IDENTIFIKASI FAKTOR PENYEBAB COST OVERRUN (PEMBENGKAKAN BIAYA) PADA PROYEK RUMAH TINGGAL Jason Christopher; Mega Waty
JMTS: Jurnal Mitra Teknik Sipil VOLUME 4, NOMOR 3, AGUSTUS 2021
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v0i0.12502

Abstract

ABSTRACTThe advancement of the construction sector has made the complexity of a project increase in line with the increasing demands on construction engineers to complete a project on time, in accordance with cost, and prioritize quality. From that statement, a cost overrun problem shows in the process of running the project. Several techniques have been espoused by innovative organizational and managerial practices to reduce the risk of cost overrun from the construction project, but cost overrun in project construction remain as a one of the problem. This study aims to identify the factors that cause cost overrun in residential projects. The process of data collection was carried out using a questionnaire as the instrument. The data from the questionnaire is primary data that will be processed with the help of IBM SPSS 25 software. The identification of the factors causing the cost overrun using the relative important index (RII) method to determine the level of importance of each variable. The results of this study indicate that the project data and information are incomplete (when aanwijzing) and the erroneous estimation of material costs and wages are the main factors causing cost overrun with an RII value ≥ 0,9. ABSTRAK  Majunya sektor pekerjaan konstruksi membuat kompleksitas suatu proyek semakin meningkat sejalan dengan meningkatnya tuntutan kepada pelaku konstruksi untuk menyelesaikan proyek secara tepat waktu, sesuai dengan biaya, dan mengendepankan kualitas. Dari tuntutan tersebut, timbul suatu masalah cost overrun (pembengkakan biaya) dalam proses berjalannya proyek. Berbagai upaya telah dilakukan oleh berbagai organisasi mandiri dan praktisi manajemen untuk mengurangi risiko dari adanya cost overrun (pembengkakan biaya) pada suatu proyek, namun masalah cost overrun tetap menjadi salah satu problema dalam proyek konstruksi. Penelitian ini bertujuan untuk mengidentifikasi faktor-faktor penyebab terjadinya cost overrun (pembengkakan biaya) pada proyek rumah tinggal. Proses pengumpulan data dilakukan dengan menggunakan kuesioner sebagai instrumennya. Data dari kuesioner tersebut merupakan data primer yang akan diolah dengan bantuan software IBM SPSS 25. Pengidentifikasian faktor-faktor penyebab terjadinya cost overrun menggunakan metode relative importance index (RII) untuk menentukan tingkat kepentingan setiap variabel. Hasil dari penelitian ini menunjukaan bahwa data dan informasi proyek kurang lengkap (saat aanwijzing) dan perencanaan estimasi biaya material dan upah yang keliru menjadi faktor paling utama penyebab cost overrun dengan nilai RII ≥ 0,9.
ANALISIS KORELASI BIAYA CHANGE ORDER TERHADAP BOBOT PEKERJAAN PADA DUA PROYEK JALAN ASPAL PROVINSI BANTEN Dominicus Edwin; Mega Waty
JMTS: Jurnal Mitra Teknik Sipil Volume 3, Nomor 1, Februari 2020
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v3i1.6965

