JURMATIS : Jurnal Manajemen Teknologi dan Teknik Industri
1. Quality and Reliability Engineering (QRE) Includes tools and techniques for engineering products in the goods industry and service industry. QRE to prevent product errors or defects. While in the process of the service industry to avoid problems in providing the best service solutions to customers, includes: - Variable control charts (x-chart, r-chart, s-chart, exponentially, moving range) - Attribut control charts (p-chart, np-chart) - Rectifying inspection - Design of experiments (ANOVA, factorial design, random factors in experiments) - Response surface methodology (robust design, cross array design, taguchi method) - Lean six sigma (DPMO, DMAIC, DMADV) - Failure analysis, Maintenance (sensors applications, preventive maintenance, group replacement) - Machine learning methods for analysing degradation data 2. Facilities Engineering and Energy (FEC) untuk Facilitis Engineering about resources to support the optimal production and distribution of goods and services. Meanwhile, energy related to power / power sources is needed for production activities, such as renewable power, as well as waste innovation for energy in production, includes : - Material handling system design, Order picking methods - Warehouse layout models, Facilities maintenance management systems - Design for racks and blockstacking - Biomass energy, energy storage for production/ distribution - Enegy modelling, energy planning and life cycle energy for production/ distribution with linear or non linear programming 3. Operation Engineering (OE) deals with production engineering closely with mathematical models to achieve optimizing limited resources in meeting user needs, includes: - Life cycle product, service and process - Forecasting models, trend based, seasonal series - Aggregate planning and control for manufacturing systems - Job shops, Just in time, work schedules - Inventory management and control, voice of customer - Master production schedule, multiline optimizaton, enterprise resource planning - Green supply chain, supply chain 4.0, reverse logistics, supplier risk - Machine learning methods for operation - Operation modelling, transport algorithm, production scheduling algorithm - Optimization problems (linear, non liniear and constraint programming) in operation 4. Technology – Ergonomic and Human Factors (TEHF) closely with design, devices and equipment that are technologically compatible with the human body and cognitive, include: - Anthropometric (musculoskeletal disorders, human variability, designing for everyone) - Occupational biomechanic, cardiovascular system, physiology in work system - Ergonomic Cognitif 4.0 (task demand, mental capacity, usability engineering) - Vision, lighting, hearing, sound, noise, vibration in work system - Ergonomic interventions, psychological factors, risk factors, displays and controls system
Articles
6 Documents
Search results for
, issue
"Vol. 1 No. 2 (2019): August"
:
6 Documents
clear
Analisa Pengaruh Sudut Pengelasan Dan Kuat Arus Terhadap Kekuatan Pada Pengelasan Plat (Square Plat) Menggunakan SMAW
Atmaja, Lukman Nuryadi;
Santoso, Heribertus Budi;
Komari, Ana
JURMATIS (Jurnal Manajemen Teknologi dan Teknik Industri) Vol. 1 No. 2 (2019): August
Publisher : Universitas Kadiri
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
DOI: 10.30737/jurmatis.v1i2.293
The welding technique of SMAW (Shielding Metal Arc Welding) has been carried out extensively, the problems that occur in every connection of construction materials. This problem is how much strength is the weld joint after experiencing welding. The aim is to determine the results of the tensile welding test which is influenced by the angle and current strength of SMAW welding on the ST 37 material and to obtain the results of the SMAW welding according to the angle and current strength. The parameters measured in this study include controlled variables including current strength and strength angle where the free parameter X1 = current strength (I) 65, 70, 75, while X2 = welding angle (0) 700 750 800. At the same time, the response variable is mechanical strength. Annova test for voltage interaction test there is no interaction between the current vactor and the angle vactor at 5% significance. The lowest F (N) load calculation is 60/70 = 5000, and the highest is 75/80 = 45,000. For the lowest stress (σu) 60/70 = 25.0, the highest is 75/80 = 225.00. Calculation of strain / strein (e) lowest 56/75 = 15, highest 65/80 = 18.8. Calculation of the lowest contraction (%) angles 65/80, 70/75 and 75/75 = 2.56. Highs 70/70 and 75/80 = 14.29. The lowest