cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota bandung,
Jawa barat
INDONESIA
Jurnal Rekayasa Hijau
ISSN : 25794264     EISSN : 25501070     DOI : -
Jurnal Rekayasa Hijau diterbitkan 3 kali dalam satu tahun. Berisi tulisan yang diangkat dari hasil penelitian dan kajian analisis di bidang ilmu pengetahuan, teknologi, desain dan kebijakan ramah lingkungan.
Arjuna Subject : -
Articles 24 Documents
Search results for , issue "Vol 2, No 1 (2018)" : 24 Documents clear
Efisiensi Desain Ruang-Dalam pada Bangunan Pasar Vertikal di Kota Bandung Sihombing, Reza Phalevi; Prayoga, Novan
Jurnal Rekayasa Hijau Vol 2, No 1 (2018)
Publisher : Lembaga Penelitian dan Pengabdian Masyarakat Institut Teknologi Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (739.678 KB) | DOI: 10.26760/jrh.v2i1.2041

Abstract

ABSTRAKPembangunan pasar saat ini banyak mengarah ke pengembangan vertikal. Efisiensi dan keterbatasan lahan menjadi pertimbangan untuk membangun pasar secara vertikal. Permasalahan yang sering terjadi adalah tidak berfungsinya lantai (ruang) di lantai atas bangunan sehingga sepi tidak ada aktivitas. Permasalahan yang telah diketahui tersebut hampir terus berulang seiring pembangunan pasar secara vertikal. Tidak adanya pertimbangan budaya berpasar masyarakat Indonesia mungkin menjadi salah satu kegagalan bangunan pasar vertikal. Penelitian ini akan mengkaji desain beberapa pasar vertikal di Bandung yang kurang maksimal dalam pemakaian ruang di lantai atas. Dari hasil kajian penelitian ini diharapkan dapat memberikan gambaran mengenai mengapa area ruang lantai atas pasar vertikal cenderung tidak diminati.Kata kunci: Efisiensi Desain, Ruang Dalam, Pasar VertikalABSTRACTThe current market development leads much to vertical development. Efficiency and limitations of the land into consideration to build the market vertically. The problem that often happens is the malfunction of the floor (space) on the top floor of the building so quiet there is no activity. Known issues are almost constantly recurring as the market develops vertically. The absence of cultural considerations based on Indonesian society may be one of the failures of vertical market buildings. This research will examine the design of some vertical market in Bandung which is less than maximum in the use of space upstairs. From the results of this research study is expected to provide an overview of why the upper floor space area of the vertical market tends not to be in demand.Keywords: Design Efficiency, Space, Vertical Market
Penerapan Hitungan Volume Metode Simpson untuk Menghitung Volume Kapal dan Topografi Darat Perbani, Ni Made Rai Ratih Cahya; Rinaldy, -
Jurnal Rekayasa Hijau Vol 2, No 1 (2018)
Publisher : Lembaga Penelitian dan Pengabdian Masyarakat Institut Teknologi Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (826.81 KB) | DOI: 10.26760/jrh.v2i1.2046

