cover
Contact Name
Sugeng Santoso
Contact Email
sugeng.santoso@mercubuana.ac.id
Phone
+6282132044774
Journal Mail Official
ti.jurnal@umm.ac.id
Editorial Address
Departement Industrial Engineering University of Muhammadiyah Malang Jl. Tlogomas No 246 Malang
Location
Kota malang,
Jawa timur
INDONESIA
Jurnal Teknik Industri
ISSN : 19781431     EISSN : 25274112     DOI : -
Dr. Saiful Anwar Malang is a state hospital has done it is job and function, but in 3rd class of pavilion room, the number of patient decrease dramatically. It is concerned with quality of this hospital. To answer this problem, research was done using Quality Function Deployment (QFD). Quality Function Deployment is a tool which design some needs include customers represented as a voice of customer and including some competitions and also groups some activities that usually called affinity graphic ang getting a benchmarking for it is competition. From the result analysis can be showed that main attribute for patience is a accuracy. And from House Of Quality can be found that getting a periodic meeting to evaluate this hospital and also increase a service can be made 20 concept
Articles 8 Documents
Search results for , issue "Vol. 2 No. 2 (2001)" : 8 Documents clear
Penyusunan Jadwal Induk Industri dengan Menggunakan Metode Simpleks Guna Meminimalkan Biaya Produksi Murti Astuti; Ifa Yuliana
Jurnal Teknik Industri Vol. 2 No. 2 (2001)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol2.No2.86-95

Abstract

PT. Industri Sandang Nusantara Pata! Secang Magelang is some factory that regarding in manufactur sector which thread producting. For this time the factory have a problem with stacking same kind of product and in the other way less  another product. This case cause that factory use product scheduling based on experience and reckoned of selling in last period.  Connected with this problem, the  case is how to make a good  schedule in order that  factory could be completing consumer demand and decided some main product schedule with simpleks methode.The articulate in factory for this time is reguler employee 65 persons.  If reguler employee is  not enaugh, then there are overtime job (maximal 2 hour/days), and if still  not enaugh too, then used subcontract. Based on capacity of production, the  number of  maximal employee  are 70 personsAccording to  teoritis,  with  using  of  forecasting  and  agregat  planning,  the  factory's problem can be done. This forecasting used to productin supossing in about to many periods.  With use simpleks methode can be planning the number of employee. In order that, the main production can be made.Analyst result get that  demand fluktuation for R 30/1,   PR 30/1  products use Moving Average Linear Trend (3) methode, R 24/ 1,  R I 11,  PR 40/l products using Moving Average Linear Trend (5) methode, PR 45/l  product using Linear Regression methode. Value analyst with based on forecasting result for future 12  periods,  supposed that factory will  pay for Rp.  460.340.000,• After applying Linear Programming giftotal cost Rp. 450.164.576,-.  Thrifting Rp. 10.175.424,- or 2,2%.   Sensitivity analyst made cost to be Rp. 448.651.040,-,   thrifting Rp.  11.688.960,-    or 2,5%  at the number of regular employees 66 persons.
Perancangan Sistem Informasi Manajemen untuk DistribuTion Requirement Planning Annisa Kesy Garside
Jurnal Teknik Industri Vol. 2 No. 2 (2001)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol2.No2.128-137

Abstract

A cigaretec ompanyP, T. DjagungP adio fteng ot fouble or problemin distributionth eirproduct especially in acuracy of product delivery that cause lost sale. One of method that can beusedt o makea good deliverys cheduleis usingD istributionR equiremenPt lanning.lt makest heinformation of delivery schedule from factory to distribution or from distributor to company canbe fastly done and have high accuracy. It means that the company need a InformationManagement System ( SIM ).This research'sa ims in to designS IM and DRP in PT. DjagungP adi using thesemethod( systemt)h ef actoryc ans aveh oldingc ostl ack of productc osto f DjagungP adip roducta sDjagungP adi" hijau" andD jagungP adi" kuning" from Rp 1.782.900,0t0o Rp 867.300,00fo r amontha ndn o morel acko f productin distributions ystem.
PARENCANAAN KEBUTUHAN BAHAN BAKU SNPATU DENGAN METODE MATERIAL REQUIRI,MINT PLANNING (MRP) Dyah Retno Purwatiningsih
Jurnal Teknik Industri Vol. 2 No. 2 (2001)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol2.No2.118-127

