cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota tangerang selatan,
Banten
INDONESIA
Jurnal Organisasi Dan Manajemen
Published by Universitas Terbuka
ISSN : 20859686     EISSN : 24429155     DOI : -
Merupakan media informasi dan komunikasi para praktisi, peneliti, dan akademisi yang berkecimpung dan menaruh minat serta perhatian pada pengembangan organisasi dan manajemen. Diterbitkan oleh Lembaga Penelitian dan Pengabdian kepada Masyarakat, Universitas Terbuka.
Arjuna Subject : -
Articles 12 Documents
Search results for , issue "Vol 7 No 2 (2011)" : 12 Documents clear
PENGORGANISASIAN PERENCANAAN DESA: KAJIAN DI DESA KALONGSAWAH KECAMATAN JASINGA KABUPATEN BOGOR Karyana, Ayi
Jurnal Organisasi Dan Manajemen Vol 7 No 2 (2011)
Publisher : LPPM Universitas Terbuka

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (106.736 KB)

Abstract

Development Planning Consultation (Musrenbang) Village is an annual discussion forum of villages stakeholders to agree on Village Development Work Plan (RKP Village) in the planned budget. This study aims to describe and analyze: 1) formation of Musrenbangdes Organizing Team (TPM), 2) formation of village Musrenbang Team Guide by TPM; 3) preparation of technical implementation village Musrenbang; and 4) a participatory rural assessment and dialogue. Writing method used in this study is descriptive analysis. The study shows, in the process of team formation TPM, the preparation of TPM personnel is the right and depends on the Village Head. TPM in performing their duties do not form a team or guides Working Group (WG), whereas the normative should be formed. The Working Group role and duty are process designer, managing the process from pre-to post-musrenbangdes stage, as the manager of a meeting or discussion forum and as a source of information. In the process of technical preparation through the stages of implementation, Musrenbangdes does not begin with Deliberation Hamlet (Musdus), there is no agenda for preparing the implementation plan of village workshops, Village Representative Body (BPD) does not specifically implement Musrenbangdes agenda. Village Assessment Team was not formed, so there is no village study to compile data / information on the latest village issues. Organizing musrenbang villages in the Village District Kalongsawah Jasinga Bogor Regency, ranging from the establishment of Village TPM Team Guide/ Working Group, technical preparation and review of the implementation of village meetings in a participatory and dialogical were not implemented optimally.
PENGARUH PENERAPAN SISTEM MANAJEMEN MUTU ISO 9001:2008 TENTANG PELAKSANAAN UJIAN AKHIR SEMESTER TERHADAP KOMPETENSI KARYAWAN PENGUJIAN DI UNIT PROGRAM BELAJAR JARAK JAUH UNIVERSITAS TERBUKA PEKANBARU Utami, Tiwi Nurjannati
Jurnal Organisasi Dan Manajemen Vol 7 No 2 (2011)
Publisher : LPPM Universitas Terbuka

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (72.367 KB)

Abstract

The Quality Management System Certificate ISO 9001:2008 awarded to UPBJJ-UT Pekanbaru indicated that it had used a variety of standard procedures in a variety of services area including the implementation of the final exam. This paper intends to investigate whether the implementation of ISO procedures affect the competence of examination staff UPBJJ-UT Pekanbaru. Regression analysis technique used to see the impact of implementation ISO procedures on staff competence. From this research we concluded that the implementation of ISO procedures do not affect the competency of staff because the ISO procedures are not adaptive to the condition of the field.

Page 2 of 2 | Total Record : 12