Abstract

In every project, one thing that often happens is a change order. Change order is a change of work after the contract is signed by the owner and contractor. These changes can occur at the beginning, middle, or in construction projects. To minimize change orders, a change order correlation analysis can be done using the original data, with the parameters change order ratio in addition (CORA) and change order ratio in substraction (CORS). The data used in this study uses two original change order contract data on projects in Banten Province. This study produced 4 correlation results obtained from Pearson correlation in the SPSS program. The results of the correlation of the weight of each work to CORA on project 1 did not show any correlation. The results of the correlation of weights for each work with CORA project 2 and the results of the correlation of weights with CORS project 2 showed a significant correlation at the 95% degree of confidence. The results of the correlation of the weight of each work with CORS project 1 showed a very significant correlation at the 99% degree of confidence.AbstrakDalam setiap proyek, salah satu hal yang sering terjadi ialah change order. Change order adalah perubahan pekerjaan setelah kontrak yang ditandatangani oleh pemilik dan kontraktor. Perubahan itu dapat terjadi pada awal, tengah, ataupun pada dalam proyek konstruksi. Untuk meminimalisir change order maka dapat dilakukan analisis korelasi change order menggunakan data asli, dengan parameter change order ratio in addition (CORA) dan change order ratio in substraction (CORS). Data yang digunakan pada studi ini menggunakan dua data asli kontrak change order pada proyek konstruksi jalan aspal di Provinsi Banten. Baik data proyek 1 maupun data proyek 2 memiliki data kontrak change order biaya awal dan data biaya setelah terjadinya change order. Studi ini menghasilkan 4 hasil korelasi yang di dapat dari korelasi pearson pada program SPSS. Hasil korelasi bobot tiap pekerjaan terhadap CORA pada proyek 1 tidak menunjukan adanya korelasi. Hasil korelasi bobot tiap pekerjaan dengan CORA proyek 2 dan hasil korelasi bobot dengan CORS proyek 2 menunjukan adanya korelasi yang signifikan pada tingkat derajat kepercayaan 95%. Hasil korelasi bobot tiap pekerjaan dengan CORS proyek 1 menunjukan adanya korelasi yang sangat signifikan pada tingkat derajat kepercayaan 99%.
PENERAPAN METODE VALUE ENGINEERING DALAM PEMILIHAN JENIS BETON PADA PROYEK KONSTRUKSI PERUMAHAN Juan Aditya Kencana; Mega Waty
JMTS: Jurnal Mitra Teknik Sipil Volume 4, Nomor 1, Februari 2021
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v0i0.10408

Abstract

Value engineering is a technique to provide the necessary functions of a component or product at the lowest cost while meeting the specifications of quality, performance, and reliability. Development in the housing construction sector must be carried out as efficiently as possible by considering various factors. One of the most affecting factors is the selection of concrete types. The research was conducted on one of the housing projects located in Bumi Serpong Damai to know the most important criteria and the best alternative in selecting concrete types for housing projects. The criteria used are price, time, quality, ease of implementation, availability of tools and materials, technology, and concrete bearing capacity. Simultaneously, the alternatives reviewed are conventional concrete, ready mix concrete, and precast concrete. Research data in the form of questionnaires with the Saaty scale is analyzed by value engineering method with the Expert Choice program's help. Based on the analysis results, the most important criteria in selecting concrete types for residential projects are the quality of concrete with an eigen vector value of 31.1% and the best alternative was precast concrete with an eigen vector value of 47.8%.ABSTRAK  Value engineering adalah suatu teknik untuk memberikan fungsi yang diperlukan dari suatu komponen atau produk dengan biaya terendah sekaligus memenuhi spesifikasi kualitas, kinerja, dan keandalan. Pembangunan dibidang konstruksi perumahan dituntut untuk dilaksanakan seefisien mungkin dengan mempertimbangkan berbagai faktor yang ada. Salah satu faktor yang paling mempengaruhi yaitu pemilihan jenis beton. Penelitian dilakukan pada salah satu proyek perumahan yang terletak di Bumi Serpong Damai dengan tujuan mengetahui kriteria terpenting dan alternatif terbaik dalam pemilihan jenis beton untuk proyek perumahan. Kriteria yang digunakan adalah harga, waktu, kualitas, kemudahan pelaksanaan, ketersediaan alat dan material, teknologi, dan daya dukung beton, sedangkan alternatif yang ditinjau adalah beton konvensional, beton ready mix, dan beton pracetak / precast. Data penelitian berupa kuisioner dengan skala Saaty dianalisis dengan metode value engineering dengan bantuan program Expert Choice. Berdasarkan hasil analisis didapati kriteria terpenting dalam pemilihan jenis beton untuk proyek perumahan adalah kualitas beton dengan nilai eigen vector sebesar 31,1% dan alternatif terbaik berupa beton pracetak / precast dengan nilai eigen vector sebesar 47,8%.
ANALISIS PENERAPAN SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA PADA PEMBANGUNAN GEDUNG DAN PERUMAHAN Steven Steven; Mega Waty
JMTS: Jurnal Mitra Teknik Sipil Volume 3, Nomor 3, Agustus 2020
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v3i3.8324