Abstract

ABSTRAKDalam bidang hidrografi volume kapal diperlukan untuk menentukan titik kestabilan bagi peletakan transduser alat perum gema guna memperoleh ketelitian yang lebih baik. Hitungan volume juga diperlukan untuk menentukan tebal sedimen untuk rekayasa laut. Permukaan yang akan ditentukan volumenya umumnya tidak beraturan sehingga volume ditentukan berdasarkan hasil pengukuran sehingga belum dapat diketahui secara pasti keterwakilan volume yang dihasilkan terhadap volume sebenarnya. Tujuan dari penelitian ini adalah untuk mengetahui sejauh mana volume kapal yang dihitung menggunakan aturan Simpson dapat mewakili volume yang sebenarnya sehingga dapat diterapkan pada bidang permukaan tidak beraturan seperti untuk menghitung volume topografi darat atau dasar laut. Bentuk kapal diambil bidang setengah elipsoid supaya dapat dibandingkan dengan yang sebenarnya. Volume dihitung dengan menerapkan Aturan Pertama Simpson setelah proses gridding. Setelah diketahui sifat-sifatnya maka akan dapat diterapkan pada bidang permukaan yang tidak beraturan. Dari penelitian ini diperoleh bahwa kualitas keterwakilan volume lebih ditentukan oleh terwakilinya seluruh bentuk permukaan (terutama di tempat-tempat yang ekstrem) dibandingkan dengan ukuran grid, namun pertimbangan ukuran grid diperlukan untuk efisiensi proses hitungan.Kata kunci: volume, Aturan Pertama Simpson, ukuran grid.ABSTRACTIn hydrography the vessel volume is required to determine the stability point for setting up the transducer of echosounder to obtain better accuracy. Volume calculation is also required to determine thickness of sediment for marine engineering. Surface which the volume under it will be determined is generally irregular, so that the volume from the measurements will always have the uncertainty how fit it with the actual volume. This research is objected to find how the vessel volume calculated by Simpson rule can represent the actual volume so that it can be applied to irregular surface area such as land or seabed topography. Half ellipsoid is taken as the vessel ship so it can be compared with the actual. After gridding process then volume is calculated by applying Simpson First Rule. The characteristics which are found will give the consideration in application for irregular surfaces. It is found that the quality of volume representation more determined by how fit the entire surface shape (especially at extremes points) then the grid size. However, the grid size consideration is still required for efficiency in calculation.Keywords: volume, Simpson First Rule, grid size.
Analisis Luas dan Volume Sedimen pada Kanal Intake untuk Menjaga Ketersediaan Pasokan Air (Studi Kasus : PLTGU Muara Tawar, Bekasi Utara) Juli Arianto; N. M. R. Ratih C. Perbani; M. F. P. Kusumah
Rekayasa Hijau : Jurnal Teknologi Ramah Lingkungan Vol 2, No 1 (2018)
Publisher : Institut Teknologi Nasional, Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26760/jrh.v2i1.2045

Abstract

ABSTRAKPLTGU Muara Tawar merupakan salah satu pembangkit listrik yang menggunakan air laut untuk proses pendinginannya. Air laut tersebut disalurkan melalui kanal intake di mana sedimen yang berada di kanal intake akan mempengaruhi pasokan air. Untuk itu dalam menjaga ketersediaan pasokan air pada kanal intake perlu diketahui luas dan volume sedimennya. Penelitian ini bertujuan untuk mengetahui drying height pada saat air terendah, pola penyebaran sedimen, perubahan luas sedimen, kondisi kedalaman kritis, dan perubahan volume air dan sedimen antara Maret 2013 dan Desember 2014. Data yang digunakan berupa data posisi permukaan sedimen dan pasut pada Bulan Maret-April 2013 dan Desember 2014. Pada tahun 2013 didapatkan informasi bahwa pasokan air yang tersedia hanya 32,75% sementara di tahun 2014 hanya 32,69% dari syarat aman. Dengan demikian untuk memenuhi syarat aman pasokan air maka sedimen sampai 6 meter di bawah MSL yang harus dikeruk baik di tahun 2013 maupun 2014 sebesar lebih dari 60%.Kata kunci: kanal intake, sedimen, pasokan airABSTRACTPLTGU Muara Tawar is one of the power plants that use sea water as a coolant. The sea water is channeled through the intake canal where sediments in it will affect the water supply. For maintaining the water supply in intake canal it is necesssary to have an information about sediment area and volume. This study schemes are to determine the drying height at lowest low water, sediment distribution, changes in sediment area, critical depth condition, and changes in the volume and sediment beetween March 2013 and December 2014. The data used are the position of the sediment surface and the tide height on March to April 2013 and Desember 2014. It is obtained that for safety requirements the water supply left only 32,75% in 2013 and reduced to 32,69% in 2014. So, to achieve the safety requirements of water supply in 2013 and 2014 the sediment ought to be dredged more than 60% from 6 meter below MSL base.Keywords: intake canal, sediment, water supply
Efisiensi Desain Ruang-Dalam pada Bangunan Pasar Vertikal di Kota Bandung Reza Phalevi Sihombing; Novan Prayoga
Rekayasa Hijau : Jurnal Teknologi Ramah Lingkungan Vol 2, No 1 (2018)
Publisher : Institut Teknologi Nasional, Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26760/jrh.v2i1.2041