hooke law calculations are 70/70 and 75/75 = 2.6. Highest 75/80 = 14.3.Teknik pengelasan SMAW (Shielding Metal Arc Welding) telah dilakukan secara luas, Permasalahan yang terjadi pada setiap penyambungan material kontruksi. Permasalahan tersebut yaitu seberapa besar kekuatan sambungan las setelah mengalami pengelasan.Tujuan untuk mengetahui hasil uji tarik pengelasan yang dipengaruhi oleh sudut dan kuat arus pengelasan SMAW pada material ST 37 dan untuk mendapatkan hasil pengelasan SMAW yang sesuai dengan sudut dan kuat arus. Parameter yang diukur dalam penelitian ini meliputi fariabel terkontrol meliputi kuat arus dan sudut kekuatan dimana parameter bebas X1 = kuat arus (I) 65, 70, 75, Sedangkan X2 = Sudut Pengelasan (0) 700 750 800. Sedangkan variabel respon adalah kekuatan mekanik. Uji anova tegangan uji interaksi tidak ada interaksi antara  vactor arus dengan  vactor sudut pada signifikansi 5%. Perhitungan beban F ( N ) terendah 60/70 = 5000, dan tertinggi 75/80 = 45.000. Untuk tegangan/stress ( ) terendah 60/70 = 25,0, tertinggi 75/80 = 225,00. Perhitungan regangan/strein (e) terendah 56/75 = 15, tertinggi 65/80 = 18,8. Perhitungan kontraksi (%) terendah sudut 65/80, 70/75 dan 75/75 = 2,56. Tertinggi 70/70 dan 75/80 = 14,29.Perkitungan  hukum hooke terendah 70/70 dan 75/75 = 2,6. Tertinggi 75/80 = 14,3.
PENERAPAN MANAJEMEN RISIKO GUNA MENGETAHUI TINGKAT KECELAKAAN KERJA PADA PEKERJAAN PIGGING DI AREA SISI NUBI TOTAL E & P INDONESIE
Wahyudi, Wahyudi;
Santoso, Heribertus Budi;
Komari, Ana
JURMATIS (Jurnal Manajemen Teknologi dan Teknik Industri) Vol. 1 No. 2 (2019): August
Publisher : Universitas Kadiri
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
DOI: 10.30737/jurmatis.v1i2.439
According to BPJS of Employment throughout 2015, there were 105,182 work accidents, with 2,375 deaths. By looking at the high number of work accidents and the number of victims who died, it is necessary to make an effort to prevent and control the risks posed by a job. This research discusses the risk value of pigging work in the side of the Nubi Total E & P Indonesie area. The purpose of this research is to determine the type and level of risk at each stage of work so that the highest risk can be identified. This research is a descriptive-analytic study using a semi-quantitative risk analysis method based on AS / NZS 4360: 2004. The results state that the level of risk that each stage of work has from the lowest is acceptable, priority 3, and substantial. In the preparation stage of a career, the highest risk is being hit by hand tools. At the material transfer stage, the most increased risks are falling loads, bad weather, and visibility. Meanwhile, in the pigging work process, the highest risk is high-pressure hydrocarbon gas. In implementing the Occupational Safety and Health Management System (SMK3), the company has carried out various controls and improvements to reduce the risk value in pigging work, including providing training to employees, providing personal protective equipment, and carrying out technical and administrative controls.Menurut data BPJS Ketenagakerjaan sepanjang tahun 2015 telah terjadi kecelakaan kerja sejumlah 105.182 dengan korban meninggal 2.375 orang. Dengan melihat masih tingginya angka kecelakaan kerja dan banyaknya korban yang meninggal dunia, maka perlu dilakukan sebuah usaha untuk mencegah dan mengendalikan risiko yang ditimbulkan oleh suatu pekerjaan. Penelitian ini membahas tentang nilai risiko yang dimiliki oleh pekerjaan pigging di area Sisi Nubi Total E & P Indonesie. Tujuan penelitian ini adalah untuk menentukan jenis serta tingkat risiko pada masing-masing tahapan pekerjaan pigging sehingga nantinya level risiko tertinggi bisa diketahui. Penelitian ini adalah penelitian deskriptif analitik dengan menggunakan metode analisis risiko semi-kuantitatif berdasarkan AS/NZS 4360:2004. Hasil penelitian menyatakan bahwa level risiko yang dimiliki setiap tahapan pekerjaan pigging mulai dari yang terendah yaitu acceptable, priority 3 dan substantial. Pada tahapan persiapan pekerjaan pigging, risiko tertinggi adalah terpukul handtools. Pada tahapan transfer material, risiko tertinggi adalah beban terjatuh, cuaca buruk dan jarak pandang. Sedangkan pada proses pekerjaan pigging, risiko tertinggi adalah gas hidrokarbon bertekanan tinggi. Dalam menerapkan Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3), perusahaan telah melakukan berbagai pengendalian dan perbaikan untuk mengurangi nilai risiko pada pekerjaan pigging, diantaranya adalah memberikan pelatihan kepada karyawan, menyediakan alat pelindung diri, serta melakukan pengendalian engineering dan administrasi.