Abstract

IJD KartikaM agetanis a companyw hich produceo r assemblys hoesth at is activitiesdepend on the demand. This company doesn't have a good schedule in requirement andunschedulemd aterial.T his is becomesb y overloadm ateriacl apacitys o that increaseth e holdingcost a.ndr equirementc ost. To scheduleth e appropiatem aterial arriving we needt o plan materialavailabilityw ith Material RequiremenPt lanning( MRP). Firstly implementingt his methodforecast he dernandu, singl inier programmingm ethodt o makea gregata nd Masterp roductionSchedule (MPS). We need the data such as demand, product structure, component stock ,productionc apacitya, ndp roductionc ost.This methodg et the numbero f regulerw orkeri s about 13 personsH. oldingc ost afterimplemented MRP is about Rp 4.608.047,48 and before implemented MRp is aboutRp 6.455.677,08S. otherei s about P;,pl.847.629o,6t2 9% off afteru singM Rp method..
Penjadualan Produksi Melalui Sistem Produksi Just In Time dengan Kaban Guna Memenuhi Permintaan Eti Kristinawati
Jurnal Teknik Industri Vol. 2 No. 2 (2001)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol2.No2.138-146

Abstract

JustI n Timep roductions ystemis a productions ystemw hichp roducea productw hent heyare neededa nd a fit numbero f productt o achievet he consument'sd emand.T o make theproductionp rocessru n well so it mustb e made a plana nd scheduleo f goodp roductionp rocessrangkingw hich is approachw ith the demandc ondition.CV. SugrhW arasi s a furniturec ompanyw hich has a demando f producti ncreaseT. hisproblemw ill maket he companyh ast roublet o achievei t. JIT productions ystemw ith using ascheduleo f productiona nd kanbanb ecomea problems olvinga lternetiveto solvet he customerdemandp roblemF. rom the analysisw e shownt hat usingJ IT problems ystemc anr educeth e backordero fproductr esult.T hep rofit canb e reachedb eforei mplemenJt IT is Rp 253.236.000,0a0n dafteri mplemenJt IT isRp 289.803.000,0s0o t hati ncreasea bout Rp 36.567.000,O0or1 4.44yo.
Quality By Design dengan Metode Taguchi, Konsep dan Perkembangannya Moh. Hartono
Jurnal Teknik Industri Vol. 2 No. 2 (2001)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol2.No2.96-108

Abstract

Industriaml anufactued evelopingis dramaticallpy rogressinngo w followedb y dinamicenvironmentacl hangesT. o give this customerv oices,i ndustrialm anufactureh ave to alwaysincreaseth e quality.I n the otherh andt hereh aveb eenc hangeos f qualityp aradigmath, at's aboutproblems olvinga nd inspectionb, ecomeq ualitye ngineeringin processa nd productw ith Robustdesigna pproachingT. his concepti dea is getting quality processa nd optimump roduct withnoticingn oisef actors,s ot hatt he losso f customercsa nb e minimized.T he Rotrusdt esigni s basedby the needso fdesigni n processa ndp roducth avea strenghtto anu ncontrolledn oisef actors.
PERENCANAAN DAN PENJADWALAN PRODUKSI DENGAN MENGUNAKAN METODE TRANSPORTASI GUNA MENINGKATIFKAN PROFIT Ayudina Puji Estrimaz; Junaedi Iskandar
Jurnal Teknik Industri Vol. 2 No. 2 (2001)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol2.No2.147-155

Abstract

The first step of implementing the planning and schedulling of production usingtransportation method is forecast the demand that oount the number of demand that depend on thetrendo fdata. Recordingto the aralysis,t he fix rnethodw hich appropiatew ith trendo f datai s rnovingaverages, inglee xponenthiaeln dd oublee xponentiaml ethod.T he next stepi s mix datab asedo n theforecastingr esult thet havec onvercedin to hours,a nd changec ost into hours.T he last stepu sing thosedatai nto 85 prcgramt o get a productionp lana ndc osto f planningr esult.F romt he final analysisc anfind decreasincgo sta fteri mplementintgr ansportatiomn ethoda boutR p.-l1.7 65.28Qo,-r 7,27o /oo ff ofthe overall cost.
Perencanaan Line Balaning Guna Meningkatkan Output Produksi Teguh Baroto
Jurnal Teknik Industri Vol. 2 No. 2 (2001)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol2.No2.109-117

Abstract

Every companyw ill alwaysh avem aing oal in a maximumb ennefit.F or this, onef actorwhich support his is how to makea good productionp rocessT. his will be reachedif balancingline of productionfl oor hasa verages tressingo f work especiallyfo r assemblyc ompanyb ecausematerial handling in a work station will influence alother work station and cause production targetof companyw on't be available.For getting line balancing use Rank Positional Weighat (RPW), method which is aheuristicm ethodst hat is statemenot f trial and error approachingT.h is methodd ependso n thefunction value for each work operation based on the standard time for each work activitiesfollowingt hep roductionp rocessra nking( presedencdeia gram).From the analysis using RPW method can be found optimum balance delay to each typeof ARM producti s from 60,46% to 20,5488% with productiono utputl lom 113,50u nits/daybecome 116 unit/day, and also work efiiciency from 60,50 yo to 78,4511 o%, with workstationnumbera bout7 work stationsI.n otherh andf or type ofBED product1 5 hasb alanced elayf rom35,29o /oto 16,454w ith productiono utputi ncreaseft om 77,44m t/day become1 20u niVdaya ndalso hase fficiencya bout6 4,710 /ob ecome8 3,548% with work stationn umbera bout6 . Theni tcan be concludedt hat work stationd esignu sing RPW methodw ill increaseo utput produotespeciallfyo r assemblyc ompany.
Studi Penerapan Strategi Segmentasi Pasar, Target Pasar dan Penempatan Posisi Guna Peningkatan Jumlah Konsumen pada Hotel Kartika Wijaya Batu Wahyu Eni Maryati
Jurnal Teknik Industri Vol. 2 No. 2 (2001)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol2.No2.167-178

