Portal: Jurnal Teknik Sipil
ISSN : 20857454     EISSN : 2622576X     DOI : -
Core Subject : Engineering,
Portal: Jurnal Teknik Sipil merupakan jurnal berkala ilmiah nasional yang diterbitkan oleh Jurusan Teknik Sipil Politeknik Negeri Lhokseumawe sebagai wadah menyebarluaskan hasil penelitian dalam bidang ilmu Teknik Sipil untuk Dosen, Praktisi dan Mahasiswa. Portal terbit 2 (dua) kali dalam setahun yaitu bulan April dan Oktober.
Arjuna Subject : -
Articles 6 Documents
Search results for , issue "Vol 8, No 2 (2016)" : 6 Documents clear
RENCANA ANGGARAN BIAYA DAN METODE PELAKSANAAN PADA PROYEK PEMBANGUNAN JALAN AKSES PELABUHAN PERIKANAN LAMPULO STA 0+-000 SID 1+-013 KOTA BANDA ACEH Muhammad Irfan
Portal: Jurnal Teknik Sipil Vol 8, No 2 (2016)
Publisher : Politeknik Negeri Lhokseumawe

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30811/portal.v8i2.607

Abstract

Lampulo Fishing Port Road Access Project, Banda Aceh City with 1013 m of road length, 10 m road width, base course layer 15 cm thickness, subcase 20 cm layer, 6 cm surface Aspalt Concrete Binder Course (AC BC) and Talud work . This Final Project aims to determine the method of implementation and budget costs on the project. The calculation of the Budget Plan uses the EI Analysis (Estimated Index) to calculate the cost of Sub Base, Base Course, Prime Coat, Surface Aspalt Concrete Binder Course (AC-BC), and Talud work. In this calculation, the cost for Sub Base work is Rp.1.027.631.772,00, -. Work Base Course Rp.970.243.296, 00, -. Prime coat job Rp.121.358.725,00, -. Surface layer work Aspalt Concrete Binder Course (AC-BC) Rp.1.906.855.195,00, Talud Work Rp.2.639.141.122, 00, -. So the total cost of the budget is Rp.6.695.230.109, 00. As well as scheduling the implementation time using the curve S. The preparation of the Implementation method applied to the Project includes Sub Base, Base Course, Prime Coat and Surace Aspalt Cpncrete Binder Course (AC-BC) work in an effective and efficient manner based on the drawing of the plan.Keywords: Budget Costs, S Curve, and Methods of Accounting.
EVALUASI KINERJA SIMPANG BERSINYAL EMPAT LENGAN PADA SIMPANG INPRES KOTA LHOKSEUMAWE Gustina Fitri; Rosalina Rosalina; M. Arif Munandar
Portal: Jurnal Teknik Sipil Vol 8, No 2 (2016)
Publisher : Politeknik Negeri Lhokseumawe

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30811/portal.v8i2.604

Abstract

Lhokseumawe Inpres intersection consists of 4 approaches, which serve as a vehicle to change the direction of movement. The purpose of this study is to know the performance of signaled intersections on any approach to the degree of saturation based on current capacity using the Indonesian Road Capacity Manual (MKJI). The research was conducted for 3 days from 06.30 - 18.00 divided over 3 time based on the graph of the rush hour fluctuation with traffic survey method. The field survey was conducted using hand tally counter. Based on the results of the study, obtained peak volume of 1370.16 smp / hour with a capacity value of 896.2 pcu / hour, the degree of saturation obtained by 0.654 where the condition is close to saturation.Keywords: Intersection, cycle time, signal phase, capacity, degree of saturation.
TINJAUAN PERENCANAAN GELAGAR BETON PRATEGANG PADA JEMBATAN BAKONGAN KECAMATAN PERMATA KABUPATEN BENAR MERIAH Ghali Hari
Portal: Jurnal Teknik Sipil Vol 8, No 2 (2016)
Publisher : Politeknik Negeri Lhokseumawe

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30811/portal.v8i2.609

Abstract

Bakongan bridge located in Bakongan village, Permata Subdistrict, Bener Meriah District. Based on the characteristics of the river, the bridge isplanned to Bakongan spans 13,6 meters long and 6 meters width. Girder longitudinal direction planned for the bridge is prestressed concrete girder type of post­ tension with the imposition of standard rules RSNI T-02-2005, RSNI T-12-2004 and Construction Manual 021/BM/201 J . Jn the early stages of planning done preliminary design to determine the dimensions of the main bridge, the calculation of the secondary structure are used as load analysis that occurs, the control voltage that occurs in the structure, post-tensile prestressing loss, sectional capacity, control deflection, and depiction. Quality of concrete used was Jc = 45 MPa, tendon used is seven strand wire with a diameter of  9,3 mm  inch diameter 51 mm shells tendon. Voltage tendonfpu = 1860 MPa, quality threaded steel reinforcement isfY = 320 MPa, and quality plain steel reinforcement isfY = 240 MPa. Moments that occur in the calculation  of girder 1502,0967 KNM combination III. Number of tendons obtained from the calculation is 5 to 35 pieces offruit on each strand tendons. Total loss of prestressing force obtained at 817,54 MPa or 34 %. Principal reinforcement used  Æ13 mm, Æ10-shear reinforcement used in the staging area 100 mm and g 10-600 mm in thefield area. Ultimate moment capacity of prestressed beams 3629664KN/m combination Ill of calculation. Greatest deflection is 0.0151 meters caused by a combination JV. Keywords: Concrete prestressed,  Post-tension girder, tendons, reinforcement
PERENCANAAN STRUKTUR RANGKA ATAS JEMBATAN RANGKA BAJA PADA GAMPONG LEUBOK PEMPENG KECAMATAN PEUREULAK KABUPATEN ACEH TIMUR Muhammad Ridha; Khairul Miswar
Portal: Jurnal Teknik Sipil Vol 8, No 2 (2016)
Publisher : Politeknik Negeri Lhokseumawe

