cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota surabaya,
Jawa timur
INDONESIA
IJTI (International Journal Of Transportation And Infrastructure)
ISSN : 25974734     EISSN : 25974769     DOI : -
Core Subject : Engineering,
Arjuna Subject : -
Articles 7 Documents
Search results for , issue "Vol 4 No 1 (2020): September 2020" : 7 Documents clear
Performance analysis of Unsignal Intersection and Road section with MKJI Method 1997 Muhammad Isradi; Enif Asfarianto Pratama
IJTI International Journal of Transportation and Infrastructure eISSN 2597-4769 pISSN 2597-4734 Vol 4 No 1 (2020): September 2020
Publisher : NAROTAMA UNIVERSITY, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/ijti.v4i1.1160

Abstract

Intersection Telkom Jatiasih is one of the congestion point in Bekasi City. This is at leave because of the high volume of traffic and also a busy route from Bekasi to Jakarta and the surrounding area, plus the direction to the toll gate Jatiasih. There is no sign – traffic sign making of Intersection Telkom Jatiasih is an unsignable junction, this is what causes the flow of irregular vehicles causing congestion. The data retrieval method is done by surveying directly to the research site. Based on survey result in Telkom Jatiasih intersection, the highest vehicle volume accurred in the afternoon of Monday, April 29 th, 2019. Calculated results based on the field survey result data using the MKJI 1997 book guidelines, obtaining the Degree of Saturation (DS) = 1,86 with the Level Of Service F value, indicating the stopping of the vehicle current at the congestion point such as the meeting path, or repair lanes that cause a long queue of vehicles. On the road Of Wibawa Mukti II Highway – Jatiasihi the vehicle flows are still recorded stably with the Degree of Saturation (DS) = 1,16 with a Level Of Service F value which means the level of road service is still stable. From the research results get an alternative solution Telkom Jatiasih intersection is in alternative 2 because it gets a decrease in the Degree of Saturation (DS) = 1,11 with the value of the Level Of Service F which means high traffic flow condition, but Current conditions are still stable.
Railway Planning Double-Double Track (Case Study of Bekasi Station km 26 + 652 - Jatinegara Station km 12 + 050 Ido Prasetio; Andri irfan rifai
IJTI International Journal of Transportation and Infrastructure eISSN 2597-4769 pISSN 2597-4734 Vol 4 No 1 (2020): September 2020
Publisher : NAROTAMA UNIVERSITY, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/ijti.v4i1.1161

Abstract

Increasing the number of population and the development of activities will cause a growing need for space every day, this will result in physical changes and urban land use and can cause increased intensity of population movement from Megapolitan cities such as Bekasi, Bogor and Tangerang to the Metropolitan city (DKI Jakarta). Some people have now started to move from private vehicles to use public (mass) transportation such as buses, transjakarta, and electric rail trains or commonly known as KRL Commuter Line that serve Jabodetabek routes. The impact of crossing also causes buildup at each station. Train track with a single track (single track) is considered ineffective and inefficient and vulnerable to train accidents due to human error. It is necessary to develop or develop a double track to become a double-double track Bekasi Station km 26 + 652 - Jatinegara Station km 12 + 050. The research location is on the railway line from Bekasi Station to Jatinegara Station. The length of the train track is around 16 km and has 7 stations that are traversed, 5 of which are active (stop) and 2 passive stations.
Evaluation of Drainage Channels on Pabuaran Road Cibinong District of Bogor Regency Jantiara Eka Nandiasa; Ridwan Adi Sanjaya
IJTI International Journal of Transportation and Infrastructure eISSN 2597-4769 pISSN 2597-4734 Vol 4 No 1 (2020): September 2020
Publisher : NAROTAMA UNIVERSITY, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/ijti.v4i1.1162

Abstract

Drainage can be generally defined as a technical measure to reduce excess water, whether from rain, seepage, or excess irrigation water from an area / land, so that the function of the area / land is not disturbed. This study aims to analyze, assess and evaluate the condition and capacity of the channel in the sub-district Pabuaran Road Bogor Cibinong District to discharge the flooding. Data and information used is primary data in the form of rainfall data from the Meteorology and Geophysics from the nearest irrigation hall as well as secondary data, the authors survey directly at the sites. In the flood discharge processing method using two methods of hydrograph Unit hydrograph Unit Synthetic Synthetic Nakayasu and ITB. The results of both methods is used the largest flood discharge. Getting the design flood discharge using Synthetic Unit Hydrograph ITB on Channel A of 6,434 m3 / sec. Analysis of the results of the calculation of the existing discharge chute, the discharge contained on Channel A of 2.10 m3 / sec and Channel B amounting to 0.21 m3 / sec limpas both channels experience. Alternative solutions to the problems that limpas channel or unsafe they are planning a new dimension channel.
Traffic Analysis Due To Development on Off Ramp Becakayu Highway Amar Mufhidin; Eviani Subiastuti
IJTI International Journal of Transportation and Infrastructure eISSN 2597-4769 pISSN 2597-4734 Vol 4 No 1 (2020): September 2020
Publisher : NAROTAMA UNIVERSITY, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/ijti.v4i1.1163