Abstract

Indonesia as a developing country in the Asian region is a country that has a lot of development. Occupational safety and health management systems are part of an organization's management system that is used to develop and implement Occupational safety and health policies and manage risks. In this study, researchers will discuss the application of occupational safety and health management systems and supporting facilities for occupational safety and health management systems applied by construction companies to the construction of high rise buildings and housing developments. The method used to determine the successful implementation of the Occupational Safety and Health Management System is to use quantitative methods and Univariate analysis. Later the results of the percentage calculation will be compared with Minister of Public Works Regulation No.9 / 2008 concerning Management and Work Safety Systems. Application of Occupational Safety and Health Management System in high rise buildings is 97% (Good), and for housing is 35% (less). The supporting facilities in the high rise building project are 88% (Good) and 40% (less) for housing.ABSTRAKIndonesia sebagai salah satu negara berkembang di kawasan Asia merupakan negara yang banyak melakukan pembangunan. Sistem manajemen keselamatan dan kesehatan kerja merupakan bagian dari sistem manajemen organisasi yang digunakan untuk mengembangkan dan menerapkan kebijakan keselamatan dan kesehatan kerja dan mengelola risiko. Dalam penelitian ini, peneliti akan membahas penerapan sistem manajemen keselamatan dan kesehatan kerja dan fasilitas pendukung sistem manajemen keselamatan dan kesehatan kerja yang diterapkan perusahaan konstruksi terhadap pembangunan gedung bertingkat dan pembangunan perumahan. Metode yang digunakan untuk mengetahui keberhasilan penerapan Sistem Manajemen Keselamatan dan Kesehatan Kerja adalah dengan menggunakan metode kuantitatif dan analisis Univariat. Kemudian hasil perhitungan persentase tersebut akan dibandingkan dengan Peraturan Menteri PU No.9/2008 tentang Sistem Manajemen dan Keselamatan Kerja. Penerapan Sistem Manajemen Keselamatan dan Kesehatan Kerja pada gedung bertingkat didapat 97% (Baik), dan untuk perumahan didapat 35% (kurang). Fasilitas pendukung yang ada pada proyek gedung bertingkat didapat 88% (Baik) dan untuk perumahan didapat 40% (kurang).
PENYEBAB TERJADINYA SISA MATERIAL PADA BANGUNAN GEDUNG SUPERMARKET Kristoforus Gregorius; Mega Waty
JMTS: Jurnal Mitra Teknik Sipil Volume 5, Nomor 1, Februari 2022
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v5i1.16648