Abstract

ABSTRAKPembangunan pasar saat ini banyak mengarah ke pengembangan vertikal. Efisiensi dan keterbatasan lahan menjadi pertimbangan untuk membangun pasar secara vertikal. Permasalahan yang sering terjadi adalah tidak berfungsinya lantai (ruang) di lantai atas bangunan sehingga sepi tidak ada aktivitas. Permasalahan yang telah diketahui tersebut hampir terus berulang seiring pembangunan pasar secara vertikal. Tidak adanya pertimbangan budaya berpasar masyarakat Indonesia mungkin menjadi salah satu kegagalan bangunan pasar vertikal. Penelitian ini akan mengkaji desain beberapa pasar vertikal di Bandung yang kurang maksimal dalam pemakaian ruang di lantai atas. Dari hasil kajian penelitian ini diharapkan dapat memberikan gambaran mengenai mengapa area ruang lantai atas pasar vertikal cenderung tidak diminati.Kata kunci: Efisiensi Desain, Ruang Dalam, Pasar VertikalABSTRACTThe current market development leads much to vertical development. Efficiency and limitations of the land into consideration to build the market vertically. The problem that often happens is the malfunction of the floor (space) on the top floor of the building so quiet there is no activity. Known issues are almost constantly recurring as the market develops vertically. The absence of cultural considerations based on Indonesian society may be one of the failures of vertical market buildings. This research will examine the design of some vertical market in Bandung which is less than maximum in the use of space upstairs. From the results of this research study is expected to provide an overview of why the upper floor space area of the vertical market tends not to be in demand.Keywords: Design Efficiency, Space, Vertical Market
Penerapan Hitungan Volume Metode Simpson untuk Menghitung Volume Kapal dan Topografi Darat Ni Made Rai Ratih Cahya Perbani; - Rinaldy
Rekayasa Hijau : Jurnal Teknologi Ramah Lingkungan Vol 2, No 1 (2018)
Publisher : Institut Teknologi Nasional, Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26760/jrh.v2i1.2046

Abstract

ABSTRAKDalam bidang hidrografi volume kapal diperlukan untuk menentukan titik kestabilan bagi peletakan transduser alat perum gema guna memperoleh ketelitian yang lebih baik. Hitungan volume juga diperlukan untuk menentukan tebal sedimen untuk rekayasa laut. Permukaan yang akan ditentukan volumenya umumnya tidak beraturan sehingga volume ditentukan berdasarkan hasil pengukuran sehingga belum dapat diketahui secara pasti keterwakilan volume yang dihasilkan terhadap volume sebenarnya. Tujuan dari penelitian ini adalah untuk mengetahui sejauh mana volume kapal yang dihitung menggunakan aturan Simpson dapat mewakili volume yang sebenarnya sehingga dapat diterapkan pada bidang permukaan tidak beraturan seperti untuk menghitung volume topografi darat atau dasar laut. Bentuk kapal diambil bidang setengah elipsoid supaya dapat dibandingkan dengan yang sebenarnya. Volume dihitung dengan menerapkan Aturan Pertama Simpson setelah proses gridding. Setelah diketahui sifat-sifatnya maka akan dapat diterapkan pada bidang permukaan yang tidak beraturan. Dari penelitian ini diperoleh bahwa kualitas keterwakilan volume lebih ditentukan oleh terwakilinya seluruh bentuk permukaan (terutama di tempat-tempat yang ekstrem) dibandingkan dengan ukuran grid, namun pertimbangan ukuran grid diperlukan untuk efisiensi proses hitungan.Kata kunci: volume, Aturan Pertama Simpson, ukuran grid.ABSTRACTIn hydrography the vessel volume is required to determine the stability point for setting up the transducer of echosounder to obtain better accuracy. Volume calculation is also required to determine thickness of sediment for marine engineering. Surface which the volume under it will be determined is generally irregular, so that the volume from the measurements will always have the uncertainty how fit it with the actual volume. This research is objected to find how the vessel volume calculated by Simpson rule can represent the actual volume so that it can be applied to irregular surface area such as land or seabed topography. Half ellipsoid is taken as the vessel ship so it can be compared with the actual. After gridding process then volume is calculated by applying Simpson First Rule. The characteristics which are found will give the consideration in application for irregular surfaces. It is found that the quality of volume representation more determined by how fit the entire surface shape (especially at extremes points) then the grid size. However, the grid size consideration is still required for efficiency in calculation.Keywords: volume, Simpson First Rule, grid size.
Keragaan Usaha dan Nilai tambah Pada Agroindustri Keripik Tike (Studi Kasus di Desa Jumbleng Kecamatan Losarang Indramayu) Endah Djuwendah
Rekayasa Hijau : Jurnal Teknologi Ramah Lingkungan Vol 2, No 1 (2018)
Publisher : Institut Teknologi Nasional, Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26760/jrh.v2i1.2037

