cover
Contact Name
Hamzah
Contact Email
sainetin@unilak.ac.id
Phone
+6285274546000
Journal Mail Official
sainetin@unilak.ac.id
Editorial Address
Jl. Yos Sudarso km.8, Umban Sari, Rumbai, Kota Pekanbaru, Riau 28265
Location
Kota pekanbaru,
Riau
INDONESIA
SainETIn
ISSN : 25489445     EISSN : 25486888     DOI : 10.31849/sainetin.v4i1
Jurnal SainETIn is a scientific journal published by the Electrical Engineering Department, Faculty of Engineering, Universitas Lancang Kuning Pekanbaru, as a medium for the publication of scientific papers / research in the fields of Science, Energy, Technology and Industry
Articles 6 Documents
Search results for , issue "Vol. 6 No. 1 (2021): SainETIn" : 6 Documents clear
Analisa Aliran Daya pada Sistem Tenaga Listrik menggunakan ETAP 12.6 Al-afifi, Umar Faruq
SainETIn : Jurnal Sains, Energi, Teknologi, dan Industri Vol. 6 No. 1 (2021): SainETIn
Publisher : Teknik Elektro Universitas Lancang Kuning

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31849/sainetin.v6i1.7031

Abstract

Analysis of load flow in the Electric Power System is needed with the aim of improving and optimizing the system. This analysis can be carried out in various stages, either manually or with computer applications. Etap is one application that can be a tool for the analysis. Modeling the electric power system with ETAP Power Station 12.6 begins with analyzing the state of the system and then proceeds with Analysis and Actions to improve the state of the system. The advantage of simulation with ETAP Power Station 12.6 is that it can use 100% load. This research was conducted by utilizing ETAP Power Station 12.6 as a simulation medium with an electric power system that has 20 buses. In this study using a power source in the form of a power grid or substation with a total capacity of 100 MVA. The data used for the analysis is using One Line Diagram, Channel Data and Load Data. Based on these data, a research was conducted using ETAP Power Station 12.6 for the study of power flow.
Studi Konsumsi Energi Terhadap Perubahan Kecepatan dan Beban Pada Motor Induksi Tiga Phasa Yulizar, Ade; Zondra, Elvira; Monice, Monice
SainETIn : Jurnal Sains, Energi, Teknologi, dan Industri Vol. 6 No. 1 (2021): SainETIn
Publisher : Teknik Elektro Universitas Lancang Kuning

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31849/sainetin.v6i1.7301

Abstract

Motor induksi umumnya memiliki konstruksi sederhana, mudah dioperasikan, relatif lebih murah dalam perawatannya sehingga banyak digunakan di industri dan rumah tangga. Mesin listrik berupa motor induksi dilihat dari sumber tegangan salah satunya adalah jenis motor induksi tiga phasa. Motor induksi tiga phasa sering digunakan sebagai penggerak peralatan dengan kecepatan penuh atau kecepatan relatif konstan. Kecepatan motor induksi tiga phasa umumnya dapat dikendalikan yang salah satunya dengan pengaturan tegangan. Pengaturan atau pengendalian tegangan pada motor induksi tiga phasa untuk memperoleh kecepatan yang berubah, dapat diperoleh dengan menggunakan AC voltage regulator tiga phasa. Perubahan sumber tegangan masukan yang variabel pada motor induksi tiga phasa akan mempengaruhi parameter motor induksi tiga phasa termasuk juga konsumsi atau penggunaan energi listrik. Dari hasil penelitian ini diperoleh konsumsi energi listrik motor induksi tiga phasa hubungan bintang tanpa beban dengan kecepatan 1500 rpm tegangan 380 V lebih tinggi sebesar 0,141 kWh selama 15 menit dibanding dengan tegangan 220 V, motor induksi tiga phasa hubungan bintang berbeban dengan tegangan 220 V beban 1200 Watt konsumsi energi listriknya lebih tinggi sebesar 0,441 kWh dibanding beban 300 Watt, total daya listrik motor induksi tiga phasa hubungan delta tanpa beban dengan tegangan 220 V lebih tinggi sebesar 0.248 kW dibanding dengan tegangan 140 V dan motor induksi tiga phasa hubungan delta berbeban dengan tegangan 220 V beban 1200 Watt konsumsi energi listriknya lebih tinggi sebesar 0.988 kWh dibandingkan dengan beban 300 Watt. Kata Kunci: Motor induksi tiga phasa, AC voltage regulator, energi listrik
Analisis Eksitasi Generator Unit 3 Pembangkit Listrik Tenaga Gas (PLTG) Teluk Lembu PT. PLN (Persero) Sektor Pembangkitan Pekanbaru Ramadhan; Zondra, Elvira; Putra Halilintar, Masnur
SainETIn : Jurnal Sains, Energi, Teknologi, dan Industri Vol. 6 No. 1 (2021): SainETIn
Publisher : Teknik Elektro Universitas Lancang Kuning