Abstract

ABSTRACTThe rest of the material in the construction can be interpreted as a loss or loss of material resources, time (taking into account labor and equipment), and also capital, this is caused by activities that require costs, either directly or indirectly, but do not add up at all. value in construction service products. The purpose of this study is to find the most dominant residual value and the cause of the residual material that occurs. This study uses the Pareto diagram method in processing real data obtained from the IKEA building construction project located in Jakarta Garden City and also using the Relative Importance Index (RII) method with a significance level of 5% and assisted by the application of Statistical Product and Service Solutions (SPSS) to test and calculate data. Material data consists of 44 items waste material. From all the data obtained, it can be concluded that the largest residual value of the material is the steel structure and the most dominant cause is design changes.ABSTRAKSisa material dalam konstruksi dapat kita artikan sebagai kehilangan atau kehilangan sumber daya materi, waktu (dengan memperhatikan tenaga kerja dan peralatan), dan juga modal, hal ini disebabkan oleh aktivitas yang memerlukan biaya, baik secara langsung maupun tidak langsung, tetapi sama sekali tidak menambahkan nilai pada produk jasa konstruksi. Tujuan dari penelitian ini adalah mencari nilai sisa yang paling dominan serta penyebab terjadinya sisa material yang terjadi. Penelitian ini menggunakan metode diagram pareto dalam mengolah data riil yang didapat dari proyek pembangunan gedung IKEA yang berlokasi di Jakarta Garden City dan juga menggunakan metode Relative Importance Index (RII) dengan taraf signifikansi 5% dan dibantu dengan aplikasi Statistical Product and Service Solutions (SPSS) untuk menguji dan menghitung data. Data material terdiri dari 44 item material sisa. Dari keseluruhan data yang diperoleh dapat ditarik kesimpulan bahwa nilai sisa material yang paling besar adalah steel structure dan penyebab yang paling dominan adalah perubahan desain. 
ANALISIS HUBUNGAN SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA TERHADAP TINGKAT KECELAKAAN PADA PROYEK Andi Lay Wirawan; Mega Waty
JMTS: Jurnal Mitra Teknik Sipil Volume 3, Nomor 4, November 2020
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v3i4.8365

Abstract

The construction industry in general can be categorized as activities that contain a lot of elements of danger and very risky for accidents. Occupational safety and health management system (SMK3) is the one of factors in a construction project. Implementation of “SMK3” needs to do to provide a good, safe and comfortable working environment, but it is also useful for avoiding work accidents. This study aims to determine the relationship between the factors of the application of “SMK3” to the level of accidents whether correlated or not, so we get the factors that apply the safety management system and work health which is most related to the accident rate. The research method used is quantitative descriptive method, namely by distributing questionnaires that have been prepared previously. Then the data processing is done with the help of an applied program to obtain the results of the validity test, reliability test, normality test and correlation results using the Pearson Product Moment method. The results of the Pearson Product Moment correlation analysis produced 14 variables that correlated with the accident rate with the most influential factor being the availability of danger signs on the project.ABSTRAKIndustri kontruksi pada umumnya dapat dikategorikan sebagai kegiatan yang banyak mengandung unsur bahaya dan sangat berisiko untuk terjadinya kecelakaan. Sistem manajemen keselamatan dan kesehatan kerja merupakan salah satu faktor utama dalam suatu pelaksanaan proyek konstruksi. Penerapan SMK3 perlu dilakukan untuk memberikan suasana lingkungan kerja yang baik, aman, dan nyaman, selain itu juga berguna untuk menghindari kecelakaan kerja. Penelitian ini memiliki tujuan mengetahui hubungan faktor penerapan sistem manajemen keselamatam dan kesehatan kerja terhadap tingkat kecelakaan apakah berkorelasi atau tidak, sehingga didapatkan faktor penerapan SMK3 yang paling berhubungan dengan tingkat kecelakaan. Metode penelitian yang digunakan adalah dengan metode diskriptif kuantitatif yaitu dengan penyebaran kuesioner yang sudah disiapkan sebelumnya. Lalu pengolahan data dilakukan dengan bantuan program terapan untuk didapatkan hasil uji validitas, uji reliabilitas, uji normalitas dan hasil korelasi dengan menggunakan metode pearson product moment. Hasil dari analisis korelasi pearson product moment menghasilkan 14 variabel yang berkorelasi terhadap tingkat kecelakaan dengan faktor yang paling berpengaruh adalah ketersediaan rambu-rambu tanda bahaya pada proyek.
PENYEBAB CHANGE ORDER PADA PROYEK PERKERASAN JALAN Philander Edward; Mega Waty
JMTS: Jurnal Mitra Teknik Sipil Volume 3, Nomor 1, Februari 2020
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v3i1.7012

