cover
Contact Name
Aswar Amiruddin
Contact Email
aswaramir89@gmail.com
Phone
+6287704518570
Journal Mail Official
bejts@borneo.ac.id
Editorial Address
Jl. Amal Lama No 1, Tarakan 77115, Indonesia
Location
Kota tarakan,
Kalimantan utara
INDONESIA
Borneo Engineering: Jurnal Teknik Sipil
ISSN : 25811134     EISSN : 26857553     DOI : https://doi.org/10.35334/be.v9i3
Core Subject : Engineering,
Focus and Scope Borneo Engineering : Structural Engineering, Transportation Engineering, Water Resources, Geotechnical Engineering and Construction Management
Articles 11 Documents
Search results for , issue "Volume 4 Nomor 1 Tahun 2020" : 11 Documents clear
Analisis Pengadaan Barang dan Jasa Konstruksi Menurut Perpres 70/2012 Terhadap Perpres 4/2015 Okma yendri; Desi Qomariah
Borneo Engineering : Jurnal Teknik Sipil Volume 4 Nomor 1 Tahun 2020
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Borneo Tarakan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35334/be.v4i1.1093

Abstract

The construction sector has an important role in economic growth. To realize a condition that all necessary infrastructure that can guarantee an increase in economic activity. Procurement will be infrastructure and infrastructure by the government, using the budget of revenues and expenditures (APBN / APBD). To oversee the use of the budget, must arrange the procurement rules which the regulation amended by Presidential Decree 70/2012 and 4/2015. The tender process is expected to use the electronic media (e-procurement) to be more transparent, accountable, effective and efficient, in line with efforts to eradicate corruption, collusion and nepotism. The research method uses descriptive research. The sampling technique used purposive sampling with data taken from LPSE Musi Rawas and questionnaires to respondents as service providers, service users, and the auction committee. A descriptive analysis of data processing and data processing using a Likert scale questionnaire on the subject of the study variables The results of a comparative analysis of the construction tender based on Presidential Decree 4/2015 is the same as the Presidential Decree 70/2012. It's just that there is a difference in the duration of time the activity evaluation of the Proposal, namely the regulation 70/2012 is 4 days while on the regulation 4/2015 is 11 days. The duration of time on activities Sanggah Auction Results period is 4 days while the Presidential regulation 70/2012 4/2015 is 6 days.

Page 2 of 2 | Total Record : 11