject

Decision Sciences, Operations Research & Management Engineering Industrial & Manufacturing Engineering Transportation

Description

Jurnal Manajemen Industri dan Logistik (Industrial and Logistic Management Journal) JMIL, invites academician/researchers/contributors to submit research papers, technical papers, conceptual papers, and case study reports in the scope of Logistics Management, Industrial Marketing, and International ...