Abstract

ABSTRAKKeripik tike merupakan pangan lokal tradisional dari Kabupaten Indramayu yang berasal dari umbi tumbuhan Tike (Eleocharis dulcis Brumn f). Tike merupakan tumbuhan rawa pasang surut sulfat masam. Tanaman ini memiliki manfaat kesehatan karena mengandung Zat antibiotik puchiin dan vitamin C. Usaha pengolahan keripik tike memiliki peran penting dan potensial untuk dikembangkan karena mampu memberikan nilai tambah dari umbi tike menjadi komoditas pangan yang khas (local spesifik), memiliki cita rasa enak, bermanfaat bagi kesehatan, menciptakan kesempatan kerja dan memberikan pendapatan bagi masyarakat. Oleh karena itu cukup potensial untuk berkembang. Namun hingga saat ini usaha keripik tike belum berkembang secara luas karena terkendala oleh berbagai faktor diantaranya keterbatasan bahan baku, permodalan dan wilayah pemasaran. Tujuan penelitian ini adalah untuk menganalisis keragaan usaha dan nilai tambah agroindusti keripik tike yang berada di desa Jumbleng Kecamatan Losasang Kabupaten Indramayu. Metode penelitian yang digunakan adalah deskriptif kualitatif dengan teknis penelitiannya berupa studi kasus. Hasil penelitian menunjukkan bahwa pengadaan bahan baku umbi tike diperoleh dari Kabupaten Bekasi dan Cilacap dengan harga berkisar Rp 16.000 s,d 18.000 per Kg. Terjadi keterbatasan bahan baku tike saat peralihan dari musim kemarau ke musim penghujan. Tenga kerja yang digunakan berasal dari desa setempat dan berjumlah 2-6 orang per unit usaha dengan sistem upah harian. Modal penyedia bahan baku terdiri dari modal pribadi dan modal pinjaman. Pengolahan keripik tike melalui proses pencucian, perendaman, penyangraian, penumbukan, penjemuran, penggorengan dan pengemasan. Pemasaran Keripik tike dilakukan oleh pedagang perantara yaitu penyalur dan pengecer dengan harga jual berkisar Rp 2000 – 10,000 untuk pemasaran langsung kemasan kecil dan Rp 80.000 s.d 90.000/kg untuk pemasaran tidak langsung melalui penyalur. Wilayah pemawaran keripik tike umumnya di wilayah Kabupaten Indramayu dan Cirebon. Kapasitas produksi keripik tike rata-rata 50 kg umbi tike per proses produksi dengan tingkat konversi produk akhir mencapai 0,96. Nilai tambah per kilogam bahan baku adalah Rp 35.320, rasio nilai tambah 45,99 % dan keuntungan per nilai tambah adalah 30,36 %. Margin balas jasa terhadap faktor produksi paling besar dimiliki oleh keuntungan pengrajin yaitu 57,16 %, pendapatan tenaga kerja sebesar 29,41% dan sisanya 13,43% merupakan balas jasa terhadap sumbangan input lain.Kata kunci: Keripik tike, keragaan usaha, nilai tambahABSTRACTTike Chips is a traditional local food from Indramayu Regency derived from tuber Tike (Eleocharis dulcis Brumn f). Tike is a sulphurous acid wet tidal swamp. This plant has health benefits because it contains Puchiin antibiotic and vitamin C. Tike chips processing business has an important role and potential to be developed because it can provide added value from tike bulb to be a specific local food commodity, has good taste, beneficial for health, creating employment opportunities and providing income for the community. It is therefore quite potential to develop. However, until now the business of tike chips has not developed widely due to constrained by various factors such as limited raw materials, capital and marketing area. The purpose of this research is to analyze business performance and value added agroindustry tike chips that located in Jumbleng Village, Subdistrict of Losasang of Indramayu Regency. The research method used is descriptive qualitative with technical research in the form of case study. The results of research shows that the procurement of tike tuber raw material is obtained from Bekasi and Cilacap regencies with prices ranging from Rp 16.000 s, d 18,000 per kg. There is a limitation of tike raw materials during the transition from dry season to rainy season. Working tillers are from local villages and numbered of 2-6 people per business unit with daily wage system. Capital providers of raw materials consist of personal capital and loan capital. Processing of tike chips through washing process, immersion, roasted, collision, drying, frying and packaging. Marketing Chips tike is done by intermediary traders ie dealers and retailers with selling prices ranging from Rp 2000 - 10,000 for direct marketing of small packaging and Rp 80.000 s.d 90.000 / kg for indirect marketing through distributors. Tike chips offer areas generally in the districts of Indramayu and Cirebon. The production capacity of tike chips averages 50 kg of tike bulbs per production process with a final product conversion rate of 0.96. The added value per kilogram of raw materials is Rp 35,320, the value added ratio is 45.99% and the profit per added value is 30.36%. The greatest profit margin for the factor of production is owned by the craftsman's profit of 57.16%, the employment income of 29.41% and the remaining 13.43% representing the remuneration to other input contributions.Keywords: Tike chips, business performance, added value
Evaluasi Performansi dan Tingkat Kelelahan dalam Upaya Optimisasi Capaian Pembelajaran Sistem Praktikum di Perguruan Tinggi X Asterina Febrianti; Lauditta Irianti; Aldila Hasanah
Rekayasa Hijau : Jurnal Teknologi Ramah Lingkungan Vol 2, No 1 (2018)
Publisher : Institut Teknologi Nasional, Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26760/jrh.v2i1.2042