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31849/sainetin.v6i1.7318

Abstract

Pembangkit Listrik Tenaga Gas (PLTG) Teluk Lembu merupakan salah satu pembangkit listrik yang terdapat di area Pusat Kota Pekanbaru. Dengan masing-masing unit memiliki kapasitas daya 21,6 MW. Guna peningkatan keandalan sistem maka akan dilakukan analisa eksitasi pada PLTG Teluk Lembu Unit 3 dengan membandingkan analisa arus eksitasi (If) terhadap daya reaktif (Q) dan terhadap tegangan induksi (Ea) yang ditimbulkan. Dalam melakukan penelitian data yang diambil adalah berupa data aktual diambil dari log sheet dan spesifikasi generator. Dari data loghseet harian pada tanggal 01 hingga tanggal 04 bulan Agustus 2020 arus eksitasi yang dirangkum dari nilai arus eksitasi terendah hingga nilai tertinggi dari mulai arus eksitasi terendah 143 A dengan daya reaktif 2,1 MVAr dan arus eksitasi tertinggi 156 A dengan daya reaktif 2,4 MVAr dan hubungan arus eksitasi terhadap tegangan induksi pada arus eksitasi 143 A terdapat tegangan induksi menghasilkan 15,686 kV dan arus eksitasi 156 A menghasilkan tegangan induksi yang lebih tinggi yaitu 15,827 kV. Dengan meningkatnya beban berpengaruh terhadap menurunya tegangan output. Untuk menstabilkan tegangan output maka perlu menaikan arus eksitasi generator.
Analisis Keandalan Sistem Distribusi 20 kV dengan Metode FMEA pada Penyulang Akasia dan Lele PT PLN (Persero) ULP Kota Barat Lestari, Citra Afri; Zulfahri, Zulfahri; Situmeang, Usaha
SainETIn : Jurnal Sains, Energi, Teknologi, dan Industri Vol. 6 No. 1 (2021): SainETIn
Publisher : Teknik Elektro Universitas Lancang Kuning

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31849/sainetin.v6i1.7408

Abstract

The level of reliability of a distribution system is very important to ensure the continuity of electricity supply to consumers. This final project was made with the aim of calculating the reliability index using the Failure Modes And Effects Analysis (FMEA) method. This research was conducted on Akasia Feeders and Lele Feeders at PT. PLN (Persero) ULP Kota Barat Pekanbaru.The existing condition of the Akasia Feeder in 2019 obtained SAIFI results of 6,419 disturbances/customers and in 2020 it was 2,814 disturbances/customers. While the 2019 Lele Feeder obtained SAIFI results of 5,005 disturbances/customers and in 2020 it was 2,196 disturbances/customers. While the SAIDI Akasia Feeder results in 2019 were 353,329 minutes/customer and in 2020 it was 105,080 minutes/customer. While the 2019 Lele Feeder obtained SAIDI results of 270,191 minutes/customer in 2020 of 111.424 minutes/customer. Considerable savings after maintenance at the Akasia Feeder and Lele Feeder. From the calculation obtained savings of Rp. 41,215,943.94 on Akasia Feeder and Rp. 10,806,099.21 on Lele Feeder for one year. The results obtained after repair efforts by scrounging trees to a safe distance for the network carry out routine network infections, so that they can more quickly map out disturbances to feeders. Limiting the number of customer outages by installing reclosers, LBS and sectionalizers. Based on the evaluation results, these two feeders are categorized as reliable, because they are below the standard value that has been determined.
Sistem Pengasapan Ikan Otomatis Mengunakan Arduino AT MEGA 2560 Maharmi, Benriwati; Palaha, Fadhli; Prasetyo, Findo
SainETIn : Jurnal Sains, Energi, Teknologi, dan Industri Vol. 6 No. 1 (2021): SainETIn
Publisher : Teknik Elektro Universitas Lancang Kuning

