cover
Contact Name
Eko Suprapto
Contact Email
teknikjepca@gmail.com
Phone
+6281366628321
Journal Mail Official
teknikjepca@gmail.com
Editorial Address
Fakultas Teknik Universitas Batanghari Jl. Slamet Ryadi, Broni-Jambi Kodepos: 36122
Location
Kota jambi,
Jambi
INDONESIA
Journal of Electrical Power Control and Automation (JEPCA)
ISSN : -     EISSN : 2621556X     DOI : 10.33087/jepca
Core Subject : Engineering,
Journal of Electrical Power Control and Automation (JEPCA) rises 2 (two) times a year which is in June and December. The journal publishes articles of research results, and the articles that are entered should not be the result of plagiarism and have not yet been published elsewhere. The article will be reviewed by the reviewer and the result will be communicated to the author. This journal opens up a huge opportunity for authors who wish to contribute to Journal of Electrical Power Control and Automation (JEPCA). Journal of Electrical Power Control and Automation (JEPCA) covers field of science: Power Distribution Power Electronics Control system Automation Electronics Engineering and Energy Management
Articles 5 Documents
Search results for , issue "Vol 6, No 1 (2023): Juni" : 5 Documents clear
Pengolahan Lindi Tempat Pemprosesan Akhir Sampah Talang Gulo Dengan Metode Elektrolisis S, Guntar Marolop; Kalsum, Siti Umi; Yusiana, Venny; Putri, Nur Juliana
Journal of Electrical Power Control and Automation (JEPCA) Vol 6, No 1 (2023): Juni
Publisher : Universitas Batanghari Jambi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/jepca.v6i1.102

Abstract

The Talang Gulo control landfill waste final processing site (TPA) has been decommissioned and converted into a Sanitary Landfill TPA in the city of Jambi. Even though it has been deactivated, the waste resulting from the decomposition of waste at the TPA control landfill must be managed. One of the wastes that is managed is leachate. Before being released into the environment, leachate must be processed in leachate ponds so that the receiving environment is not polluted. Some of the leachate parameters that must be managed are mercury (Hg) and cadmium (Cd), because if these two parameters enter surface water they will have a negative impact on aquatic biota. The research is planned at the Batanghari University Engineering Laboratory. On a laboratory scale, the Hg and Cd parameters of leachate can be reduced using the electrolysis method. Electrolysis is an alternative method for processing leachate because the chemical reaction process using electrodes can reduce the Hg and Cd parameters. The hypothesis that can be taken is that the electrolysis method can reduce the Hg and Cd parameters of landfill leachate.
Analisis Dugaan Kerusakan Rumah Yang Berdekatan Dengan Menara Telekomunikasi Suhendra, Suhendra; Yusiana, Venny
Journal of Electrical Power Control and Automation (JEPCA) Vol 6, No 1 (2023): Juni
Publisher : Universitas Batanghari Jambi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/jepca.v6i1.103

Abstract

In general lightning will predominantly strike parts of the earth's surface that have tall structures (tall buildings, BTS towers, high voltage transmission towers) and prefer structures made of conductive materials such as metal. The existence of a house close to a Telecommunication Tower is the background for this research. The research aims to analyze suspected damage that occurred to residential buildings that are very close to telecommunications tower activity. The method used is a general study of the feasibility of telecommunications towers as well as the types and patterns of damage that occurred in the houses studied. The results show that the damage that occurs to houses is mostly caused by the bearing capacity of the soil which is less affected by the shrinkage of the concrete. A comprehensive assessment needs to be carried out for telecommunications towers, especially the lightning conduction and grounding systems.
Kajian Teknis Dan Finansial Interkoneksi Pembangkit Listrik Tenaga Biogas Dari Palm Oil Mill Effluent (POME) Pada Sistem 20 KV Di Kabupaten Musi Rawas Thamrin, Nj.; Yusiana, Venny
Journal of Electrical Power Control and Automation (JEPCA) Vol 6, No 1 (2023): Juni
Publisher : Universitas Batanghari Jambi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/jepca.v6i1.104

Abstract

Using renewable energy is one way to reduce global warming. Minister of Energy and Mineral Resources Regulation No. 21 of 2016 concerning Purchase of Electricity and Biogas Power. The government has supported efforts to develop electrical energy from biogas. PT Evans Lestari is an oil palm plantation company operating in Mura with a plantation area of 9,220 ha and a mill of 60 tons/hour. In order to fulfill PLN's requirements to offer electricity supply, it is necessary to carry out a technical assessment of the connection and an economic analysis. The connection of the EBT PLT to PLN's 20 kV distribution system has been regulated in Directors' Decree No. 0357.K/DIR/2014. The benefits obtained from using DG include reducing power losses and improving the voltage profile of the distribution system. Among the types of DG that are commonly used, one of them is the Bio Gas Power Plant (PTBG) fueled by liquid palm oil waste.
Tinjauan Awal Penyulang Palem di PT. PLN (PERSERO) UIWS2JB UP3 Jambi Menggunakan Software ETAP Thamrin, Nj.; Suprapto, Eko; P, Hadi
Journal of Electrical Power Control and Automation (JEPCA) Vol 6, No 1 (2023): Juni
Publisher : Universitas Batanghari Jambi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/jepca.v6i1.100

Abstract

power flow in an electric power system is an event that flows in the form of active power (P) and reactive power (Q) from a generating system (sending side) through a transmission line or network until it reaches the load side (receiving side). . This power flow analysis has complicated stages if done manually, which requires an ETAP program. ETAP (Electric Transient Analysis Program) is software used to analyze an electric power system. This research was planned in the electrical engineering laboratory, Faculty of Engineering, Batanghari University, while the data was obtained from PT PLN (Persero) UIWS2JB Jambi. The ETAP method can simplify the calculation of the power flow in the palm feeder at PT PLN (Persero) Jambi.
Potensi PLTS Hybrid di PT. Makmur Indah Selaras International Muaro Jambi Suprapto, Eko; Djufri, S. Umar; Hendi, Hendi
Journal of Electrical Power Control and Automation (JEPCA) Vol 6, No 1 (2023): Juni
Publisher : Universitas Batanghari Jambi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/jepca.v6i1.101

Abstract

Renewable energy that is suitable for the tropical climate in Indonesia with an average solar radiation of 4.8 kwh/m2 per day is the use of photovoltaics or solar cells. To use solar cells, they can be placed on the roof of a building to save existing land, such as at PT. Makmur Indah Selaras International. The research method uses direct observation and literature study to obtain data on the use of solar panels at the factory. Meanwhile, the aim of this research was to see the utilization of existing PLTS with a hybrid system at PT. Makmur Indah Selaras Internasional, which is one of the palm oil factories operating in Muaro Regency, Jambi.

Page 1 of 1 | Total Record : 5