Abstract

ABSTRAKPraktikum merupakan sebuah proses pengamatan, percobaan, dan pengujian terhadap materi mata kuliah yang didapatkan. Praktikum diadakan sebagai salah bentuk pencapaian proses pembelajaran suatu mata kuliah. Satu sks terdiri dari 170 menit pembelajaran perminggu dalam satu semester untuk aktivitas praktikum. Aktivitas praktikum dilaksanakan selama 120 menit dan sisanya disebut tugas mandiri sebanyak 50 menit. Pada kenyataannya tugas mandiri yang dilaksanakan mahasiswa lebih dari 50 menit dalam 1 minggu. Mahasiswa sering terlihat mengalami penurunan performansi dalam aktivitas perkuliahan disertai dengan munculnya kondisi kelelahan. Kondisi tersebut sangat mempengaruhi beban kerja mental mahasiswa dalam beraktivitas, sehingga tujuan penelitian ini adalah untuk mengevaluasi sistem praktikum berdasarkan beban kerja mental melalui pengukuran performansi dan kelelahan di perguruan Tinggi X. Pengukuran tingkat performansi (waktu reaksi) menggunakan psychomotor vigilance test (PVT) dengan parameter mean 1/RT, shortest 10% 1/RT, lapses, dan longest 10% 1/RT, serta kelelahan menggunakan kuesioner visual analog scale (VAS). Pengukuran dilakukan setelah praktikum, sebelum asistensi laporan, dan sebelum presentasi laporan. Uji statistik menunjukan untuk parameter performansi yaitu shortest 10% 1/RT signifikan medeteksi perubahan untuk ketiga kondisi, sementara untuk mean 1/RT, lapses, dan longest 1/RT tidak signifikan dalam mendeteksi perubahan waktu reaksi untuk ketiga kondisi tersebut. Parameter VAS juga menunjukan hasil tidak signifikan dalam perubahan kondisi kelelahan untuk ketiga kondisi tersebut. Hasil menunjukan bahwa mahasiswa tidak mengalami peningkatan beban kerja mental saat melewati rangkaian proses praktikum di jurusan teknik industri pada perguruan tinggi X, sehingga sistem praktikum yang diterapkan saat ini dalam pencapaian proses pembelajaran sudah optimal.Kata kunci: waktu reaksi, kelelahan, PVT, VAS.ABSTRACTPracticum are observation, experiment, and examination towards the obtained course material. Practicum held as a form of achievement learning process of a course. One course credit (sks) has 170 minutes learning once a week witihin a semester dedicated for practicum activity. Practicum activity consists of 120 minutes actual practice and 50 minutes independent task. In fact, independent task occurs over 50 minutes once a week. Many Students have seen their academics performances decline, along with fatigue because of the practice activity while also attending lectures in classes. These Conditions often affected students mental workload, which is why the aim of this study is to evaluate practicum activity system based on mental workload through measurement of perfomance and fatigue on college X. Measurement performance rate (reaction time) use psychomotor vigilance test (PVT) with parameter mean 1/RT, shortest 10% 1/RT, lapses, and longest 10% 1/RT, with questionnaire visual analog scale (VAS) for fatigue measurement. Each measurement was made after practicum, before assistance report, and before a report presentation. Statistics showed shortest 10% 1/RT significant detecting transformation for third condition, while mean 1/RT, lapses, and longest 10% were not significant. VAS parameter showed not significant result in term of detecting transformation for those 3 condition mentioned berofe. Result showed mental workload through series of practicum activity at Industrial Engineering Major on college X are not significant, which is showed that the current practicum system activity for achievement learning process are optimum.Keywords: reaction time, fatigue, PVT, VAS.
Efisiensi Penyisihan Logam Fe Dengan Menggunakan Instalasi Pengolahan Lindi Compact (IPLC) Septi Agriani; - Rachmawati S Dj
Rekayasa Hijau : Jurnal Teknologi Ramah Lingkungan Vol 2, No 1 (2018)
Publisher : Institut Teknologi Nasional, Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26760/jrh.v2i1.2047

