Civil Engineering Journal
Vol 5, No 4 (2019): April

Experimental Study of the Rooster Tail Jump and End Sill in Horseshoe Spillways

Vahid Hassanzadeh Vayghan (PhD Candidate, Water and Hydraulic Structures, Department of Civil Eng., Faculty of Eng., Urmia University, Urmia,)
Mirali Mohammadi (Associate Prof., Department of Civil Eng., Faculty of Eng., Urmia University, P O Box 165, Urmia 57169-33111,)
Ali Ranjbar (PhD Candidate, Water Resource Management, Department of Civil Eng., K. N. Toosi University of Technology, Tehran,)



Article Info

Publish Date
28 Apr 2019

Abstract

In a horseshoe spillways, due to the collision of the falling nappes from their surround walls, in the center of spillway’s trough, a spatial hydraulic jump is formed that named “rooster tail”. This study by using the physical model of horseshoe spillway, investigates the form, height and length of rooster tail jump. Based on the analytical methods, the effective parameters on rooster tail jump’s height and height were determined and their interaction was investigated and linear relationships were proposed to predict jump’s length and height. By increasing the amount of water on the spillway’s crest and thereby increasing the velocity of flow nappe at the point of contact with the spillway’s bed, length and high of rooster tail jump, linearly increased. The result also shows that by increasing number of Froude, the length and height of jump increases and by increasing the spillway’s length, the height and length of the rooster tail jump decreases. To control of rooster tail jump in spillway’s model, two different size of end sills Inserted at downstream of spillway  and result shows that by employing a sill with height of 3.8 cm and 7.6 cm, the flow depth, in average, respectively 122% and 272% increase compared to no sill conditions, also flow state change from super-critical to sub-critical. At the sill of 3.8 cm it was observed that the rooster tail jump did not submerged, but at the height of 7.6 cm the jump submerged and static pressure increased more. The results revealed that by placing the sill of 3.8 and 7.6 cm, respectively 45% and 35% of the maximum pressure entering the bed of the spillway at the collision site is reduced.

Copyrights © 2019






Journal Info

Abbrev

cej

Publisher

Subject

Civil Engineering, Building, Construction & Architecture

Description

Civil Engineering Journal is a multidisciplinary, an open-access, internationally double-blind peer -reviewed journal concerned with all aspects of civil engineering, which include but are not necessarily restricted to: Building Materials and Structures, Coastal and Harbor Engineering, ...