cover
Contact Name
Asep Rahmatullah
Contact Email
admin@lppmbinabangsa.id
Phone
+628121950044
Journal Mail Official
admin@lppmbinabangsa.id
Editorial Address
S1 Teknik Industri Jl. Raya Serang – Jakarta KM.3 No.1B (Pakupatan) Kota Serang Provinsi Banten Telp. (0254) 220158; Fax. (0254) 220157
Location
Kota serang,
Banten
INDONESIA
Jurnal Taguchi : Jurnal Ilmiah Teknik dan Manajemen Industri
ISSN : 2798964X     EISSN : 27989658     DOI : https://doi.org/10.46306/tgc
Core Subject : Engineering,
Taguchi Adalah Jurnal Ilmiah Keilmuan Teknik dan Manajemen Industri terbit secara daring pada bulan Juni dan Desember. untuk menyebarluaskan hasil-hasil penelitian dalam bidang keilmuan Teknik dan Manajemen Industri sesuai dengan Body Knowledge pada Teknik industri.
Articles 14 Documents
Search results for , issue "Vol. 3 No. 2 (2023): Jurnal Taguchi : Jurnal Ilmiah Keilmuan Teknik dan Manajemen Industri" : 14 Documents clear
ANALISIS NERACA AIR PADA JARINGAN IRIGASI DESA KEDAWUNG KECAMATAN MOJO KABUPATEN KEDIRI DALAM PEMENUHAN AIR IRIGASI Santoso, Rani Rachmad; Saves, Faradlillah
Jurnal Ilmiah Teknik dan Manajemen Industri Vol. 3 No. 2 (2023): Jurnal Taguchi : Jurnal Ilmiah Keilmuan Teknik dan Manajemen Industri
Publisher : LPPM Universitas Bina Bangsa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46306/tgc.v3i2.148

Abstract

This research aims to analyze the water balance in the irrigation network in Kedawung Village, Mojo District, Kediri Regency, with a focus on irrigation water supply. Irrigation water is an important factor in agriculture, and the success of an irrigation system is highly dependent on the availability of sufficient and efficient water. The research method involves field surveys to collect data regarding water sources, water distribution, and irrigation water use. In addition, weather and rainfall data were also taken to assess the influence of climate factors on irrigation water availability. The water balance data analyzed includes the volume of water entering the irrigation network, the volume of water used for agriculture, and the volume of water lost due to evaporation and soil infiltration. The results of the water balance analysis will be used to evaluate the efficiency of irrigation water use in Kedawung Village. In addition, this research will also evaluate the adequacy of irrigation water to support local agriculture. If there is a shortage of irrigation water, this research can provide recommendations for improving the irrigation system or water source management.Thus, it is hoped that this research can provide valuable information for local governments, farmers and other stakeholders in an effort to increase agricultural productivity and meet irrigation water needs in Kedawung Village
PENENTUAN JUMLAH TENAGA KERJA PADA PROSES PEMBUATAN BATU BATA DENGAN METODE WORK LOAD ANALYSIS (WLA) GUNA MEMENUHI PERMINTAAN Abdillah, Vicky Harisuddin; Purnama, Jaka
Jurnal Ilmiah Teknik dan Manajemen Industri Vol. 3 No. 2 (2023): Jurnal Taguchi : Jurnal Ilmiah Keilmuan Teknik dan Manajemen Industri
Publisher : LPPM Universitas Bina Bangsa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46306/tgc.v3i2.194