Abstract

ABSTRAKLindi berasal dari proses dekomposisi sampah yang mengandung materi tersuspensi, terlarut, dan terekstraksi, sehingga kandungan lindi sangat berbahaya. Pada penelitian ini akan diteliti logam Fe yang terdapat dalam lindi TPA Sarimukti serta parameter pendukung, seperti pH, suhu, DO, kekeruhan dan TSS. Pengolahan dilakukan dengan menggunakan reaktor Instalasi Pengolahan Lindi Compact (IPLC) secara semi kontinu dengan kombinasi antara anaerob dan aerob. Waktu detensi yang digunakan, yaitu 31,33 jam yang didapatkan dari tracer test. Proses seeding dan aklimatisasi dilakukan menggunakan bakteri fakultatif, dengan dua media lekat, yaitu kaldness dan bioball. Berdasarkan dari karakteristik awal didapatkan beberapa parameter yang tidak memenuhi baku mutu Peraturan Menteri Lingkungan Hidup Tahun 2016 Tentang Baku Mutu Lindi Bagi Usaha dan/atau Kegiatan Tempat Pemrosesan Akhir Sampah, yaitu BOD5 sebesar 1.071,55-1.593,29 mg/l, COD sebesar 4.800-6.400 mg/l dan TSS sebesar 470-556 mg/l. Berdasarkan hasil penelitian, IPLC mampu menyisihkan Fe sebesar 53,87% dari konsentrasi awal.Kata kunci: Air Lindi, Logam Berat, IPL Compact, SarimuktiABSTRACTLeachate originates from waste decomposition process which contains suspended, dissolved, and extracted material, so that leachate content is considered as hazardous. In this research, leachate was obtained from municipal solid waste (TPA) Sarimukti. Parameters to be studied is heavy metals Fe which contained in the leachate from TPA Sarimukti. In addition several supporting parameters, such as pH, temperature, DO, turbidity and TSS are studied. The treatment was carried out using a pilot plant scale reactor of Leachate Compact Processing Plant (IPLC), operated semi-continuously using biological, physical and chemical processing systems as well as anaerobic-aerobic configurations. The detention time used were 31,33 hours which was obtained from the tracer test. The seeding and acclimatization process was carried out using facultative bacteria, with two sticky media, caldness and bioball. Based on the results, IPLC was able to eliminate Fe by 53,87% from the initial concentration.Keywords: Leachate, Heavy Metal, IPL Compact, Sarimukti
Faktor- Faktor yang Mempengaruhi Proses Alih Fungsi Lahan Padi Sawah di Kelurahan Kersanegara, Kecamatan Cibeureum, Kota Tasikmalaya, Provinsi Jawa Barat Prilly Martunisa; Trisna Insan Noor
Rekayasa Hijau : Jurnal Teknologi Ramah Lingkungan Vol 2, No 1 (2018)
Publisher : Institut Teknologi Nasional, Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26760/jrh.v2i1.2038

Abstract