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31849/sainetin.v6i1.7872

Abstract

Ikan air tawar memiliki kandungan protein yang tinggi yang disukai oleh masyarakat banyak, selain harganya yang relative terjangkau dan banyak dibudidayakan. Ikan air tawar merupakan makanan yang cepat megalami pembusukan. Di Riau sendiri yang terkenal dengan ikan salai yang diproses dengan pengasapan supaya ikan lebih tahan lama dan menambah cita rasa pada ikan, pengasapan ikan secara tradisional dengan sistem terbuka dinilai kurang efektif karena panas dan asap yang dihasilkan akan banyak terbuang. Dalam penelitian ini dikembangkan sistem pengasapan otomatis dengan menggunakan elektrik dan tertutup, sehingga proses pengasapan lebih efektif. Alat pengasapan ikan otomatis berbasis mikrokontroler Arduino AT Mega 2560 dan sensor DHT 22 untuk mengontrol suhu dan kelembaban secara otomatis. Hasil penelitian diperoleh pengasapan secara konvensional membutuhkan waktu 12-13 jam, sedangkan pengasapan ikan otomatis membutuhkan waktu 7-8 jam. Nilai suhu yang digunakan pada alat pengasapan ikan yaitu mencapai 80˚C ketika nilai suhu melebihi 80˚C maka secara otomatis element (pemanas) akan mati. Kipas sebagai alat untuk mensirkulasi asap akan bekerja pada suhu 60 oC berhenti bekerja pada suhu 58 oC.
Analisa Stabilitas Sistem Kelistrikan Sumatera dengan Beroperasinya PLTGU Riau 275 MW menggunakan Simulasi Digsilent Yolnasdi, Yolnasdi; Waskito, Lilik Anggit; Setiawan, David
SainETIn : Jurnal Sains, Energi, Teknologi, dan Industri Vol. 6 No. 1 (2021): SainETIn
Publisher : Teknik Elektro Universitas Lancang Kuning

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31849/sainetin.v6i1.8871

Abstract

Sumatra's electricity system is the second largest in Indonesia after the Java-Bali electricity system. According to the 2019-2028 RUPTL (General Plan for Electricity Concession) in the Sumatra system, in Riau province, the IPP PLTGU Riau 275 MW plant will operate in 2021. the inclusion of the Riau 275 MW PLTGU plant in the system, in addition to increasing the power supply, will also affect stability. Sumatra electricity. the analysis is needed to see the reliability of the system when a disturbance occurs. The observed stability is the stability of the voltage and frequency as a result of the trip generator disturbance. Several scenarios were carried out to see frequency stability by tripling several generating units until the system stability limit was exceeded. To overcome the frequency stability disturbance, a low-frequency load release scheme (UFLS) is carried out so that the system can maintain its stability. In this study, Digsilent 15 software was used to run the simulation. The simulation results show that when the Riau 275 MW PLTGU is already operating and there is a disturbance in the system, the frequency response of the system is better than when the unit is not yet operating. In the fault scenario of 4 generating units (411 MW) trip, the system stability limit is exceeded, so it is necessary to carry out a load shedding scheme (UFLS) to maintain its stability. The implementation of the UFLS scheme when the Riau 275 MW PLTGU was already operating provided a saving of 73.47 MW or the equivalent of Rp. 106,142,109.00 per hour

Page 1 of 1 | Total Record : 6