cover
Contact Name
Widodo Kushartomo
Contact Email
widodokushartomo@gmail.com
Phone
+628176869150
Journal Mail Official
jmts@untar.ac.id
Editorial Address
Jl. Letjen S. Parman No. 1, Jakarta 11440
Location
Kota adm. jakarta barat,
Dki jakarta
INDONESIA
JMTS: Jurnal Mitra Teknik Sipil
ISSN : -     EISSN : 2622545X     DOI : http://dx.doi.org/10.24912/jmts
Core Subject : Engineering,
JMTS: Jurnal Mitra Teknik Sipil dikelola oleh Program Studi Sarjana Teknik Sipil, Fakultas Teknik, Universitas Tarumanagara. JMTS: Jurnal Mitra Teknik Sipil merupakan media publikasi hasil penelitian dan studi ilmiah dalam bidang Teknik Sipil yang diterbitkan 4 kali dalam setahun, yaitu pada bulan Februari, Mei, Agustus, dan November. Jurnal ini terbit pertama kali pada 1 Agustus 2018.
Articles 22 Documents
Search results for , issue "Volume 3, Nomor 1, Februari 2020" : 22 Documents clear
ANALISIS KORELASI PERSENTASE BIAYA CHANGE ORDER TERHADAP BOBOT PEKERJAAN PADA DUA PROYEK PERKERASAN JALAN KAKU Ronaldo Filemon; Mega Waty
JMTS: Jurnal Mitra Teknik Sipil Volume 3, Nomor 1, Februari 2020
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v3i1.6931

Abstract

Change order often occurs in the world of construction. Change order is work that is added to or deleted from the original scope of work of a contract and approved by the parties involved. The impact from the change order tend to hurts various parties. The scale of change order can be calculate using Change Order Ratio (COR), Change Order Ratio in Addiditon (CORA) dan Change Order Ratio in Substraction (CORS) formulas. This study examine 2 projects. The two projects are rigid road pavement projects. Project 1 cost increase and project 2 cost doesn’t increase or decrease. The output of pearson correlation between CORA and value of work of project 1 and project 2 shows a significant correlation and a strong of a linear relationship. The output of pearson correlation between CORS and value of work of project 1 shows no sign of correlation between the variabels but the output of pearson correlation between CORS and value of work of project 2 shows a significant correlation and a strong of a linear relationship.AbstrakChange order sangat sering terjadi pada dunia konstruksi. Change order adalah pekerjaan yang mengalami perubahan penambahan atau pengurangan pekerjaan dari kontrak awal yang disepakati oleh pihak yang bersangkutan. Dampak dari change order cenderung merugikan berbagai pihak. Besaran change order dapat dihitung dengan rumus Change Order Ratio (COR), Change Order Ratio in Addiditon (CORA) dan Change Order Ratio in Substraction (CORS). Terdapat 2 proyek perkerasan jalan kaku. Proyek 1 mengalami penambahan biaya dan proyek 2 tidak mengalami penambahan atau pengurangan biaya. Hasil korelasi pearson antara CORA dan bobot pekerjaan proyek 1 dan proyek 2 menyatakan korelasi yang signifkan dan hubungan yang kuat. Hasil korelasi pearson antara CORS dan bobot pekerjaan proyek 1 menyatakan tidak ada korelasi antara keduanya tetapi Hasil korelasi pearson antara CORA dan bobot pekerjaan proyek 2 menyatakan korelasi yang signifkan dan hubungan yang kuat
DAMPAK CHANGE ORDER PADA PROYEK PERKERASAN JALAN Alexander Junius; Mega Waty
JMTS: Jurnal Mitra Teknik Sipil Volume 3, Nomor 1, Februari 2020
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v3i1.7023

Abstract

In a construction project, changes during the construction period are common. This change can be in the form of an increase or decrease in volume and type of work, changes in work specifications, or changes in the schedule for implementation. Changes in projects are often known as change orders. Change orders must be approved by all parties in a project namely, contractors, owners, and consultants. Change orders are caused by several factors such as changes in design, delays in procurement of goods, differences in field conditions, and others. The impact of this change order is felt by all parties involved in a project, but the change order has a different impact on each party involved. This study aims to determine the biggest impact of change orders from the contractor. In the questionnaire submitted the impact of change order is divided into several variables namely, the cost of quality, time, organization, and others. From the responses of respondents regarding the impact of change orders on road construction projects, an analysis was performed with the calculation of the Relative Importance Index (RII), and the biggest impact was obtained. Before the data is processed with RII, the validity and reliability tests are performed first. The biggest impact of change orders caused by change orders is that change orders increase the budget for contractors, change orders increase overhead costs, increase project duration, cause project costs overruns, and change orders cause a decrease in project profits. AbstrakPada suatu proyek konstruksi, perubahan selama masa konstruksi merupakan hal yang umum terjadi. Perubahan ini bisa berupa penambahan atau pengurangan volume dan jenis pekerjaan, perubahan spesifikasi pekerjaan, maupun perubahan jadwal pelakasnaan. Perubahan dalam proyek sering dikenal change order. Change order harus disetujui oleh semua pihak yang ada dalam suatu proyek, yaitu kontraktor, pemilik, dan konsultan. Change order disebabkan oleh beberapa faktor seperti perubahan desain, keterlambatan pengadaan barang, perbedaan kondisi lapangan, dan lain-lain. Dampak dari change order ini dirasakan seluruh pihak yang terlibat dalam suatu proyek, namun change order menimbulkan dampak yang berbeda pada tiap pihak yang terlibat. Penelitian ini bertujuan untuk mengetahui dampak change order terbesar dari pihak kontraktor. Dalam kuesioner yang diajukan dampak change order dibagi menjadi beberapa variabel yaitu, biaya mutu, waktu, organisasi, dan lainnya. Dari hasil tanggapan responden mengenai dampak change order pada proyek konstruksi jalan, dilakukan analisis dengan perhitungan Relative Importance Index (RII), dan didapat dampak terbesar. Sebelum data diolah dengan RII dilakukan uji validitas dan uji reliabilitas terlebih dahulu. Dampak change order terbesar yang ditimbulkan oleh change order adalah change order menambah anggaran untuk kontraktor, change order meningkatkan biaya overhead, menambah durasi proyek, menyebabkan biaya proyek membengkak, dan change order menyebabkan penurunan keuntungan proyek.