ANALISIS KINERJA DISTRIBUSI LOGISTIK PADA PASOKAN BARANG DARI PT. SURYA PAMENANG KE KONSUMEN
Kurniawan, Ruddy;
Santoso, Heribertus Budi;
Komari, Ana
JURMATIS (Jurnal Manajemen Teknologi dan Teknik Industri) Vol. 1 No. 2 (2019): August
Publisher : Universitas Kadiri
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
DOI: 10.30737/jurmatis.v1i2.440
The problem that often occurs in management is the lack of control in logistics management. The logistics distribution management control policy will affect increasing the performance of the company in distributing demand from producers to customers and managing product inventory in distribution centers. In terms of management performance, PT. Surya Pamenang in fulfilling the needs has been optimal. However, in supporting the implementation of supply chain management, which is inseparable from the influence of distribution center location on distribution distance, smooth transportation in distribution to consumers, and the availability of products at the distribution center to meet the demands of each consumer, it needs to be re-evaluated. With this research, it is hoped that it can help in overcoming the problems faced by PT. Surya Pamenang. This study concludes that companies can be more efficient and effective in minimizing the risks that may occur for the company. The performance of logistics management supports positive improvements for the company.Permasalahan yang sering terjadi dalam pengelolaan manejemen dalam hal ini kurangnya pengendalian dalam manajemen logistik. Kebijakan pengendalian manajemen distribusi logistik akan berpengaruh dengan terhadap meningkat performa kinerja perusahaan dalam mendistribusikan permintaan dari produsen kekonsumen pelanggan dan mengatur persediaan produk di pusat distribusi. Dilihat dari segi kinerja menejemen PT. Surya Pamenang dalam pemenuhan kebutuhan sudah optimal. Akan tetapi dalam mendukung kinerja manajemen rantai pasokan yang tidak terlepas dari pengaruh lokasi pusat distribusi terhadap jarak Pendistribusian, kelancaran transportasi dalam pendistribusian ke konsumen serta ketersediaan produk di pusat distribusi untuk memenuhi permintaan dari setiap konsumen perlu dievaluasi kembali. Dengan adanya penilitian ini diharpakan dapat membatu dalam mengatasi permasalahan – permasalahan yang di hadapi PT. Surya Pamenang. Penelitian ini menyimpulakan bahwa perusahan dapat lebih efisien dan efektif dalam meminimalisir dari resiko yang dapat terjadi bagi perusahaan. Kinerja dari manajemen logistik mendukung peningkatan yang positif bagi perusahaan.