Abstract

In the implementation of construction projects, there are several important elements that must be done well. so that the essential elements can be carried out well, then agreement regarding certain matters is agreed upon by the parties concerned which is called contract. Almost construction projects in Indonesia have experienced contract changes or can be called Change Order. Change Order is an event due to changes in a job that results in changes in time and cost during implementation. To solve the problem of Change order this contract can be finalized and anticipated by knowing the factors causing it in advance. The causal factors are arranged into a questionnaire to find out the main causes of Change Order. The questionnaire was distributed to contractors on the road project. Validity and reliability testing is done on the data obtained from the results of the questionnaire to obtain the consistency and stability of each question in the questionnaire. Valid and reliable question items are further analyzed using the RII method. To find out the main cause, the data is calculated using the RII. The results of the RII ranking technique show that the order acceleration schedule is the main cause of Change Order. AbstrakDalam pelaksanaan proyek konstruksi, terdapat beberapa unsur penting yang harus dilakukan dengan baik. agar unsur unsur penting dapat terlaksana dengan baik maka dibuatlah perjanjian/ kesepakatan antara dua orang atau lebih mengenai hal tertentu yang disetujui oleh pihak pihak yang bersangkutan yang terikat yang disebut kontrak. Hampir seluruh proyek konstruksi di Indonesia mengalami terjadinya perubahan kontrak atau dapat disebut Change Order. Change Order merupakan suatu kejadian akibat perubahan suatu pekerjaan yang mengakibatkan perubahan waktu dan biaya saat pelaksanaan. Untuk mengatasi masalah Change order/ addendum kontrak ini dapat diminalisir dan diantisipasi dengan mengetahui faktor penyebabnya terlebih dahulu. Faktor-faktor penyebab tersebut disusun menjadi sebuah kuesioner untuk mengetahui penyebab utama dari Change Order. Penyebaran kuesioner tersebut dilakukan terhadap kontraktor pada proyek jalan. Pengujian uji validitas dan uji reliabilitas dilakukan terhadap data yang diperoleh dari hasil kuesioner untuk memperoleh keakuratan konsistensi dan kestabilan setiap pertanyaan dalam kuesioner. Butir pertanyaan yang valid dan reliabel dianalisis lebih lanjut menggunakan metode RII. Untuk mengetahui penyebab utama, data dihitung menggunakan teknik ranking RII (Relative Importance Index). Hasil dari teknik ranking RII menunjukan bahwa perintah percepatan jadwal merupakan faktor penyebab utama terjadinya Change Order.
PENYEBAB CHANGE ORDER PADA PROYEK KONSTRUKSI BANGUNAN AIR WILAYAH DKI JAKARTA Ivana Ramayanti Hendratno Putri; Mega Waty
JMTS: Jurnal Mitra Teknik Sipil Volume 4, Nomor 1, Februari 2021
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v0i0.10289