Abstract

The kalimalang highway is a connecting road between the city of Jakarta and Bekasi, the high mobility of passenger vehicles and goods is a problem of congestion that must be minimized. The volume of vehicles on the Kalimalang highway has increased quite high each year, but this has not been matched by growth in capacity. Therefore the government plants to build the Becakayu toll road to reduce congestion. This study aims to determine bottlenecks that occur due to the construction of an off-ramp on the Becakayu toll road, especially in section 2A, which is located on Jl. Veteran, while the location under review is the intersections affected by the construction of the off-ramp including the intersection of four signaling BCP, intersection of four signaling Veteran and Sarbini unsigned intersection, Data analysis in this study uses the MKJI 1997 method. From this method displays the behavior of traffic, for signal intersections will display signal time, capacity, vehicle stopped ratio, queue length, and average delay and for unsignalized intersections will display capacity, average delay and queue opportunity. From the results of this study it was found that the signaled intersection had an average value of DS > 1, so for the service level at the intersection is the current forced / jammed with low speed. Where the largest queue length occurred 1876.7 m, an average delay of 210.30 SMP/ sec, and vehicles stopped at an average of 7378 SMP/hour. And for unsignalized intersections having an average DS <0.45, the service level at the intersection is a stable flow with operating speed starting to be limited by traffic conditions, this intersection has the greatest queue probability (QP%) 8.48-20.35 in the Saturday time period - afternoon and intersection delay 9.5 SMP / sec.
Analysis of the Environmental Drainage System of The Sugihwaras Village Apartment Sistu Wilujeng; Florianus Rooslan Edy Santosa
IJTI International Journal of Transportation and Infrastructure eISSN 2597-4769 pISSN 2597-4734 Vol 4 No 1 (2020): September 2020
Publisher : NAROTAMA UNIVERSITY, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/ijti.v4i1.1164

Abstract

Study Prone To Traffic Accidents on Diponegoro Street – Surabaya Sandri Adianto; Sri Wiwoho Mudjanarko
IJTI International Journal of Transportation and Infrastructure eISSN 2597-4769 pISSN 2597-4734 Vol 4 No 1 (2020): September 2020
Publisher : NAROTAMA UNIVERSITY, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/ijti.v4i1.1165

Abstract

Operational Plan For The Numbers Using Fast Mass Transport Trem In Surabaya Sapto Budi Wasono; M Zusron Anggik
IJTI International Journal of Transportation and Infrastructure eISSN 2597-4769 pISSN 2597-4734 Vol 4 No 1 (2020): September 2020
Publisher : NAROTAMA UNIVERSITY, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/ijti.v4i1.1166

Abstract

Traffic jams often occur in the city of Surabaya. Due to the increasing population and the desire to have private vehicles, this has led to the need for adequate additional road capacity. However, the frequent increase in road capacity is not enough with the very high growth of road users. Therefore, the Surabaya city government planned an alternative route to reduce the congestion that occurred, one of which was building a rapid mass transportation, the tram, the construction of the tram itself was still in the planning stage, requiring a study of the influence of operational plans on public interest in trams, specifically for motorcyclists. What factors can make motorbike riders divert to the tram. One way to find out how much interest motorbike riders have is to use multiple linear regression methods which require data from road users. Questionnaires are needed to retrieve data and collect samples consisting of 200 respondents. In this study the location of the deployment is in the area that trams are going to plan for, starting from Joyoboo - Jl.Raya Darmo - Urip Sumoharjo - Jl.Basuki Rahmat - Jl.Embong Malang - Jl.Blauran - Jl.Bubutan - Tugu Pahlawan - Jl. Indrapura - Jl. Rajawali. While going south will pass Jl. Heroes - Jl. Gemblongan - Jl, Tunjungan - Jl. Governor Suryo - Jl. Panglima Sudirman - Jl. Urip Sumoharjo - Jl. Raya Darmo - Terminal Joyoboyo

Page 1 of 1 | Total Record : 7