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30811/portal.v8i2.605

Abstract

Steel frame bridge Gampong Leubok Pempeng districs Peureulak counties Aceh Timur is a connecting Leubok Pempeng village to Alue Batee village and others village in the peureulak districts with spans of 30 meters and width of 7 meters and including class B. This thesis aims to plan for building a bridge over a steel frame using a standard warren type which includea backrest, sidewalk, the vehicle floor plate, longitudinal girder, cross girder, main frame and bolt connection. To plan the loading bridge using RSNI T-02-2005 and steel structural design using RSNI T-03-2005, the calculation method using LRFD. Results obtained plannin backrest pipe diameter 48,6 mm, sidewalk of 25 cm thick reinfored concrete fc’ 25 Mpa, reinforced cocnrete slab 20 cm and the quality of steel profiles longitudinal girder using steel profiles H 350 x 175 x 7 x 11, cross girder using steel profiles H 488 xx 300  11 x 18. Top wind bracing using steel profiles H 125 x 125 x 6,9 x 9 and profiles L 125 x 125 x 12, while lower wind bracing using steel profiles L 125 x 125 x 12. Frame force calculated with matri method. Rods up, lower and diagonal using steel profiles H 300 x 300 x 10 x 15. Connecting bolts type A-325 diameter 1 inch and ½ inch. Longitudinal girder deflection is 3,130 mm 8,333 mm, cross girder deflections is 1,002 cm 2 cm and deflection in the main frame is 3,12 cm smaller than the allowable deflection 12,5 cm.Keyword : steel frame bridge, Matrix method
EVALUASI PENGENDALIAN BIAYA DAN WAKTU PADA PROYEK PEMBANGUNAN JALAN STRATEGIS MATANG SIJUEK-TRIENG PANTANG DENGAN MENGGUNAKAN METODE EARNED VALUE Alfian Alfian
Portal: Jurnal Teknik Sipil Vol 8, No 2 (2016)
Publisher : Politeknik Negeri Lhokseumawe

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30811/portal.v8i2.606

Abstract

Time and cost are important aspects in a construcrtion project to achieve a desired success of the project. One way to control cost and time is to use earned value analysis (return value) that informs the data against the cost and time accurately and clearly. The purpose is to evaluate the amount of cost and usage time has been used in the on road paving projects in the Idi city sub district idi rayeuk district east aceh. The method used in this study is the concept of the value of the result (earned value analysis) examines the tendency of schedule variance and cost variance at a period during the project. By conducting this study of earned value project completion with BCWP =Rp.253,429,607.35 BCWS = Rp. 897,091, 753.ll and ACWP = Rp. 306,453,335. 79. Judging from the cost variance (CV) 0, with cost performance index (CPI) l in order to get project completion cost of Rp6,564,l 33,232. While aspects of the project Schedule is extra time -29.2% or 31 weeks ahead ofplan indicated SPI value 1.Keywords : Cost, Performance, earned value, varians, index.
PERENCANAAN BIAYA DAN METODE PELAKSANAAN PADA JALAN PAMEU-GENTING GERBANG KABUPATEN ACEH TENGAH Faizal Bakrie
Portal: Jurnal Teknik Sipil Vol 8, No 2 (2016)
Publisher : Politeknik Negeri Lhokseumawe

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30811/portal.v8i2.608

Abstract

Cost Planning is planning a number of calculations necessary costs for material, labor, equipment and expenses related in implementation of the project Construction  and  Implementation  Method  road  is  a  basic  reference  in  the implementation of road construction by Standard Highways applied to the road Pameu- Genting Gate starting from the STA 45 + 850 s I d 49 + 500. Calculation of Budget Plan include Job Layers Base Down (LPB) Aggregate B, Works layer Piling Up (LPA) Aggregate A, (Prime Coat), Works Layer Binder AC-BC and Layer Aus AC-WC  (Surface). The method used is Estimation Method Index (E.l) Highways, 2010. From the calculation results obtained execution time of 166 working days,fee for Base Aggregate Base Layer B Amounting Rp.4. 032.876,00, -. Costs for Top Layer Aggregate Base A sum Rp.3.376.312,816.50, -. Fees for absorbing binder layer of Rp. 122,801,512.50, - Fees for Layers Between AC-BC (Surface) of Rp. 4. 732.319.951.10, - and the cost for AC-WC Aus layer Rp.2.331.857.250.00 So the sum total budget is of Rp. 14,752,380,906.00, - the value added tax (VAT) of 10% as well as the scheduling of the execution time using the S curve. and the method of implementation applied to the project include Job Layers Base Down Aggregate B, Layer Piling Up Aggregate A, (Prime Coat), Layer Binder AC-BC and and the cost for AC-WC (Surface) with a systematic way, accuracy, effective and efficient based on the plans.Keywords: Budget Plan, S curve, and Methods of Implementation

Page 1 of 1 | Total Record : 6