cover
Contact Name
Muhammad Subchan
Contact Email
-
Phone
+6285266237892
Journal Mail Official
civronlit.unbari@gmail.com
Editorial Address
Jl. Slamet Ryadi, Broni-Jambi, Kodepos: 36122
Location
Kota jambi,
Jambi
INDONESIA
Jurnal Civronlit Unbari
ISSN : -     EISSN : 25487302     DOI : http://dx.doi.org/10.33087/civronlit
Core Subject : Engineering,
Jurnal Civronlit Unbari is a scientific journal published regularly twice a year in April and October by Fakultas Teknik Universitas Batanghari (Faculty of Engineering, Batanghari University). Jurnal Civronlit Unbari is published media for research results of engineering field. These results are published in such an original scientific article and a review. Submitted manuscript must be original, no plagiarism and unpublished. Manuscript is submitted online via Open Journal System (OJS), must follow author guideline and writting template. All submission will be blind reviewed by qualified reviewers in their field.
Articles 6 Documents
Search results for , issue "Vol 8, No 1 (2023): April" : 6 Documents clear
Optimalisasi Rute Truk dalam Proses Pendistribusian Produk Biskuit dan Snack dengan Algoritma Nearest Neihbour dan Neirest Insertion: Studi Kasus PT Siantar Top Tbk. Medan Nisha Zahara; Resista Vikaliana
Jurnal Civronlit Unbari Vol 8, No 1 (2023): April
Publisher : Universitas Batanghari

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/civronlit.v8i1.105

Abstract

PT Siantar Top Tbk. Medan is a company engaged in the business of snacks in the form of biscuits and snacks. The existence of the Covid-19 pandemic has caused paralysis of almost all human activities which have an impact on a lot of work being done remotely or WFH which can trigger one's boredom in doing some work and thinking about consuming snacks. So the demand for snacks also increases. Of course this is a great opportunity for the company to increase revenue. The increase in demand must also be followed by a good and optimal distribution system. This study aims to determine the truck route in the distribution process of biscuit and snack products. This research was completed by using the Nearest Neighbor and Nearest Insertion methods which will then be compared between the company's initial route and the routing results route by considering the vehicle capacity both in terms of distance traveled and shipping costs. Based on the routing results, it is found that the route with the Nearest Neighbor method is the same as the Nearest Insertion method, namely the total distance generated is 3,360.8 km or with a distance savings presentation of 38.88%. These results greatly affect the shipping costs incurred by the company, namely from Rp. 5. 918,997,- to Rp. 3,527,301,-. So it can be concluded that the company's distribution route that was previously used needs to be improved. The repair can use both methods because the result is the same.
Kajian Pengaruh Pelebaran Sungai terhadap Debit Aliran Ryan Prayogi; Azwarman Azwarman; Susiana Susiana
Jurnal Civronlit Unbari Vol 8, No 1 (2023): April
Publisher : Universitas Batanghari

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/civronlit.v8i1.110

Abstract

Flood is one of the problems that often occurs in Indonesia. In Jambi City, every rainy season often experiences flooding, especially in Jambi City or the Garuda III Jaya Complex area, Bagan Pete Village, Jambi City. Thus, this study aims to determine how much rainfall intensity is on the Kenali Besar River and how much river flood discharge has been carried out at Komplek.Perum Garuda III Jaya, Bagan Bete Village, Jambi City with a time of 10 years and so that later the Kenali Besar River channel can be channeled. can function optimally to reduce flooding that occurs in the Garuda III Jaya Complex area, Bagan Pete Village, Jambi City, so that a good and quality river is created while taking into account the safety and comfort factors for the surrounding community. In this study, the data used were secondary data in the form of daily rainfall for 10 years and cross-sectional dimension data of the Kenali Besar River Komplek.Perum Garuda III Jaya, Bagan Pete Village. The results of the calculation of the planned rain with a return period of 10 years is 246.469 mm⁄hour, while the planned discharge using the Rational method obtained a peak discharge value of 30.833 m3⁄seconds the step is continued using HEC-RAS 5.0.7 software to determine the capacity of the drainage channel by using plan debit. After being analyzed using software.
Pemanfaatan Sisa Kulit Kayu sebagai Karbon Aktif dalam Pengolahan Air Lindi Industri Pulp and Paper Rifqi Sufra; Latifah Latifah; Nurul Ajeng Susilo; Endi Adriansyah; Luki Anugrah Wati; Astri Yulia; M. Syaiful; Hariestya Viareco; Marhadi Marhadi; Muhammad Abdul Ghony; Peppy Herawati
Jurnal Civronlit Unbari Vol 8, No 1 (2023): April
Publisher : Universitas Batanghari