ABSTRAKPertanian selama ini hanya dihargai karena kemampuannya menghasilkan bahan pangan, sandang dan papan. Selain itu, pertanian juga memberikan berbagai jasa/fungsi positif di bidang sosial budaya, ekonomi dan lingkungan yang dikenal dengan multifungsi pertanian dan belum banyak diketahui masyarakat. Seiring dengan pertumbuhan penduduk dan perekonomian banyak terjadi alih fungsi lahan terutama lahan padi sawah untuk berbagai kepentingan. Penelitian ini bertujuan untuk mengetahui faktor-faktor dan faktor dominan yang mempengaruhi terjadinya alih fungsi lahan padi sawah. Penelitian ini dilakukan di Kelurahan Kersanagara, Kecamatan Cibeureum, Kota Tasikmalaya, Jawa Barat. Teknik pengambilan data dilakukan adalah wawancara kepada 45 orang petani yang pernah melakukan alih fungsi lahan padi sawah. Desain penelitian ini adalah kuantitatif deskriptif. Analisis data menggunakan regresi linier berganda dengan alat bantu SPSS version 24. Hasil penelitian menunjukkan bahwa umur petani, pendapatan petani, luas kepemilikkan lahan, sistem waris, pengaruh tetangga yang mengalihfungsikan lahannya, pengaruh pengusaha/investor, keadaan lingkungan, kebijakan pemerintah dan pendidikan petani secara keseluruhan memberikan pengaruh nyata terhadap alih fungsi lahan padi sawah. Variabel umur petani dan luas kepemilikkan lahan menjadi faktor yang dominan terhadap terjadinya alih fungsi lahan padi sawah.Kata kunci: faktor-faktor, alih fungsi, lahan padi sawahABSTRACTAgriculture has been only valued for its ability to produce primary needs of human being. In addition, agriculture also provides a range of positive services / functions at socio-cultural, economic and environmental fields known as multifunctional agriculture and have not been known to the public yet. Along with the raising population and the growth of economic, there has been occured many land conversion, particularly for paddy fields as it for several needs. This land conversion is caused by several factors. The purpose of this research is to identify the factors as well as to find the dominant among them that affect the land conversion of paddy fields. This research was conducted in Kelurahan Kersanagara, Kecamatan Cibeureum, Kota Tasikmalaya, Jawa Barat. In this research, the data was collected by interviewing 45 farmers who ever did changes to the utility of paddy land. The design of this study is quantitative descriptive. Data analysis using multiple linear regression with SPSS version tool 24. This research shows the results that the age of farmers, farmers income, land ownership, inheritance systems, the influance of neighbors that also converted land, influence of investors, environmental conditions, government policies and farmer education generally gives a real effect on the conversion of paddy land. After all, the age of farmers and the land ownership become the dominant factor toward the land conversion that occured.Keywords: factors, land conversion, paddy field
Kajian Perhitungan Beban Pencemaran Air Sungai Di Daerah Aliran Sungai (DAS) Cikapundung dari Sektor Domestik Yushi Rahayu; Iwan Juwana; Dyah Marganingrum
Rekayasa Hijau : Jurnal Teknologi Ramah Lingkungan Vol 2, No 1 (2018)
Publisher : Institut Teknologi Nasional, Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26760/jrh.v2i1.2043