Abstract

UD Agung Barokah is a Small and Medium Enterprise (UKM) which produces red bricks. This UKM produces red bricks which are used for building construction such as housing walls, fences, warehouse walls and gutters. Labor is an important element in red brick production. To carry out production activities every day, the company must know the capacity of its employees because it has a big impact on the production process so that it is more optimal. The WLA method is used in analyzing labor needs to optimize the use of human resources. By calculating WLA, companies can measure the amount of labor needed to complete certain work. Meanwhile, aggregate planning is used to help companies plan production capacity to meet demand and according to existing capacity, with the lowest possible expenditure. The standard time for the process of making 1 unit of bricks which includes 5 divisions is 13.38 minutes. The initial workforce at the company was 10 workers, then data processing was carried out using the WorkLoad Analysis (WLA) method to fulfill the request obtained for 11 workers without doing overtime at a cost of Rp. 27,270,000,- with details from the division operator printing (O-1) only requires 1 worker. Meanwhile, calculations using capacity planning and production costs for the number of workers to meet demand produce results of 6 workers. The results after carrying out the labor planning calculations showed that the costs were IDR 23,566,000 and the labor costs before planning were IDR 25,200,000, in both calculations the labor costs were different.
ANALISIS PENJADWALAN PRODUKSI UNTUK MEMINIMALKAN STOCK OUT GUNA MEMENUHI TARGET PERMINTAAN Zamroni, Moh Shiddiq; Arief, Zainal
Jurnal Ilmiah Teknik dan Manajemen Industri Vol. 3 No. 2 (2023): Jurnal Taguchi : Jurnal Ilmiah Keilmuan Teknik dan Manajemen Industri
Publisher : LPPM Universitas Bina Bangsa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46306/tgc.v3i2.224

Abstract

Production management is responsible for making smart decisions regarding the most suitable production strategy for the future, focusing on reducing costs as efficiently as possible while increasing profit potential. UD Inti Jaya is a business engaged in building, namely the manufacture of tile from clay. UD. Inti Jaya has used various different methods of production planning and raw material inventory management. In order to improve the efficiency and effectiveness of production planning, the company has implemented several methods and techniques. First, the company uses the method of forecasting product demand for future periods. The results of this forecasting are used for production planning using aggregate planning methods, especially the Trial-and-Error method. To determine raw material needs, here the company uses the Economic Order Quantity (EOQ) method to calculate raw material inventory needs with the aim of minimizing inventory costs. Results from the use of the EOQ method shows that the inventory cost of raw materials produced is smaller compared to the previous inventory policy used by the company. This indicates that the EOQ method provides better efficiency in raw material inventory management, reduces inventory costs and allows companies to have appropriate safety stock and reorder more effectively. Thus, the conclusion that can be drawn is that the application of the EOQ method in raw material inventory management provides better results, with lower inventory costs compared to previous policies implemented by the company. This illustrates that using the EOQ method can help companies in more efficient and effective inventory management.
ANALISIS KINERJA SIMPANG BERSINYAL PADA SIMPANG LAKARSANTRI – DRIYOREJO MENGGUNAKAN METODE Sani, Naufal Yafi; Hartatik, Nurani; Fatmawati, Laily Endah
Jurnal Ilmiah Teknik dan Manajemen Industri Vol. 3 No. 2 (2023): Jurnal Taguchi : Jurnal Ilmiah Keilmuan Teknik dan Manajemen Industri
Publisher : LPPM Universitas Bina Bangsa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46306/tgc.v3i2.195

Abstract

In this modern era, the increasing development of science and technology has led to an increase in human activity which is followed by an increase in vehicle capacity and a decrease in pedestrians. So transportation needs will increase. In Surabaya, the need for transportation has become a primary need for very dense city residents and the situation at the Lakarsantri – Driyorejo intersection uses 3 signal phases with the 311 type intersection, where if one arm of the intersection is in the green phase, the other two phases are in the red phase and vice versa. This is very busy during peak hours such as in the morning, namely at 07.00-08.00, that time is usually busy due to the time of going to work, school and so on and during the day, namely at 12.00-13.00, office break time, school time. Used in this research is the 1997 Indonesian Road Capacity Manual (MKJI 1997). This research carried out traffic surveillance on the number of vehicles passing, intersection capacity, and the degree of saturation. From the research results, it was found that the highest traffic volume at the intersection of Lakarsantri – Driyorejo, Surabaya City occurred on Thursday at 17.00-18.00 WIB, Jalan Lakarsantri (West) was 630 pcu/hour, Jalan Menganti (East) was 473 pcu/hour, and Jalan Driyorejo was 657 pcu/hour. And it has an average degree of saturation of 0.95.

Page 2 of 2 | Total Record : 14