PENGARUH KUALITAS PELAYANAN TERHADAP KEPUASAN PELANGGAN PLN RAYON KEDIRI KOTA (STUDI KASUS PEMBAYARAN REKENING LISTRIK DI PLN RAYON KEDIRI KOTA)
Santoso, Septiyan Budi;
Santoso, Heribertus Budi;
Komari, Ana
JURMATIS (Jurnal Manajemen Teknologi dan Teknik Industri) Vol. 1 No. 2 (2019): August
Publisher : Universitas Kadiri
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
DOI: 10.30737/jurmatis.v1i2.441
This study aims to determine how high the level of customer satisfaction with the service of PLN Rayon Kediri Kota, to assess the quality of service to customer satisfaction PLN Rayon Kediri Kota, to determine the response of the PLN Kediri Kota in dealing with customer complaints. This research was conducted in the work area of PLN Rayon Kediri Kota. The research time was from March 18, 2017, to March 24, 2017. In writing this thesis, the author uses primary data collection techniques, namely by distributing questionnaires to PLN Rayon Kediri Kota customers who come to the payment counter. And PLN District Kediri City services. Based on the research results, the quality of service conducted by PLN District Kediri Kota is sufficient to satisfy its customers, as evidenced by the results of a questionnaire that has been conducted on 100 respondents of PLN Rayon Kediri City.Penelitian ini bertujuan untuk mengetahui seberapa tinggi tingkat kepuasan pelanggan terhadap pelayanan PLN Rayon Kediri Kota, Untuk mengetahui kualitas pelayanan terhadap kepuasan pelanggan PLN Rayon Kediri Kota, Untuk mengetahui respons pihak PLN Kediri Kota dalam menghadapi keluhan pelanggannya. Penelitian ini dilakukan di wilayah kerja PLN Rayon Kediri Kota. Waktu penelitian pada tanggal 18 Maret 2017 sampai dengan 24 Maret 2017. Dalam penulisan skripsi ini, penulis menggunakan teknik pengumpulan data primer yaitu dengan membagikan kuesioner terhadap pelanggan PLN Rayon Kediri Kota yang datang ke loket pembayaran dan pelayanan PLN Rayon Kediri Kota. Berdasarkan hasil penelitian kualitas pelayanan yang dilakukan oleh PLN Rayon Kediri Kota sudah cukup memuaskan pelanggannya terbukti dengan hasil kuesioner yang telah dilakukan terhadap 100 responden PLN Rayon Kediri Kota.
PENGEMBANGAN MODEL SERVICE QUALITY PADA INDUSTRI JASA OTOMOTIF DI â€EIFISIENSI TOUR AND TRAVEL†TULUNGAGUNG
Susilo, Tali Roso;
Rahayuningsih, Sri;
Santoso, Heribertus Budi
JURMATIS (Jurnal Manajemen Teknologi dan Teknik Industri) Vol. 1 No. 2 (2019): August
Publisher : Universitas Kadiri
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
DOI: 10.30737/jurmatis.v1i2.442
In this study, an analysis of the development of a quality service model for land transportation service providers, namely Eiffficiency Tour and Travel, is located in Wajak Kidul, Boyolangu District, Tulungagung Regency. In reality, there are still many matters related to service quality ignored by Tour and Travel Efficiency in the field. This is evidenced by the events that occur in the reasonably extensive list of customer complaints. This study refers to the survey method carried out by collecting information from samples obtained from a place to generalize the extent to which the population from which the sample was taken. In this final project research, the authors researched transportation service providers. "Efficiency Tour and Travel" in the village of Wajak Kidul Tulungagung refers to the development of a quality service model. The research process used interviews, documentation, and questionnaires, with a total of 35 respondents. This research is more effective with the calculation of t count> t table: then Ho is rejected, meaning that there is a significant influence between variable X and variable Y. results in 4,927. 2.021: then, Ho is rejected, meaning that there is a substantial influence between CV services. Efficiency Jaya customer satisfaction as a form of model useDalam penelitian ini dilakukan analisis pengembangan model service kualiti pada penyedia jasa transportasi darat yaitu Eifisiensi Tour and Travel yang berkedudukan di desa Wajak Kidul Kecamatan Boyolangu Kabupaten Tulungagung. Dalam kenyataannya di lapangan masih banyak hal-hal yang berkaitan dengan kualitas pelayanan diabaikan oleh Eifisiensi Tour and Travel. Hal tersebut terbukti dengan peristiwa yang terjadi pada daftar keluhan pelanggang yang cukup banyak. Dalam penelitian ini mengacu pada metode survei dilakukan dengan cara menghimpun informasi dari sampel yang diperoleh dari suatu tempat dengan tujuan untuk melakukan generalisasi sejauh populasi darimana sampel tersebut diambil. Dalam penelitian tugas akhir ini, penulis melakukan penelitian di perusahaan penyedia jasa transportasi.