The development of transportation is now very rapid, especially the existing transportation on land. The development of transportation in Palembang City is also accompanied by problems that are no less complex than the progress. The problems that occur especially in the existing transportation network, the intersection of which is the meeting of two or more roads into a critical point of the occurrence of traffic congestion. Looking at the growth rate of traffic is increasing from year to year in the city of Palembang, so for the future there will be problems of intersection capacity that can no longer accommodate the flow of traffic. Based on the calculation of MKJI 1997 analysis, with the development of Fly Over Sp.Bandara-Tanjung Api-Api and the influence of construction of LRT (Light Rail Transit) of South Sumatra can reduce the level of delays at Simpang Bandara - Tanjung Api-Api, where before the development of value Level of service (LOS) E of 57 dtk / smp after construction of Fly over Sp.Bandara-Tanjung api-api (predicted 2018) increased to a service level / service level (LOS) C value of 18.03 sec / smp and predicted 5 years after development (Prediction year 2023) into value of service level or level of service (LOS) C equal to 18,58 dtk / smp.
Copyrights © 2017