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/civronlit.v8i1.106

Abstract

The pulp and paper industry produces the remaining bark as solid waste, where this solid waste pile when it rains will produce leachate that seeps into the ground, causing soil and groundwater pollution. This wood waste can be used as activated carbon (adsorbent) for leachate treatment. The research was divided into two stages, namely adsorbent production and leachate treatment. Production of activated carbon from bark (bark) was activated using a solution of NaOH and H2SO4 as an activator, with variations of bark (gr): activator (ml) = 20:100; 50:200; 70:300. The leachate adsorption process used activated carbon with a mass of 2.5 and 5 g for 30, 60 and 120 minutes. The lowest adsorbent water content was 0.87% activated using NaOH, and the lowest ash content 0.79% when activated with H2SO4. This is still in accordance with the SII standard No.0258-88. The best variation occurred when the addition of activated carbon which was activated using 5 grams of H2SO4 for 120 minutes caused the most significant decrease in COD value of 52%, and pH 7.32. From the variations in the activation of activated carbon adsorbents, the activation of acidic solutions is better in leachate treatment.
Investigasi Visual Kelayakan Bangunan Publik di Desa Jamblang Deni Randito Siallagan; Achmad Aprizal Ghozali; Bagus Tri Andana; Cindrawaty Lesmana; Cintiya Dewanti Santoputri; Latifah Nur Azizah; Dave Vian Nurzaqi; Mohamad Nurfian Rachmat; Krismanto Kusbiantoro; Leonardo Leonardo; Ferlina Sugata
Jurnal Civronlit Unbari Vol 8, No 1 (2023): April
Publisher : Universitas Batanghari

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/civronlit.v8i1.107

Abstract

Many functional old buildings and geological condition in Indonesia are prone to disasters, hence, the investigation is needed whether those buildings are still feasible to use. Periodic inspection is one of the methods to review the buildings by standard provisions. In this study, a survey was carried out based on Permen PU No. 16/RTM/2010 and Rapid Visual Screening (FEMA P-154). Both methods were used a special form that investigates the building visually. The purpose of the study was to investigate the existing building by reviewing the damage level of building components from the structural, architectural, mechanical, and electrical aspects, as well as to seismic hazards. Based on the Minister of Public Works Regulation Number 16/RTM/2010, the results show that there are several weathered wood columns and beams, cracked walls, and many piping and electrical that are no longer functioning. Based on Rapid Visual Screening (FEMA P-154), the final value of form level 2 is 0,2 which is similar with the SMin value, which indicating that the condition of the meeting building in Jamblang Village is categorized as prone to seismic hazards, therefore, the structure strengthening is required.
Analisis Tingkat Kerusakan Jalan Perkerasan Lentur Dengan Metode Pavement Condition Index (PCI) Studi Kasus: Jalan Pelabuhan Talang Duku Muaro Jambi Fakhrul Rozi Yamali; Mariza Sanubari; Fakhrul Rozi Yamali; Ria Zulfiati
Jurnal Civronlit Unbari Vol 8, No 1 (2023): April
Publisher : Universitas Batanghari

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/civronlit.v8i1.108

Abstract

Road pavement is the main infrastructure in transportation system. The condition of the pavement affects the comfort, security and safety of road users and is a supporting factor for the progress of the economic and social system in an area. This study aims to analyze the type of damage and level of performance in pavement conditions and provide repair solutions based on the 1995 Bina Marga standard method. The PCI method used in this study is an analysis of 3 main factor functions, namely: type of damage, level of damage severity and amount of damage. The result of the PCI method is a numerical index whose value is 0 to 100. Based on the results of research on the Talang Duku Harbor road, Taman Rajo District, Muaro Jambi Regency with a length of 4.7 Km and a width of 6 M, the highest type of damage was found, namely Patches with 65 damage and damage. the lowest is Amblas, Groove, Basin, Cracked Box with 1 damage and the average PCI value of all segments is 57.36%.
Analisis Produktivitas Alat Berat pada Pekerjaan Peremajaan Sawit pada Lahan Gambut Fakhrul Rozi Yamali; Muhammad Maulidin Z; Fakhrul Rozi Yamali; Riki Saputra
Jurnal Civronlit Unbari Vol 8, No 1 (2023): April
Publisher : Universitas Batanghari

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/civronlit.v8i1.109

Abstract

In construction work, whether it's building a building, road, bridge or other construction work, you really need tools that can support the work. The tools used in construction work are not only light tools that can already be used in building simple constructions but for construction that is not designed to be simple, heavy equipment is needed. Tools can be a reliable solution to assist the process of building facilities and infrastructure. This study aims to determine the productivity and the amount of heavy equipment needed as well as to determine the productivity of costs and time and human resources used. The research was conducted on the palm oil rejuvenation project for the people of Sumber Agung village, Sungai Gelam sub-district, Jambi province. The data used consists of primary data, namely interview data and secondary data, which consists of contract documents, and heavy equipment unit price reports. The data obtained were analyzed or compared with direct observations. From the results of the analysis, it was found that the number of heavy equipment needed in the palm oil rejuvenation work of the people of Sumber Agung village was 12 excavators and 10 chainsaw tools. With a work duration of 85 days or 598 working hours, the costs required for excavation and felling of oil palm trees for oil palm rejuvenation of the people of Sumber Agung village are Rp. 2,776,267,420. While in planning the amount of costs required for the work is Rp. 3,911,374,900.

Page 1 of 1 | Total Record : 6