â€Eifisiensi Tour and Travel†desa Wajak Kidul Tulungagung mengacu pada pengembangan model servis quality. Proses penelitian menggunakan wawancara, dokumentasi dan kuesioner, dengan jumlah 35 responden. Penelitian ini lebih efektif dengan hasil dari perhitungan t hitung > t table: maka Ho di tolak, artinya berarti terdapat pengaruh yang signifikan antara variabel X dengan variabel Y. hasil 4.927. 2.021: maka Ho ditolak, artinya terdapat pengaruh yang signifikan antara pelayanan CV. Eifisiensi Jaya kepuasan pelanggan sebagai bentuk penggunaan model Service Quality
PERENCANAAN AGREGAT PADA INDUSTRI PENGOLAHAN KAYU JENIS FLOORING DENGAN PENDEKATAN HEURISTIC (Study Kasus Pada PT Sinar Rimba Pasifik Sidoarjo)
Susanti, Reny Dwi;
Santoso, Heribertus Budi;
Komari, Ana
JURMATIS (Jurnal Manajemen Teknologi dan Teknik Industri) Vol. 1 No. 2 (2019): August
Publisher : Universitas Kadiri
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
DOI: 10.30737/jurmatis.v1i2.443
Production processes are interrelated so that when one goal is optimal, it may result in other plans being less than optimal, or it can also be detrimental to other purposes. PT. Sinar Rimba Pasifik is a company engaged in the furniture sector, registered in 2000 and having its address at Jatikalang Village, Krian-Sidoarjo Sidoarjo, East Java. It measures the work efficiency of employees at PT. Sinar Rimba Pasifik is still said to be conventional. The research method used in this research is the explanatory survey method, which is the study of taking a sample of a product using a questionnaire as a primary data collection tool to explain the current and future conditions. This study uses several stages to determine the production of aggregate planning at PT. Sinar Rimba Pasifik, and analyze the need to use the right method or approach. This study's system uses a heuristic approach by comparing three types of variation from aggregate planning: control of labor, sub-contracts, and overtime hybrids. Planning aggregate production of Naguring Heating Flooring in this study is limited by determining the amount of output following demand, optimizing income, and allocating resources, especially in the efficiency of working hours, and knowing the optimization of the use of the hearing method.Proses produksi yang saling berkaitan sehingga ketika tujuan yang satu optimal bisa saja mengakibatkan tujuan yang lain kurang optimal atau bisa juga merugikan tujuan yang lain. PT. Sinar Rimba Pasifik merupakan perusahaan yang bergerak dibidang mebel terdaftar pada tahun 2000 dan beralamat di Desa Jatikalang, Krian-Sidoarjo Sidoarjo Jawa Timur. Pengukuran efisiensi kerja karyawan di PT. Sinar Rimba Pasifik masih dikatakan konvensional. Metode penelitian yang digunakan dalam penelitian ini adalah metode survey eksplanatory, yaitu penelitian mengambil sampel dari suatu produk-produk menggunakan koesioner sebagai alat pengumpulan data pokok untuk menjelaskan keadaan sekarang maupun keadaan yang akan datang. Penelitian ini menggunakan beberapa tahapan guna mengetahui perencanaan agregat produksi di PT.Sinar Rimba Pasifik, serta menganalisis perlunya menggunakan metode atau pendekatan yang tepat. Pendekatan pada penelitian ini menggunakan pendekatan heuristik dengan melakukan komparasi terhadap tiga tipe variasi dari perencanaan agregat, yakni pengendalian Tenaga Kerja, Sub-kontrak, dan Hibrid Lembur (overtime). Perencanaan agregat produksi Naguring Heating Flooring dalam penelitian ini dibatasi dengan adalah penentuan jumlah produksi yang sesuai dengan permintaan, mengoptimalkan pendapatan, dan pengalokasian sumber daya terkhusus dalam efisiensi jam kerja, dan mengetahui optimalisasi penggunaan metode hauring.