Abstract

Change orders are proposals for additional / less work where the main work does not follow the initial design or there are new proposals for new work at all (Pusat Pendidikan dan Pelatihan Sumber Daya Air dan Konstruksi, 2017). A contract or agreement has been signed before implementing the project, but changes often occur after and greatly affect the project performance. This change is also needed to be known if it occurs in a water construction project. To control change orders and contract changes, it is necessary to know the causing factors. This study aims to determine these causative factors by compiling a questionnaire distributed to workers in the water construction sector in the area of DKI Jakarta. The questionnaire results were tested for validity and reliability and Ranked by RII (Relative Importance Index) method. With the acquisition of RII above 0.51, the results found that coordination with utility systems (RII 0, 6842), is the main contributing factor to the Change Order in the construction of DKI Jakarta water buildings. ABSTRAKChange order adalah usulan pekerjaan tambah/kurang dimana pekerjaan utama tidak mengikuti desain awal atau terdapat usulan pekerjaan baru sama sekali(Pusat Pendidikan dan Pelatihan Sumber Daya Air dan Konstruksi, 2017). Sebelum pelaksanaan proyek, pihak yang terlibat dalam konstruksi telah menandatangani kontrak atau kesepakatan. Dalam pelaksanaannya, setelah penandatanagnan kontrak seringkali terjadi perubahan-perubahan. Perubahan sangat berpengaruh pada kinerja proyek, perubahan ini juga perlu diketahui terjadi atau tidaknya dalam proyek konstruksi air. Jika perubahan dalam proyek terjadi pada proyek konstruksi air, untuk mengendalikan perintah perubahan maupun perubahan kontrak diperlukan pengetahuan faktor penyebab terjadinya perubahan. Penelitian ini bertujuan untuk mengetahui faktor penyebab dengan penyusunan kuesioner yang disebarkan terhadap pekerja bidang konstruksi air wilayah cakupan DKI Jakarta. Setelah dilakukan uji validitas dan reliabilitas, hasil kuesioner akan diurutkan berdasar tingkat kepentingan dengan metode RII. Dengan perolehan RII diatas 0,51, hasil yang ditemukan bahwa pengkoordinasian dengan sistem utilitas (RII 0, 6842), merupakan faktor penyebab utama Change Order pada konstruksi bangunan air DKI Jakarta.
ANALISIS PERANAN KONSULTAN MANAJEMEN KONSTRUKSI DALAM MENCEGAH KETERLAMBATAN WAKTU KONSTRUKSI Albert Darmali; Mega Waty
JMTS: Jurnal Mitra Teknik Sipil Volume 5, Nomor 1, Februari 2022
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v5i1.16651

Abstract

ABSTRAK Seorang konsultan manajemen konstruksi berperan sebagai penasehat, pembantu, dan partner. Keterlibatan konsultan manajemen konstruksi diharapkan dapat memberikan informasi terpercaya kepada pemilik proyek. Pemakaian jasa konsultan manajemen konstruksi umunya digunakan pada proyek yang memiliki skala besar, dimana konsultan manajemen konstruksi memiliki peran dalam mengelola manajemen proyek. Macam-macam permasalahan pada tahap pelaksanaan pembangunan proyek sering terjadi. Salah satu permasalahan yang secara umum terjadi ialah keterlambatan waktu konstruksi yang menyebabkan suatu proyek konstruksi tidak selesai sesuai dengan waktu yang telah dijadwalkan. Faktor yang memicu terjadinya keterlambatan adalah: struktur organisasi proyek yang tidak beraturan, sdm yang tidak profesional ataupun kendala alam. Maka dari itu, sangat dibutuhkan peninjauan apa saja peranan konsultan manajemen konstruksi dan bagaimana implementasi peranan tsb dalam mencegah keterlambatan konstruksi. Tujuan penelitian untuk mengetahui pengaruh peranan Konsultan Manajemen Konstruksi dalam mencegah keterlambatan waktu konstruksi pada pembangunan proyek konstruksi gedumg bertingkat. Dalam pelaksanaan penelitian disusun suatu lingkup perencanaan yang meliputi: studi literatur, persiapan menentukan data yang diperlukan, pengambilan data primer langsung dari objek yang diteliti dengan penyebaran kuisioner. Setelah itu hasil dari kuesioner tersebut diolah dengan metodePLS untuk mengetahui pengaruh peranan konsultan manajemen konstruksi dalam mencegah keterlambatan konstruksi pada pembangunan gedung bertingkat dan peranan nya yang paling dominan.Kata Kunci: Konsultan Manajemen Konstruksi Peranan, Keterlambatan Waktu Konstruksi, Proyek         Konstruksi gedung bertingkat     ABSTRACT Construction management consultants are advisors, assistants and partners. The involvement of construction management consultants is expected to provide reliable information to project owners. The use of construction management consultant services is usually only on large-scale projects,. Various problems at the implementation stage of development often occur. One of the problems that often occurs is the delay in construction time which causes a construction project to not be completed according to the scheduled time. The factors include: unorganized project organization, unprofessional human resources. Therefore, it is necessary to review what the role of a construction management consultant is and how to implement that role in preventing construction delays. The purpose of the study was to determine the role of Construction Management Consultants in preventing construction delays. In carrying out the research, a planning scope was developed which included: literature study, preparation of determining the required data, retrieval of primary data directly from the object under study by distributing questionnaires. After that the results of the questionnaire were processed by thePLS method to find out the influence of the role of construction management consultants in preventing construction delays in the construction of multi-storey buildings and their most dominant role. Keywords: Construction Management Consultant,Role,Construction Time Delay,High-RisenBuilding Construction Project
FAKTOR-FAKTOR YANG MEMPENGARUHI PRODUKTIVITAS TENAGA KERJA PADA BANGUNAN HIGH RISE DI REPUBLIK INDONESIA Theodorus Alvin Satrya; Mega Waty
JMTS: Jurnal Mitra Teknik Sipil Volume 3, Nomor 4, November 2020
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v3i4.8366