Abstract

Market segmentationh ave purpose to devide plural customersi nlo the same marketsegmentationF. rom this segment,m arket sharet hat will be served dependingt o the segmentt hat givemaximum profit for Kartika Wijaya Hotel Batu.The methodu sedi n this researchis usingc lustera nalysisw ith SPSSp rograma s a help.T hesecondm ethodt hat be usedi s caracteristiacn alysism ethodo f customeres achs egmenut singc rossT absanalysisa nd the third methodu singp references tructurea nalysism ethodo f segmenut sing Thurstone'scase analysis.In customers egmentatioann alysisu singc lastera nalysisc an got 5 segments4.. of 5 balancesegmentfso rmedc ustomer'sp rofile caracterislice very segmenbt asedo n demografvi ariatesb, ehaviors,and advantagesA. nd from customer'sp references truclure concludet hat the prize that have beend ecidedby companyim portanat spect/s a tributeso f customer.

Page 1 of 1 | Total Record : 8


Filter by Year

2001 2001


Filter By Issues
All Issue Vol. 25 No. 2 (2024): August Vol. 25 No. 1 (2024): February Vol. 24 No. 2 (2023): August Vol. 24 No. 1 (2023): February Vol. 23 No. 2 (2022): August Vol. 23 No. 1 (2022): February Vol. 22 No. 2 (2021): August Vol. 22 No. 1 (2021): February Vol. 21 No. 2 (2020): August Vol. 21 No. 1 (2020): February Vol 21, No 1 (2020): February Vol 20, No 2 (2019): August Vol. 20 No. 2 (2019): August Vol 20, No 1 (2019): February Vol. 20 No. 1 (2019): February Vol 19, No 2 (2018): Agustus Vol. 19 No. 2 (2018): Agustus Vol. 19 No. 1 (2018): Februari Vol 19, No 1 (2018): Februari Vol 18, No 2 (2017): Agustus Vol. 18 No. 2 (2017): Agustus Vol 18, No 1 (2017): Februari Vol. 18 No. 1 (2017): Februari Vol. 17 No. 2 (2016): Agustus Vol 17, No 2 (2016): Agustus Vol. 17 No. 1 (2016): Februari Vol 17, No 1 (2016): Februari Vol 16, No 2 (2015): Agustus Vol. 16 No. 2 (2015): Agustus Vol. 16 No. 1 (2015): Februari Vol 16, No 1 (2015): Februari Vol 15, No 2 (2014): Agustus Vol. 15 No. 2 (2014): Agustus Vol. 15 No. 1 (2014): Februari Vol 15, No 1 (2014): Februari Vol. 14 No. 2 (2013): Agustus Vol 14, No 2 (2013): Agustus Vol. 13 No. 2 (2012): Agustus Vol 13, No 2 (2012): Agustus Vol 13, No 1 (2012): Februari Vol. 13 No. 1 (2012): Februari Vol 12, No 2 (2011): Agustus Vol. 12 No. 2 (2011): Agustus Vol 12, No 1 (2011): Februari Vol. 12 No. 1 (2011): Februari Vol 11, No 2 (2010): Agustus Vol. 11 No. 2 (2010): Agustus Vol. 11 No. 1 (2010): Februari Vol 11, No 1 (2010): Februari Vol 10, No 2 (2009): Agustus Vol. 10 No. 2 (2009): Agustus Vol 10, No 1 (2009): Februari Vol. 10 No. 1 (2009): Februari Vol 9, No 2 (2008): Agustus Vol. 9 No. 2 (2008): Agustus Vol. 9 No. 1 (2008): Februari Vol 9, No 1 (2008): Februari Vol. 8 No. 2 (2007): Agustus Vol 8, No 2 (2007): Agustus Vol 8, No 1 (2007): Februari Vol. 8 No. 1 (2007): Februari Vol. 4 No. 2 (2003) Vol 4, No 2 (2003) Vol. 3 No. 2 (2002) Vol 3, No 2 (2002) Vol 3, No 1 (2002) Vol. 3 No. 1 (2002) Vol 2, No 2 (2001) Vol. 2 No. 2 (2001) Vol 2, No 1 (2001) Vol. 2 No. 1 (2001) Vol 1, No 2 (2000) Vol. 1 No. 2 (2000) Vol 1, No 1 (2000) Vol. 1 No. 1 (2000) More Issue