Abstract

ABSTRAKSungai Cikapundung merupakan anak sungai DAS Citarum Hulu yang digunakan untuk sumber air baku air minum, irigasi dan perikanan di Kota Bandung. Sungai Cikapundung yang melewati Kabupaten Bandung Barat, Kota Bandung dan Kabupaten Bandung berpotensi tercemar oleh limbah dari sektor domestik. Namun saat ini belum ada informasi mengenai beban pencemar terhadap Sungai Cikapundung dari sektor domestik. Oleh karena itu perlu dilakukan penelitian dengan tujuan untuk mengukur tingkat pencemaran di Sungai Cikapundung dengan menghitung, status mutu air, potensi beban pencemaran sektor domestik. Status mutu air ditentukan dengan menggunakan metode indeks pencemar dan potensi beban pencemaran Sungai Cikapundung dihitung menggunakan pendekatan faktor emisi limbah domestik. Berdasarkan hasil perhitungan menunjukan bahwa Sungai Cikapundung pada tahun 2016 memiliki kriteria mutu air cemar sedang pada bulan kering dan cemar ringan di bulan basah. Sungai Cikapundung telahtercemar limbah domestik berdasarkan hasil perhitungan beban pencemar mengalami kenaikan seiring dengan meningkatnya jumlah penduduk pada tahun 2021 oleh 25.383,89 Kg/ hari TSS, 17.537,96 kg/hari BOD, 18.461,01 kg/hari COD, 889,97 kg/hari N-Total dan 96,92 Kg/hari P-Total.Kata kunci: Beban Pencemar, Domestik Cikapundung, Kualitas AirABSTRACTCikapundung river is the sub river of upper Citarum River which was used by the people in Bandung city as a raw water for drinking water, irrigation and fishery. Cikapundung river that passes through many districts of Bandung have a great potential of being polluted by from domestic waste. This condition will affects the water quality of Cikapundung water. Having this condition, the urgency of conducting the research for measure the polution level at Cikapundung river was reasonable, with calculating the water quality status, the potential polutions domestic sector. Water quality status is determined by using pollution index method and potential pollution load of Cikapundung River using domestic polution emission factor approach. Result of pollutant index calculation Cikapundung River at 2016 in dry months has severe polluted water quality. Cikapundung watershed contaminated with domestic waste in the calculation of polluted pollutant potency in 2016 by 25.383,89 Kg / day TSS, 17,537.96 kg / day BOD, 18.461.01 kg / day COD, 889.97 kg / day N-Total and 96.92 Kg / day P-Total.Keywords: Pollution Load, Cikapundung Domestic, Water.

Page 2 of 3 | Total Record : 24