Abstract

Developments in construction industry are growing rapidly, making it more competitive among contractors. Factors like cost, financial status, enviromental and quality control, safety management, project team and trained labor become a consideration for choosing a contractor to do certain project. The labor itself consuming almost 30 until 50 percent of total project’s cost. Labor its very closely related to productivity where the lower productivity rate, the more chance delay will occur. The purpose of this research is to identify factors that affecting labor productivity at high rise building construction. The Methodology of this research is survey where the corespondents are who currently working or had been working as staff at high rise construction. After that, the result of the survey being tested for validity and reliability. After the validity and reliability test, these factors are being ranked to see what is the strongest factor that affecting labor productivity. There are 23 factors that affecting labor productivity and these factors comes from 4 main group factor which is Management, Technical factor, the labor, and external factor. From these 4 group, management group factor is the most affecting labor productivity and supervision of the worker is the most affecting labor productivity. ABSTRAKDewasa ini, perkembangan pada dunia konstruksi kian pesat serta persaingan antar kontraktor semakin ketat. Faktor-faktor seperti biaya, status keuangan, pengendalian lingkungan, manajemen mutu, manajemen keamanan, project team, dan para tenaga kerja yang terlatih menjadi pertimbangan penting saat pemberian tugas ke kontraktor. Tenaga kerja sendiri menyumbang biaya sebesar 30% sampai dengan 50% dari nilai total proyek dan tenaga kerja erat kaitannya dengan produktivitas dimana semakin rendah produktivitas tenaga kerja maka semakin besar peluang terjadi keterlambatan pada pekerjaan. Tujuan dari penelitian ini yaitu mengidentifikasi faktor-faktor apa saja yang mempengaruhi produktivitas tenaga kerja pada bangunan High Rise di Republik Indonesia. Metode penelitian ini menggunakan metode survey dimana kuesioner ditujukan kepada staff yang pernah bekerja di proyek bangunan High Rise di Republik Indonesia. Setelah itu hasil survey akan diuji validitas dan uji reliabilitas lalu terakhir dilakukan pemberian peringkat pada faktor-faktor yang mempengaruhi produktivitas tenaga kerja. Terdapat 23 faktor yang mempengaruhi produktivitas tenaga kerja dimana faktor-faktor ini merupakan bagian dari 4 Grup faktor yaitu faktor manajemen, faktor teknis, faktor tenaga kerja, dan faktor eksternal. Dari ke-empat grup faktor ini, yang paling mempengaruhi yaitu Grup Faktor Manajemen dan dari 23 faktor yang paling mempengaruhi yaitu pengawasan/supervisi terhadap tenaga kerja.