OverBased on RCM analysis for each critical subsystem obtained interval preventive maintenance for transfer roller 127.60 hours, Ink fountain roller 24.45 hours, ink form roller 29.23 hours respectively, and the wash-up device is no scheduled maintenance. For spare parts inventory strategies the result using RCS method are: transfer roller104 units, ink fountain roller requires 32 units, ink form roller 36 units and are holding spare policy required, and a wash-up device no holding spare parts.
Inserted: r
Inserted: u
Inserted: ng
Inserted: foll
Inserted: polic
Inserted: d
Inserted: the
Deleted:in acc
Deleted:rdance
Deleted:th
Deleted:i
Deleted: accor
Deleted:anc
Deleted: with
Deleted:strateg
Copyrights © 2018